Council archive · source document
00154987.001
Text sections not matched to the original PDF pages. See original document to check page numbers.
; 4
. 7
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 20, 2 April 2007
State-controlied road matters 2. The application involves: (tick applicable box/es)
a more eee pan (i) development on land contiguous to a State controlled road and for -
Mess yOu f ni ie ve . . . .
the application triggers referral to the Deartment (_] (a) material change of use assessable against the planning scheme;
agency, while in other circumstances DMR will « the total number of lots is not increased; and
be a concurrence agency. oo « the total number of lots abutting the State-controlled road is not increased;
Schedhhe 2 of the (F Reuition assist you to (J (c) operational work (not associated with a material change of use assessable against the
concurrence agency forthe application, planning scheme or reconfiguring a fot mentioned in (b) above)—
en er ae ote? « associated with access to a State-controlled road; or
ogre? ¢ for filling or excavation; or
moet oo « involving the redirection or intensification of site stormwater from the land, through a
: mee wo ‘ pipe with a cross-sectional area greater than 625 cm? that directs stormwater to a
an State-controlled road. .
of oe ete . {_] (ii) development on tand not contiguous to a State-controlled road and -
. ar a oy . Pp
a a (1) (a) material change of use -
ars soy. . : ‘
ee » assessable against the local government's planning scheme; and
MR tg ‘ I « mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
co fig eM en ne that schedule;
OOO OEEUE np RW LD (b) reconfiguring a fot for a purpose mentioned in schedule 5 of the IP regulation
. a and exceeding the thresholds set by that schedule; ©
rag Be (i (c) operational work (not associated with a material change of use assessable against the
wee, a, aos planning scheme or reconfiguring a lot mentioned in (b) above)—
. yee, work ee A Aes + assessable against the local government's planning scheme; and
Se ewe Be * mentioned in schedule 5 of the IP Regulation and exceeding the thresholds set by
cr that schedule.
so ye eae we Dg (iii) none of the above
Clearing vegetation ;-.. “+. 13, The application involves: (tick applicable boxes)
For more information reler to Guide 12... LJ (i) material change of use -
less you answered “none of the above" to.03, . .
the atation ceuies coeexsment bythe .. (a) assessable against the planning scheme;
Department of Natural Resources and Water * (b) on a lot containing —
(NRW) 2S SOR ah eager ie
fan égenty other than NRWis the assessment = acategory 1, 2 or 3 area shown on a property map of assessable vegetation; or
manager for.the application, NRW isa) ** e if there is no property map of assessable vegetation for the lot - remnant vegetation;
- concurrence agency, fet fhe applcdtan in relation (c) where the existing use of the land is a rural or environmental use; and
you ticked asa or (i, your application requires (d) where the size of the land is 2 hectares or larger - complete Part J of Form 1
rca cece | COG) reconfiguring a fot -
CE ae es (a) on alot containing a category 1, 2 or 3 area shown on a property map of ,
a re : assessable vegetation or, if there is no property map of assessable vegetation for
ie Gh a a the fot, remnant vegetation; @
, i a (b) where the size of the lot before the reconfiguration is 2 hectares or larger;
te Bhai ee | (c) where 2 or more lots are created; and
a . {d} where the size of any lot created is 25 hectares or smaller - complete Part J of Form 1
of Be Op ase 5
RR CJ (iii) operational work -
ce (a) for the clearing of native vegetation where the vegetation clearing is made
ee ta | assessable under Schedule 8 of the IPA; and
a, rn | .. 7, (b) not associated with a material change of use assessable against the planning
ee Looe ~~. “ scheme mentioned in {i) or reconfiguring a lot mentioned in (ii) - compete Part J of
Ss 2 Form f
SO - : (iv) none of the above.
Strategic portland - 14. The application involves:
i, etme ae Sie ob LJ ()) development on strategic port land as defined in the Transport Infrastructure Act 1994 (TI
fst ee ease ct comp Pa of Form |
. . Ifyou ticked (i) Queensland Transport is 3 LJ (if) a material change of use that is inconsistent with the land use plan approved under the
concurrence agency { or the application. TI Act for the strategic port land - complete Part | of Form 1
(iii) none of the above .
. \
, 4 Land contiguous to a State-contrlled road is defined in schedule 14 of the [P Regulation to mean land - if part of the land is within 100m of the State-controlled road; or that is part of a fulure State-
controlied road.
Page 2See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
00154987.001.pdfRelated documentPublic source context ↗
07/1239 - MCU - Dwelling Additions [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.