Fauna Management Plan
3-7 Serenity Close, Noosa Heads
Action Task Responsibility Timing
5) The limb and/or compensatory habitat / nest
box will then be placed in a cool, quiet
location until translocation to the recipient
habitat site, when at dusk the hollow
entrance is re-opened to allow the fauna to
emerge of its own accord.
Directional 1) Directional vegetation clearing is to be Contractor, During
vegetation employed guide fauna towards retained Fauna Spotter, vegetation
clearing vegetation at the south of the site, allowing Site Manager clearing
fauna to leave the site and access retained
habitat without human intervention. Refer to
Figure 4 for clearing areas and direction of
clearing.
2) Habitat trees of high importance should be
felled last, after surrounding less important
vegetation has been cleared to allow easy
access of special plant and equipment (such
as cherry pickers), and to allow unhindered
lowering of hollow-bearing limbs. It is not
acceptable to fell or push over hollow‐
bearing trees without first removing wildlife,
due to the high risk of severe deceleration
and/or crushing injuries to wildlife inhabiting
such trees.
1) Retained trees are to be protected in
accordance with Australian Standard 4970-
2009 Protection of trees on development
sites as outlined in the approved Vegetation
Management Plan.
2) The approved Vegetation Management Plan
is to be provided to all contractors and
personnel involved in clearing and
construction activities on the site.
All machinery 1) Visually check all the machinery for the Fauna Spotter, Immediately
is to be presence of fauna before the start of Site Manager prior and
checked for construction. during
fauna before 2) Visually check all the routes for the presence vegetation
the beginning of fauna before allowing construction to clearing
of operations start.
Restrict vehicle 1) No vehicle access to areas of vegetation yet Site Manager During
access to be cleared. vegetation
2) Access is prohibited to vehicles outside of clearing
construction machinery.
3) Set lower vehicle speeds around the site so
that motorists have a longer response time
17 | 35
Document Set ID: 23516334
Version: 1, Version Date: 30/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Document Fauna Management Plan Rev 1 0 OPW25-0012.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.