Council archive · source document
07/2243 - MCU - Detached House [As Published] · 132007.2243
UATEGRATED PLANNING ACT 199/
State-controfled road matters 2.
For mara information refer lo Guida 3.
Untess you answered "none of the abave’ fe Q2,
tha appicetion tiggers referal to the Qepartnent
QL Main Roads (DMA) as 9 refercal agancy.
In cemsin ceumstances DMR wif de an advica
agency, while if other crcuinslances DMR wil
be aconcurence agoncy, |
Schedule 2 of the IP Reautation «Al assist you to
dtlarmne wheto DMR is af advice oF
concurrence agency for the applitaticn.
Clearing vogotatlon :
Fot more information “eter lo.Gaide 12.
ed “none of the above" fo 03,
managet tor the 3 NR .
concurtance egancy'lor the application ih’rclation
olhis mallee
Ut you ticked O34) 0 (i), your applicatien ragiiras
rofertat to NAW ter assessment rogardiess of
whether vagatation Cleailng ts, proposéd.or not
TE
Strategte port tand
Fox more information refor to Guide St.
H you decked {})- the iclovant Part Authority is the
assessment managor far [he application.
it you teked (i) Quoenstand Transporlis a
concurcace agency (nt the application.
LY (ii) none of the above
3. The application involves: (tick appicadie box/es)
IDAS Assessment Chechlist, Version 20,2 April 2007
The application involves: (tick appicabie box/as) ~
{J ()) development on land contiguous* to a State controlled road and for -
(D(a) material change of use assessable against the planairg scheme;
(DQ) recontiguring a lot untess -
+ the total number of lols is nol increased; and
+ the total number of lots abutting the State-contolled road is not increased;
C1 (c) operational work (nat associated with a material change of use assessable agains! the
planning scheme of reconliguring a fol mentioned in (b) abovt}+
» associated with access to a Slate-controlled road; 0
» {or filling or excavation; or
+ involving the redirection or intensification of site stormwater from the land, through a
pipe with 2 cross-sectional area grealer than 625 cm? that direcis stormwater to a
State-contolicd road.
(ii) development on land not contiguous to a State-contralled toad and -
(1 (a) material change of use - ‘
+ assessable against the local government's planning scheme; ard
+ mentioned in schedule 5 of the IP Regulation and exceeding the Ihresholds set by
that schedule;
1 0b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
‘and exceeding the thresholds set by that schedute;
O(c) operational work {not associated with a material change of ute acsgesable against the
planning scheme or recontiguring @ fot mentioned in (b) abovo}- .
+ assessable against the local government's planning scheme; and
« mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
that scheduto.
(i) material change of use -
(2) assessable against the planning scheme;
(b) on a tot containing =
= acategory 1, 2 or 3 urea shown on a property map of assessable vegetation; or
« ifthere ts no property map of assessable vegetallon fcr the lot - remnant vegetation,
(c)_ where the existing use of the land is a rural or environmental use, and
{d) where the size of the land is 2 hectares or larger -compicte Part J of Farm t
reconfiguring a lot-
(a) on alot containing a category 1, 2 or 3 area shown on a property map of
assassable vegetation or, if there is no property map cf assessable vegetation for
the lot, romnant vegetation;
(b) where the size of the lot before the reconfiguration is 2 hectares of larger;
{c) where 2 of more lots are created; and
(d) where the size of any lot created is 25 hectares or smaller - complete Part J of Form 5
Cli) operational work -
(a) for the clearing of nalive vegetation where the vegetation clearing
assessable under Schedule 8 of the IPA; and
(b) not associated with a material change of use assessable against the planning
scheme mentioned in {i) or reconfiguring a lot mentioned in (i) - complete Mart J of
Form { -
{Hi fiv) none of the above.
Ow
ts made
Sot EA,
The application invoives:
(2) fi) devetopment on strategic port land as defined in the Transport infrastructure Act 1994 (TI
Act) - complett Part 1 of form t
Didi) 2 material change of use thatis inconsistent with the land use plan approved under the
TI Act for the strategic port {and . complete Pad t of Form 1
[& (iil) none of the above
4 band contiguous ta a Slata-controt
Sontmniied wx.
road ig Unfined in schaduta 14 of ine IP Reguiatan to menn tebd «il part of tha fand is within 100m of tha Stat-contriled oad; or thal 's part oi afuture Stake.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2243 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.