NOOSA COUNCIL
APPROVED PLANS
OPW15/0026 16 MAR 2015
[OCR of page images]
DRAWING SIZE - A2
Revision | Description Date
THE ANCHORAGE ROAD
_ 4500
r 78 t |
BI
| \ 8 a
\ NOTCH
t
1
1 ¥ fh, a)
\ es VO
| \ | RECESS BEARER &
| STRINGERS 25 NOM INTO
\ PLE,
Vv
t
I | SPLICE JOINT DETAIL
| \ “Oo 1:20
:
Hy 1 RIGD HAHDRARL TO COMPLY
i \ WWTH COUNCHL REGULATIONS
| | MAXIMUM RECORDED FLOOD LEVEL RL. 200 AHD
: — _ M 0 hi oe oe
i \ TOP OF WAL RL. 1.0 AHD
IS Lo. —
zn Lot 797 Ble DEK RL 1.0 AND — — .
8 g Wek 0 3 \8 — "7 WAYMUN WATER RL 044 AKD _ " - |
| ) ) v eal! eal} en H FEOENENT
* I WALL
| \ yt \
| Fa Poy ty ti 8
| | | | Hel 8 t
'
| i tg IR) l
| wor t | 5 Ht i Vt
' \ 1, UNLESS NOTED OTHERMSE ALL TIMBER SHALL BE DURABILITY CLASS 1.0F |] il nal
| ‘ APPROVED SPECES AND HAVE A WIMUM STRESS GRADE OF FI4 Min, U Wg Ye te
‘ ‘
2, UNLESS NOTED OTHERMSE ALL CONSTRUCTION SHALL COMPLY WTH THE ~ —~
\ ENVIRONMENTAL PROTECTION” AGENCYS'“ OPERATIONAL POUCY = "BUILDING =\ FRONT-ELEVATION = SIDE-ELEVATION
| \ AND ENGINEERING STANDARDS FOR TIDAL WORKS.” ho Ow
| Gee Si. AL OTHER SER. WORK HOLDING NUTS, BOLTS, WASHERS Oo NOT A ETTY
1
| \ AND SOREWS SHALL NOT BE HDG OR STANLESS STEEL, TO REVETMENT WALL BASTING REVETMENT WALL
| } 4 TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED OR RINGED
| 1 WTH AN ALUMINUM ALLOY OR STAINLESS STEEL BAND, y _ aE
1 ) :
THE BEGHT OF THE PHLES ABOVE
| mst 4983 - 5, DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM THESE DRAWNGS / oF Ive PGT Of TH PRES Ae
a aS wre ay aes s fanscaae™
1 = = 7 \
ES LOADING CRITERIA: \
| — ‘ ETTY \
! ES § \ UVE LOADS = 2,0kPa
| = pRoptsen JETTY MOORED VESSEL (Marx.
: s = | — Bade LENGTH 0m 3
Low 3 DESICR, ELEMENTS WEIGHT = 1500Kg
Uy Bw, \ BERTHING VELOCITY = 0.5m/sec
4100,
\
SITE PLAN
Scale 1:200
NOOSA COUNCIL
APPROVED PLANS
OPW15/0026 16 MAR 2015
vETTY FRAMING SCHEDULE
MARK SZE/GRADE
(Pi) [2008 HE TREATED HOW) PIER
dh | 150 x 75 (F14) JOISTS © 750ctrs
Bt | 150 x 75 (F14) BEARER
B2 | 175 x 75 (FI4) BEARER
BS] 200 x 75 (FIA) BEARER
= Ai exponed timber 1s be HE trnatid.
Rnann—t_F—t__fim1:100 @ A2
Issue:
CONSTRUCTION
OERUILO TA
Kod)consuting ENGINEERS
STRUCTURAL eGiVILeGEOTECHNICAL
ABN 40 098 481 899
1/11 PROJECT AVE NOOSAVILLE QLD 4566
Ph (07) 5455 5604 Fax (07) 5455 5696
Title: Jetty Plan and Details.
Project Lot 797 (#35) The Anchorage
Noosa Water
Date: Feb 2015 Drg No. 25075-J1
Rev, 30.01.05
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
OPW15/0026 APPROVED PLANRelated documentApplication case desk ↗
About this file
- File size
- 939 KB (small file)
- File type
No other editions are linked here.