Council archive · source document
07/2243 - MCU - Detached House [As Published] · 132007.2243
INTEGRATED PLANNING ACT 1397
Operational work that is tidal work or
work in coastal management district
For mare ictormation ruter to Guide 18. For
move Information about prutcribed Sdal watk in
local government tidal areas voter to Guide 24
Uniess you ancwered “none of the above’ lo O9,
tra eppScatlon requires assessment by the
Envitonmental Projection Agency (EPA)
(fan agency other then EPA is lhe assessmont
manager for the applicaten, CPA is a
concurrence agency for the apafceton in
Tefation lo this mattar.
‘Letal government fs tha assossmem manager
for 33 prescfibed Bal work,
IDAS Asses nm Checklist, Version 20.2 Api 2007
9. The applicalion involves operational work that is: { ick the eppicaifetoves)
(OQ _ tidal work'® as delined under the Coastal Protection and Management Act 1995 (the
Coastal Act) that is nol prescribed tidal work - complete Pat Nol Form 7, OF
Ci) tidel work that is prescribed tidal work"' other than in acana’ -complels Pat Pof Farm t;
of .
Ci fii) cared out within a coastal management district under the Coastal Act and for -- compier
Patt M of Form 1 if any box/as {9} 10 (i) below are ticked.
CA{@) constructing or instafling works in a watercourse between MHWS and HAT (io.
other than those works in tidal wate where the development has been determined not
to be assessable against the Water Act 2000 ;
constructing 2 canal intended to be connected lo fidal waters;
constructing an arificial waterway,
feciaiming land under tidal water,
disposing of dredge spoil or other solid waste material in tidal water;
interfering with quarry material on State coastal land above high-water mark;
draining or allowing drainage or flow of walter or other matter across State
. coastal land above high-water mark,
Lith) removing or interfering with coastal dunes on land, other than State coastal land,
thatis in an erosion prone area and above high-water mark;
Tq) constructing a bank or bund wail to establish a ponded pasture on land, other
than State coastal land, above high-water mark; or
[Xi iv) none of the above.
Ow)
Oe
OM
Ole)
DW
Of
Operational work below high, water \
110. The application involves operational work that is: { fiek the appficatle
box/es)
mark information refer to Gj sito 18 F CO q) tidal work"? as defined under the Coastal Protection and Management Act 1995 (the
more information aboui preacelbed Eda Coastal Act) that is not prescribed tidal work - comptate Pat M of Form 1; OF
naeein ee Gu , * (C1 til) tidal work that is prescribed tidal work" - complate Parl Pof Fam 1; OF
Intass you answored “ri tho aber oe + Prey tet
Qie. be sstiton viggent renal . CO iii) caried out within a coastal management district'> underthe Coastal Act and {or -
Queenstand anspor (OT) (iors Safety i i ial in ti
OMaee cman wot Sen. fie Set Dw disposing ot dredge spoil or other solid vaste material in tidal water - complete Pat
Local gavermant|ithe Azscsement manage? ofForm i
for all prescribed ids work. : Ch lb) reclaiming land under tidal water - complete Part M ofFonn 1, OF
Oto) constructing a canal, if the canal is associated with reconfiguring a lot - complete
Part M of Form 1
{% (iv) none of the above.
Coastal management: 41. The application involves; (ick tho apptcable box’es) .
For maxe intonation safer to Sulla 18, Cf} a material change of use assessable under a planning scheme involving operational
OTe aneane scons aneanneat & tne work carried out completely ar parily in a coastal management district
Envbonmental Protgefion Agnacy (EPA). Cqi) a material change of use assessable under.a planning scheme involving building
Ut an agency othur than EFA is fe assessment work, carried out completely or partly in a coastal management district that is ~
aa a orca be opafosion i + the construction ef a new premisos with a GFA" of at least 1000m?
ralatica to this matter. » the enlargement of tho GFA of exisling premises by mere than 1000mt
Cli) reconfiguring a tof assessable under schedule & of the IPA where the land is situated
completely or partly in a coastal management district
Civ) reconfiguring a fot!? assessable under schedule 8 of the IPA and in connection wilh
the construction of a canal - complate Part M of Form 1
Ty) none of the above
~ ee
UD Fetal work is dofinad in sch 10 of the WA,
41 Prescribed ial work is dellned It tha Coastal Protnation and Managament Regulation 2003 ana inchetes nenain loal works compiclely or partly within a focal government taal area.
12 Canal nieand canal av defined undes the Caustd Protection and Management Act 1995
13 Tidal ork is oefined tn sch 10 f the IPA.
44 Prescribed fal work Is ucfnred in the Cosstal Protection rex Management ftequiation 2003 3r0 inuces
15 Conslal anogamont onside! ia dehy ie sch 10 of the (PA and moans 3 coastal managemanl distdet unde Me Cogsiat Protection and Management
east managemen! cisiriet under section 47(2}
18 GFA is defined fn ach 14 of the IPA te moiin Ihe gross foot
17 Undet $117 of the Coastal Protection and Managsmant Act 1995, an application tor reconfiguration,
Aetumpatiad by tha application for tha operational works lo construct the artinelal waterway,
certain fidal works comnplotely 07 parily within a local povernment Laat orca
Act £995, otharthanan ares decarcd ay a
of that Act,
'gf83, For a datialtion af how to calculated GRA, go le thir, planning seheave agnbid which the eppicaban
whee Ihe reconfiguration fs associalod with the consiuxcton of
In bela ashansed
aun Ucilicial wruloeway, dtust lit
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/2243 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.5 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.