Original source · versioned page text
4. Town Planning Report
4.5 SERVICING The proposed development will include a single refuse storage area located along the site’s southern boundary and behind the 2m landscape buffer. It is proposed that the wheelie bins will be taken to site’s kerb side for collection. 4.6 INFRASTRUCTURE The subject site is located within a well-established urban area, with access to existing urban infrastructure. An Engineering Report has been prepared in support of the subject application and is included as Appendix E. The site has existing connections to reticulated water, sewer and is serviced by overhead electricity. It is understood that a new fire hydrant will be required to service the development. The new hydrant is proposed to be connected to the water main located within the front verge. 4.7 STORMWATER MANAGEMENT Stormwater drainage and management is required as part of the development. The Engineering Report and accompanying plans demonstrate how Stormwater is proposed to be managed as part of this development (Refer at Appendix E). 4.8 EARTHWORKS The proposed development will require bulk earthworks to be undertaken to facilitate the new use. Some excavation will be required to facilitate stormwater management and vehicle access and manoeuvring on site. The details of the proposed earthworks are outlined in the Engineering Report and accompanying Engineering plans (Refer to Appendix E). PLANNING REPORT – Revision A DEC 2021 P a g e | 18
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.