Fauna Management Plan
3-7 Serenity Close, Noosa Heads
4.2 CLEARING MANAGEMENT MEASURES
4.2.1 ACTIVITIES AND MANAGEMENT PROCEDURES
During clearing activities, there are several procedures and actions that must be followed
to ensure vegetation clearing is managed correctly, and that any fauna observed on site is
appropriately protected and managed. Procedures and actions include ensuring that a
Fauna Spotter is on site and managing the vegetation clearing activities, and that clearing
is occurring in a staged method that allows all fauna to move off the site unimpeded.
Table 2summarises the activities and management responses which need to be carried out
during the clearing phase of the development.
TABLE 2: CLEARING ACTIVITIES.
Action Task Responsibility Timing
Supervise 1) Licensed Fauna Spotter is to: Contractor, Immediately
clearing works a) Supervise and be present on each day Fauna Spotter, prior, during
that vegetation clearing takes place; Site Manager and following
b) Inspect site vegetation with contractor all vegetation
ahead of clearing to check for presence clearing
of fauna; activities
c) Maintain, a clear view of vegetation or
habitat features being cleared by
machinery, such that wild animals that
are disturbed or uncovered during such
activities are rapidly detected; and,
d) Maintain two‐way radio contact with
machinery operators during the removal
of vegetation or other potential habitat
features.
2) If wildlife is detected during such activities,
the Fauna Spotter must take immediate
action to notify the machinery operator to
cease work, either verbally using two-way
radio or by visual commands, until such time
as the wildlife is captured or otherwise
removed from danger. Trees containing
fauna must not be felled until the fauna has
been removed by a certified Fauna Spotter.
3) Wildlife observed to be using trees or other
habitat features prior to, and immediately
following, clearing activities to be managed
in accordance with management procedures
outlined under relevant fauna management
scenarios Table 4 and Table 5.
15 | 35
Document Set ID: 23516334
Version: 1, Version Date: 30/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Document Fauna Management Plan Rev 1 0 OPW25-0012.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.