Council archive · source document
00154987.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
Ss 4
a
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 Apri! 2007
Integration of land use and public = 22. The application involves: (tick the applicable box/es)—
Fae tortion refer to Guide 23, schedule (7 (i) a material change of use assessable against the planning scheme for a purpose
8A of the IPA, & schedule 2 of the |P Reaulatign. mentioned in schedule 13C of the P Regulation and exceeding the thresholds set by that
Unless you answered “none ot the above’, the . schedule.
ication triggers seferral to QT as a
concuence agency. “ry. 2 (7) (ii) reconfiguring a lot—
rr ee (] {a} on land that is completely or partly within a public transport corridor, and the
Coote a ay ; total number of lots increases;
i - a a : o = : . [J {b) on land that is completely or partly within a future public transport corridor or
pt Sg ee an airport's public safety area;
poate te hag (i {c) — oniand that is within 400m of a public passenger transport facility or a future
mpm oS ee public passenger transport facility, and the total site area is 5000m? or greater;
. 7 ne - oe oe ‘ [1 (d) for aresidential purpose within the 25 ANEF contour for an airport;
os arta ae “Pope ak (1) {e) for a residential purpose resulting in 100 or more allotments.
gg ae ts eS (J {iti} operational work assessable against the planning scheme, but not associated with a
Fee es material change of use mentioned in (i} above or reconfiguring a lot mentioned in (ii)
ge RE EE ly ae above, on land that—
es a ee . ((a) is completely or partly within a public transport corridor or a future public
pa Rt Fo Bey el transport corridor;
woe mee a . 2 Spee (J (b) will result in work that encroaches into an airport's operational airspace. @
Se en tT wie OE ey
fe 3 FEE He | Mi (ivnone ofthe above oe,
Railway safety and efficiency “7 | 23. The application involves: (tick the applicable box/es)—
aeons ie bateae? ae schesite [I (i) a material change of use assessable against the planning scheme for a purpose
M iecs VG Sa one of coke ne mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
j Spalication triggers referral to QT as a 2 schedule.
zporeyence agency Sag ou Be C (ii) reconfiguring a lot
gE g a ag [) (a) on land that is completely or partly within a future public transport corridor,
3 th eS ann — 3 future railway land or a railway tunnel easement:
gt af % Seah ee “ea | C) (b) on land that is within 400m of a Citytrain passenger railway station or a future
ree eee een * Citytrain passenger railway station, and the total site area is 5000m? or
EP Eee igs Gee greater, :
ee Bites 7 Og ge ae (l(c) on tand that abuts rail corridor land, commercial corridor land or future railway
ge ak es Boag i Bose land, and the total number of lots increases:
pe RRO Sa ot CJ id) on tand that abuts rail corridor land, commercial corridor land or future railway
Bi ER AP eh ne! Ret land and an easement abutting the corridor or future railway land is created;
Bo NE OR [J (e) on tand that is completely or partly within 100m of, and abutting an approach
re fo * “ope 3 ee to, a railway level crossing, and the total number of lots increases; :
Mo gate Fe: Loo (1) (f) for a residential purpose resulting in 100 or more allotments.
he ere (_] (iii) operational work assessable against the planning scheme, but not associated with a
AB ee material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii) @
ann ET Bey kes gy above, involving extracting, excavating or filling greater than 50m3, on land that—
a aes ae: ro [J (a) _ is completely or partly within rail corridor land or commercial corridor land, and
Fda age ARS oe the work is not for rail transport infrastructure or other rail infrastructure;
= ie hg * oan [_] (b) is completely or partly within future railway land, or a railway tunnel easement;
bes, oe : Cee & 7 i Bey . C(c) abuts rail corridor land, commercial corridor fand or future railway land, and .
EL ae to the work is within 25m of the railway boundary.
Cope tw ae Us gestae {iv} none of the above.
.Moonie to Brisbane pipeline". :’* | 24. The application involves the easement for the construction or operation of the Moonie to
«For more information refer to schedule 2ot the IP Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
Besar ce ‘edinos ohne tits | L}(i) a material change of use assessable against the planning scheme and not associated
. - application triggers referfal to the'holder of = with reconfiguring a fot, and any structure or work will be located wholly or partly in the
‘Aerie corny Sous CAT yUK | qh reconfiguring a
AGI Wed, CUTEABY Santos SINT Py Ne Or ji) reconfiguring a lot
ae ; ee L]fiii) operational work assessable against the planning scheme, that is filling, excavation,
. . es compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
Ns . work is located wholly or partly in the easement.
. . {iv) none of the above.
Page 8 ,See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00154987.001.pdfRelated documentPublic source context ↗
07/1239 - MCU - Dwelling Additions [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.