1763-0-1 A Stormwater Operational Works – 13-9-07
Construction Hydraulics
14. The development shall carried out in accordance with the approved plans listed below or as
modified herein.
15. Survey levels must be taken on the existing manhole in The Cockleshell, prior to works
commencing, to ensure that the internal drainage can drain via gravity means to the manhole.
16. Roof and surface runoff connection to Council’s drainage system shall be as shown on
drawing No. 1763-0-1A.
17. A Traffic Management Plan for the development addressing all construction phases shall be
prepared by suitably qualified persons and submitted to Council for approval prior to the pre
start meeting. The report shall address, but not be limited to, all items listed below, further the
plan shall be flexible that it addresses all stages of the development:-
17.1 A single nominated access location to from the site.
17.2 Provision of onsite parking for personnel working on this development, as
there is limited parking available in adjacent streets.
17.3 Provision of safe cycle and pedestrian movements around the development
on Gympie Terrace and The Cockleshell.
17.4 No queuing of trucks is permitted on residential streets, especially prior to
7.00am. Further parked trucks must have engines turned off.
17.5 Provision of signage and traffic controllers in accordance with Manual of
Uniform Traffic Control Devices and Traffic Infrastructure (Roads) Act.
18. A footpath 1.5 metres wide shall be constructed across the full frontage of the development.
The footpath shall have a slip resistant surface. The alignment, of which, shall be determined
on site with Council’s Construction Technical Officer. The expansion joints in any
bikeway/footpath shall be “sawcut” not trowel jointed.
19. Suitable sediment control devices ("in pit” pollution control devices) shall be temporarily
installed into the first existing external downstream stormwater structure.
These devices are to be checked and cleaned on a regular basis and specifically after each
rain event.
These devices are to remain in place during the civil works and construction phases of the
development.
The location and type of device to be installed shall be established at the “pre start” meeting
with Council’s Construction Technical Officer and shall be installed prior to the
commencement of any works.
20. Council’s Construction Technical Officer (ph 0410 512 505), shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
21. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any sub contractors also have the appropriate insurance and public liability
documentation.
22. Prior to the “pre start” meeting, the principal contractor must be provided with a copy
of Council’s signed approved drawings and conditions by the applicant.
Page 3 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00000215.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 64 KB (small file)
- File type
No other editions are linked here.