Skip to the record
Noosa’s premier civic archive.

Council archive · source document

MCU14/0073 Combined IDAS Forms

of 23

Text shows just the words. Original shows the document exactly as it was published.

     If you answered no to all of the above, a development permit is required and this application requires assessment
      by the chief executive of DSDIP as assessment manager or concurrence agency against the Queensland Heritage
      Place State Code in the SDAP.
     Your application must include IDAS form 3—Queensland heritage place.
     If you answered yes to any of the above, a development permit is not required. End of part 3 of this checklist.

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 5, item 2
     Sustainable Planning Regulation 2009, schedule 7, table 2, item 19

Part 4—Local heritage place

4.1    Do any of the following apply to the proposal?

The development is building works to be carried out by or on behalf of the state, a public             Yes          No
sector entity or a local government
The development is for public housing                                                                  Yes          No
The development is to be carried out by the state on land designated for community                     Yes          No
infrastructure under the Sustainable Planning Act 2009.
The development is mentioned in schedule 4 of the Sustainable Planning Regulation 2009.                Yes          No
The local heritage place is on an airport lessee’s airport land under the Airport Assets               Yes          No
(Restructuring and Disposal) Act 2008.

     If you answered no to all of the above, a development permit is required and your application to the local
      government, as assessment manager, must include IDAS form 4—Local heritage place.
     If you answered yes to any of the above, a development permit is not required.

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 5, item 3
     Sustainable Planning Regulation 2009, schedule 3, part 2, table 1, item 1
     Airports Assets (Restructuring and Disposal) Act 2008, section 54

Part 5—Strategic port land or airport land

5.1    Does the land use plan for the strategic port land or airport land state that the development is
       assessable development?

      No          A development permit is not required for this aspect of development; end of this checklist.
      Yes         A development permit is required and your application may include, where applicable:
                       for a material change of use—IDAS form 5—Material change of use assessable against a
                        planning scheme
                       for building or operational work—IDAS form 6—Building or operational work assessable against
                        a planning scheme
                       for reconfiguring a lot—IDAS form 7—Reconfiguring a lot
                  The assessment manager will either be the local government or the port authority or DSDIP.

Section reference:
     Sustainable Planning Regulation 2009, schedule 3, part 1, table 5, items 6 and 7


                                                                             Checklist 1—Various aspects of development
                                                                                         Version 3.1—20 December 2013

Used in these records

About this file

File size
147 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

MCU14_0073 Combined IDAS Forms.pdf · 147 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.