Council archive · source document
Town Planning Report - GSLC MCU Maintenance Sheds and Fence · MCU25/0099
“Adamson Town Planning, specialising in providing higher order town planning advice”
7.5 Driveway and Parking Code
While there is technically an increase in GFA for the proposed sheds, there will be no increase in the number
of students or teachers as a result of the new sheds. The matter of parking and access has been recently
considered under the preliminary approval (MCU23/0096) for the Master Plan. The GSLC will be providing
for improved parking and onsite traffic management for peak drop and pick up times in accordance with
the Master Plan. Consequently, the Driveway and Parking Code does not need to be considered further.
7.6 Water Quality and Drainage Code
With respect to stormwater management and water quality, the roof water from the sheds will be
discharged to the existing dam/bio-basin located between the proposed sheds near the eastern boundary.
It is not expected that there is a need to provide any further onsite treatment for the roof water leaving the
sheds, with the water to be contained onsite and used for irrigation on the school grounds. The proposed
development either complies with the Water Quality and Drainage Code or can be conditioned to comply.
7.7 Landscaping Code
As discussed, landscaping is to be provided along the eastern boundary and in between Sheds B & C.
Additional landscaping will be provided in places along the new acoustic fencing towards the north. The
landscaping being proposed will be consistent with the Landscaping Code, which can be conditioned.
8 Overlay Codes
The only applicable overlay is the Acid Sulfates Soil Overlay Code (refer Figure 6). While the proposed
maintenance sheds are located close to the area of the site that is 5m AHD or below, this does not mean
the site contains acid sulfate soils. In any event, minimal earthworks are required to construct the proposed
maintenance sheds. In the circumstances, the risk of releasing acid sulfate soils into the environment is
considered very low. In the circumstances there is no need for the preparation of an Acid Sulfate Soils
Management Plan, given the limited extent of earthworks required, being slab on ground construction.
Sports Shed
Maintenance Sheds
Figure 6 – Extract of Acid Sulfate Soils Overlay Code
9 Conclusion
24002 – Good Sheperd Lutheran College Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Town Planning Report - GSLC MCU Maintenance Sheds and Fence.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.