Fauna Management Plan
3-7 Serenity Close, Noosa Heads
Action Task Responsibility Timing
Adaptive 1) Project manager to conduct regular Site Manager During
management, inspections to ensure compliance with vegetation
monitoring and procedures outlined in this plan. clearing
compliance 2) Project manager to issue notice of
compliance to contractor for non-conforming
works and any remedial works to ensure
compliance.
FIGURE 4: DIRECTION AND SEQUENCES OF CLEARING.
4.2.2 EQUIPMENT AND REMOVAL TECHNIQUES
During clearing works, the following special equipment may be required by the Fauna
Spotter and/or the clearing contractor:
● Standard personal protective equipment (PPE), including hard hat and steel capped
boots;
● First aid kit;
19 | 35
Document Set ID: 23516334
Version: 1, Version Date: 30/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Approved Document Fauna Management Plan Rev 1 0 OPW25-0012.pdfRelated documentApplication case desk ↗
About this file
- File size
- 18.4 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.