Council archive · source document
REFERENCED DOCUMENT - Weed Management & Vegetation Rehabilitation Plan - MCU13/0064
Plans and drawings: the text below has words only, no drawings.
Duke” Environmenial Environmental Management Consutlants ELEMENT: ENVIRONMENTAL PROCEDURE EP012 REVEGETATION Approximate areas and planting density Zone:2 -Supplementary rehabilitation planting 3302m? This zone is to consist of supplementary plantings to aid waterway protection and act as a mitigation measure to minimise any potential erosion. Revegetation plantings shal! extend approximately 5m (min) from the river top of bank. Planting for buffer areas are to be at the following minimum densities: e Trees: 2m centres e Shrubs: 2m centres ¢ Groundcovers: 1m centres Species appropriate to planting are listed in Appendix D. Zone 4- Grassland rehabilitation planting 183m? This zone is to consist of rehabilitation plantings to restore observed degraded areas of the intact native grassland. Revegetation plantings shall incorporate the.entirety of the degraded vehicular track (non- inclusive of proposed boardwalk). Plantings are to be at the following minimum densities: e Groundcovers: 0.75m centres Species appropriate to planting are listed in Appendix D. 3. Monitoring and Performance Indicators Monitoring will be undertaken on a 12 and 24 month basis by a suitably qualified consultant until the site is accepted off-maintenance to ensure that revegetation and rehabilitation has taken place in accordance with this Weed Management and Vegetation Rehabilitation Plan. The performance indicators will be the adequate revegetation and rehabilitation of the site in accordance with the objectives stated in “Section 4.5 — Project Monitoring and Performance Criteria”. 4. | Commencement‘and Timeframe Revegetation and Rehabilitation strategies should be implemented commensurate with weed removal and control strategies. The timeframe for the completion of the Revegetation and Rehabilitation element must comply with the Performance Criteria. The order of vegetation works is: 1.Stage One: Weed Management and Control followed as soon as practicable by rehabilitation plantings Where possible revegetation works shall be carried out during the warmer, wetter months of the year to provide suitable soil moisture conditions for seedling establishment. 5. | Responsible.Person / Organisation Revegetation implementation, monitoring, and reporting, and any necessary corrective actions are the responsibility of the Project Manager of the development. 6. | Reporting and Review Compliance reporting is the responsibility of the Project Manager. All incidents that create harm to flora or fauna are to be reported to a Council officer appointed for this purpose. Foltowing the designated monitoring schedule, the Environmental Consultant will inspect and confirm-satisfactory compliance of the works. AD07631REHAB. May 2007 SHjs Page 2 of. 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - Weed Management & Vegetation Rehabilitation Plan - MCU13/0064Related documentApplication case desk ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.