RAL23/0015 Development Application To Reconfigure A Lot (1 Lot Into 2 Lots & Access Easement) At 11 Billabong Way, Tewantin · Attachment 1 – (RAL23-0015) – Proposed Conditions
c. Remove excess fuels and combustible material (long grass, dead leaves, bark and
branches).
d. Trim low branches two metres from the ground surrounding the building envelope.
e. Display a prominent house or lot number, in case it is required in an emergency.
f. Ensure there is adequate access to the property for fire trucks – 4 metres wide by 4
metres high, with a turn around.
9. A clause must be included in the contract of sale for affected lots which requires future
dwellings to be constructed in accordance with any building siting and construction
requirements specified in the conditions of this approval.
Bushfire Management – Future Dwelling Requirements – Lot 2
10. All future dwellings on approved Lot 2 must be sited in accordance with the approved building
envelope. A minimum of a 14.2 metre wide asset protection zone from the building envelope
to the eastern boundary is to be provided, and maintained in accordance with the following:
a. Maintain understory and grass to meet no greater than 8 tonnes per hectare with grass
no higher than 300mm.
b. remove woodpiles, combustible material storage areas, large quantities of garden
mulch or any other form of stacked flammable materials.
c. Remove excess fuels and combustible material (long grass, dead leaves, bark and
branches).
d. Trim low branches two metres from the ground surrounding the building envelope.
e. Display a prominent house or lot number, in case it is required in an emergency.
f. Ensure there is adequate access to the property for fire trucks – 4 metres wide by 4
metres high, with a turn around.
11. A clause must be included in the contract of sale for affected lots which requires future
dwellings to be constructed in accordance with any building siting and construction
requirements specified in the conditions of this approval.
Stormwater Drainage
12. Stormwater runoff from the development must be disposed of on site without causing scour
or damage to the subject site or any adjoining property.
Services
13. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
14. Unless otherwise stipulated by telecommunications legislation at the time of construction, the
development must be provided with all necessary conduits, pits and pipes to accommodate
the future connection of optic fibre technology telecommunications.
15. Certification must be submitted to Council from all relevant service providers (Energex, NBN
and Unitywater) which certifies that the development has met the requirements of this
Decision Notice and all applicable legislation at the time of construction.
Easements
16. An easement for drainage purposes must be registered in favour of Council against the title
of Lots 1 & 2 which convey overland flows. The easement must be of sufficient width to fully
contain the 1 in 100 year ARI flows from the local catchment encompassing the development.
The easement must be granted prior to Council signing the Plan of Survey.
17. An easement for access and services purposes must be registered against the titles of Lot 2
in favour of Lot 1 over the proposed easement identified on the Approved Plans.