Skip to the record
Accept no substitutions.

Original source · versioned page text

4. Town Planning Report

of 29

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

2.4       INFRASTRUCTURE/LOCAL GOVERNMENT INFRASTRUCTURE PLAN
2.4.1     SERVICES

The site is currently serviced by reticulated water, sewer, telecommunication and electricity services.
The water, sewer and stormwater infrastructure can be seen in Figure 5 below:




                               Figure 5 – Existing water and sewer infrastructure


2.4.2     LOCAL GOVERNMENT INFRASTRUCTURE PLAN

The subject site is located with the Priority Infrastructure Area (PIA). The subject site adjoins an existing
trunk pathway (footpath) and existing trunk road being David Low Way, which is designated as a
distributor road.




PLANNING REPORT – Revision A                  DEC 2021                                            P a g e | 12
Log in to download the original file

4. Town Planning Report .pdf · 1.4 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.