Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Noosa Spit SEMP Final Report                                                                       103
References




6       References
        Barnes, M.P., Visser, J. and Fisk, G. (2017). Implementation of Trigger-Based Coastal Management
        Strategies, Coasts & Ports 2017 Conference.

        Collins (1972). Prediction of shallow-water spectra, Journal of Geophysical Research, Volume 7,
        Issue 15, Oceans and Atmosphere, 2693 – 2707.

        Geoscience Australia (2017). High-resolution depth model for the Great Barrier Reef, Beaman R.J.

        Fisk, G. & Kay, R. (2010). Dealing with uncertainty in climate change adaptation planning and
        developing triggers for future action, Practical Responses to Climate Change Conference 2010,
        Melbourne, September 2010.

        Commonwealth Government (2015). EPBC Act Policy Statement 3.21 – Industry guidelines for
        avoiding, assessing and mitigating impacts on EPBC Act listed migratory shorebird species.
        Commonwealth Department of the Environment, Canberra, Australia.

        ICM (2010a). Option Review Noosa River Spit, prepared for Sunshine Coast Regional Council.

        ICM (2010b). Noosa River Spit Erosion Protection Works Drawing Register, 23 November 2010,
        prepared for Sunshine Coast Regional Council.

        MSQ (2019). Queensland Tide Tables 2017. Maritime Safety Queensland.

        O’Brien, M. P. (1969) Equilibrium Flow Areas in Inlets on Sandy Coasts. Journal of the Waterways
        and Harbours Division. ASCE No. WW1, pp.43-52.

        Queensland Government (2012). Queensland coastal risk and bathymetric LiDAR: a pilot study for
        collecting near-shore bathymetry. Queensland Department of Science, Information Technology,
        Innovation and the Arts, Brisbane, Australia.

        Saha, S., and Coauthors (2010). The NCEP Climate Forecast System Reanalysis. Bull. Amer.
        Meteor. Soc., 91, 1015-1057.

        Saha, S., and Coauthors (2014). The NCEP Climate Forecast System Version 2. J. of Climate, 27(6),
        2185-2208.

        Tomlinson and Chamberlain (2006). Noosa River Entrance Channel Dynamics, Griffith University,
        CRC for Coastal Zone, Estuary and Waterway Management, 1 – 75.

        van Rijn, L.C., D.J.R. Walstra and M. van Ormondt (2004). Description of TRANSPOR2004 and
        Implementation in Delft3D-ONLINE. Z3748.10 – report prepared by Delft Hydraulics for DG
        Rijkswaterstaat.

        WMA Water (2017). Noosa River Flood Study Upgrade, prepared for Noosa Shire Council, March
        2017.

        WRL (2014). Riverbank Vulnerability Assessment using a Decision Support System: Clarence River
        (Rogans Bridge to Ulmarra), WRL Technical Report 2014/12 December 2014.




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 62 sections

Section 2

Noosa Spit SEMP Final Report                                           A-1
Metocean Data Collection




Appendix A                Metocean Data Collection




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx

Section 3

                                                                    BMT Eastern Australia Pty Ltd
                                                                    Level 8, 200 Creek Street
                                                                    Brisbane Qld 4000
                                                                    Australia
                                                                    PO Box 203, Spring Hill 4004

                                                                    Tel: +61 7 3831 6744
                                                                    Fax: + 61 7 3832 3627

                                                                    ABN 54 010 830 421

                                                                    www.bmt.org

Technical Memorandum
                                                                  Noosa Shire Council
    From:      Matthew Barnes                            To:      Daniel Wishaw
    Date:      29 March 2019                             CC:
    Subject:   Noosa Spit SEMP - Lower Noosa River Metocean Data Collection




1           Instrument Deployment Summary
To inform the Noosa Spit SEMP, metocean data collection has commenced including:

• The deployment of six tide recorders in the lower Noosa River to continuously measure water level for
    approximately six weeks. This data will be used to calibrate the hydrodynamic model and may also
    provide some valuable information to partially address concerns regarding the published tidal planes.

• Offshore fixed deployment Acoustic Doppler Current Profiler (ADCP) to continuously measure water
  level, current speed, current direction and wave parameters (height, period and direction). This data will
    be used to calibrate both the hydrodynamic and wave models.

• Boat-mounted ADCP measurements have been collected during both neap and spring tidal conditions.
  The measurements (from approximately low water to low water) were taken at Dog Beach, Noosa
    Sound, Munna Point and Noosaville. This data will used to calibrate the hydrodynamic model and
    understand the peak flood and ebb tide currents occurring at Dog Beach.

Figure 1-1 provides a map showing the instrument deployment and boat-mounted ADCP cross-sectional
transect locations. Table 1-1 provides a summary of the instruments. It is anticipated that the deployed
instruments will be retrieved in late April 2019.

Section 2 provides further details on the boat-mounted ADCP measurements




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx

Section 4

j                                                     FTI        ac Me 2
        ae                yd                                             eat                   a ee peated ci eo ee        :     :    ergy aq.)
             *                                                   Eo       pees    3      -
                      a,                                          Napa die, beyiee Eni                            =
                                                                 a
                          >                                         Ned    Pee             cf                 ers        ;      =
          y                                                                    rae   F          f    iS      a                          on       }
                                                                            ay       Pre      ak    oo                            eet
  |                  r                     a                                  fa ee G, Oe sae              eth,                   eee     mats]     &    <x
                                                                             eee Poa,          Nee         r    =                b       Ox    >:   en
                                                                             Se       aoe ie       awa     :    :                   bes       3
                     ;                                                        Vega 8. gh ia     Rg, KP     es                    i    SO
                                                                 \                 a bri ta Witenes %     -                       ost        ed
                     )                                                           a.     eat |                 s             OM           Pa
                                                                                      at TE           spre a     Pe       cpt ACS FO)
                                                                                     eae      bate .              te Bap h Bey Pres
                                                                                      Pas Bd pee              oO       i ae RNase
             =                                                                         | seh Td ee    as            iat ie    as       CHE a Fes,
                                                                                     peek                       OS ECT. cae a                                                    2
                                                                                     PRae ae                  2 SAT eee ee rape              AS                           mM    So
                   a                                                                      Wee             SBOE       RBS Eien             Gitar,
                  .                                                                   ipelaceee             Be Re RE MON                      g
                                                                                     | Se)             y            es POF)   peas 6]          -                                2
                                                                                    Fee             Te eects) e:                                                                E
                                                                                   peigaery”           SS SREB Ares yet vg Cag                                    2              s
                                                                                    bi Stes, df tse   My Se          eed PR tcres     oc ESP otnn
                                                                                    eS   Paap?            ete    ce Oia        ef      Re    sa                                  =
                                                                                  Fee           ry        wee   ete OE       met     eee       fa                 w&
                                                                                   Sate me     Kee,        TPR be biog Pep Me te fo      Ree                        &         1
                                                                                      aa      CRS ee         ORNS ieee   ge 1 Sn Be        ate                               s
                                                                               ) A                            er Na                                                 S       &
                                                                              f Bi        ah     e    Se       Cee aoe Sr aetna     ‘)              sg              Wat”
                                                                                     eT    Sep   eae    at     Se Ee        AT er ae                o    =
                                                                              ;      ;      ens        sh      EAS       eee Po ue  ee.             5      '
                                                                              4            eee OY Satie        Saag!      yy Sapir 7.               5
                                                                              ea            CN A                Pas         bs LTA        ee        iG   -—=
                                                                                       =      Sw       & s         ee      LT re td aa    aD Gi
                                                                             é      orf)                ea      ge}         21 Ease
                                                                                                   i                 ,                ey ay   win
                                                                                       2        se SR            BB                     ate
                                                                                <                  Oe arts .       oul yn               Sache)
                                                                   ye   4                           neste |       eo. Rtas.            ce Pe bed
                                                               ge   4        :           :         os eS              ta                                                £
                                                                      F                   ye      ARN at at 5         ae 3: » F          yay
                                                              4             ,                       SAGE RN                                                             =
                                                              PA             :             ae       HA ee               a
                                                           :      a            rn           se     ES Gea
                                                        a      iy          :                  .      4 ao     a
                          =                                   ££         ‘                    ?         i
                                                      ;      See        eee              .  fp        Wee atonal
                                            \               Ak”                     .             7      sa  Seg
                                                           ae)   C55                         4         at    ige ae   |
                                                  ad              Ss    <                        -     es os Sy coded        Perdis
                                       .            2                                       y            Papa               1 Rete    ae                                      ©
                                              ‘                             ’           ea          Me     ait    ag        rae yes
                                                                                        ei          ;     eee               Sill    re} S                                     =
                                                                                           i     .           Pe OE            By ee                                           8
                                                                                           a  a            FF    cas.   iti  e    ban                                   wf}?
                                      z,      =     -    %                             ,   cf                fa      -       ae     ie,                                      ><
                                            _y=                                          te Ben            ast Pe            eT       i                                 S      7
                                                                                         a           >       Si wh   met     ~   fb ee
                     re        ‘    sr.             3                                    ea                a ees          foes OME,                                           3
                   +"              Oa                  F                                 ae                 ae           eta ths ays                                          a
                                   a                                                        3                 Se        P peas: Te Lege                                       a.
                     Po        ae                                                                                       Bees       A a a                                      x
                                                                                                                          Hf ot Ou  Pe Fae
               ne       of                             ce                                                               Fe aD Nae       2
                 ae                                     a                                                               3 pals        to
             we          i                                      at  $a                                                  rakeeete's(S
——             eG Ot                                              gee      5                                     We  Sr      tle
           oe Ee E44                                                               mr                                     So  wigs J
       ae   ‘             :                  ‘                                                                          SY                                              °
  2     tte     iio  ie         c          x                                  |   ."                                  SN st >    4
         oe                                                                                                     ,       eee                    :
                                                   -                                ~                                   Sr tt                                                         :
                 eae                          iy     nee                         se                       ;                 Tis %                                                     $
  oo hi                                                                                                                   ete:
              ;    yee                           a      od ph ce         Be att    MP ae aS      te         a                ae             ;                                          i
                             :                       qe tey                      faite    unas:      ee        .              Kiss ie “                                 a<            5
                      é                         eon        SDA   ees          :    Pewee     any, f     :       bs            Media ve                                                °
   ‘               i  :                 i        ner   r      pe               *   Kc)    og   fps ‘   4   fice               sd      eS §                                            S
                    2          Fa  aes                  2a       a               eet    ght SAP a            s                 eee GALI Po) =                                         i
 eects              ibd     ag                     Ma                               ead 4             oe                        Soa eee                                              i
   Ct       E      ce         pi  rare         -        é                    Ep ES aie  a      sate ae        «               ee aa) rod    a
    Eat  eae                      is       d                         pate        Avan             gh Bowe tt  ee                 Stel Rea                                            5
        pet       iets                :                 5           Bara        ‘          Smeg apa gies       efor,              Sry eel                                             =
       ate        i.             Map ct        ;     :            weg, te           eS ray TAs ANE    3           7             Ser        ce Seal
   pas 3 Res   vasa ae      ee)         :      ,               ,    ieee     ..   ae Ee   oi; op     fans          - i"            “ oe       ee                      ag?           as
    Ee Seles SAN?   Askar Sy ae                eae                 S       ;      o¥5      See gee            =      ar           AG: Bereear! Mn                    Zee             =
 a       i           a         c   3              i     :                  Bes eaens  PIS PN A tah a pe            arm             eT      a
   eer ed Pine mene?               7           ,                  :       F       patina emir Sara                    ies           ie Se                            = ES            =a
   pore           ae                           me               :        ye ee                    Nar    Ree                         ters                            Bee             §
    ee RET aes          he ih                           :        ?     Baa      :   stat     ae fei SLES           PP aii             ve Et ae                       Be 5            a
  Caen GT Speioe             Shee             :               ash                              ene Mi eect       aaa                     rapes             Cc         oe      7      a
   arene Gs vein yee                                                                     ian         tee Bee    SN ra   ai                 gee            °o         5 ees          i:
  Sie hae Spas       Nera:         ‘                                   ;                pt              NCE    a  Sepia | |              eee             —            eo    iF       a
 BBE   Rete abe peer:        ?        %                                    f          RY tee   eas   My DR SN ee  mgt le ALE  3         BS A
 PA            Nae Pas       Gra  Leet ae AAO ean         :                   2         pe ena     ay el          Set KS |              ohh              =            Foe            ze!
  bee Ge     eae   ee    5                  ei      oe       aye                            ease a            LSet       }               Pel              o          gS§55            =
  ph         ase A        ee                                        eee             RU     pete   tnd a             etd Gh              ey                           eeee            8
  ADA             eae    te ote                    Bo              ot                   BO gM                                           Bett              0           esse            (3
   fst eRe       so         NS                      3          TRUSEe      .           Pe uN iy sae artes eke    ;     isl              lag ee                       geey             a
    ice Vebohs ea    5       me      “                      ait                  ies oti § BT She  Cer aatee oem ee   Ad ate'y          2 te iad          °          sese             8
       SE Oe seta           Tak           Ute       :          :    :                  FP  ete  RR       aa   FES ek ite                 NS boee            ]        3 ASS           2
  oper ae                  <    sd       ars                                      Prag   a nthe < Bes   3   re       yl ified d            2 Sg                      a1 no e 5       2
 PA     ota      aay   San                ae                  :       Bigee   genes ig   ci  rs   A           eee        My              pear            :            52 BS           E
     ‘    a                     Het                 Far agarose        a          Seat       a  hee ae           Eye                       ERS            ©           sia            g
 pone     oe i        pirate   ce :   2 :        E     Ree       wot              D iSioee eee hans te ai sae foe) dae. ae.             le a Er                      sig z           2
    se   ch  Bene          :            \    i      =       capa              iv oe Net    Sareea        =     aon            “yh       rare de           £           gs oS          Py
  pa       eet a           ae             :         ;      oe          $5      BEE NS    Giger Taab e e ey ete Ae            ,    |     feR a=           (=             SEE          a
  ie    bs                    4            5                         ree         Eni      GaN Bea         Ge The ete                      aoe g                       S855
  pilasters             Sesto                   ete      aie            a   Tag        bee casi REE     NAN Ee eA |            ,            Nas           =           SEoS
   Pais  Lise    f        y        4        y      Bees              7      ,            mae  ete       Rade   ee ha          .      Ble)     f          a           SsSg>
      pee                    :                ee         ares         :         }    SSS eG ete ee     gr      Ae Kod                        °      <3                eae            E
  shea eke       ee                f       3                           K   :    iB     eh    meee eres rie Ree    yy                   :     it     @     w           O2G 8          =
    Rs                                ,                   i              SUERTE Re    taylan              esa           ety            P     aed |        c           ess            a
     Wasty fee                        be            5        +    ety      7    A      wa     eee UIE 4 rae ote,           ch          t     an     -                   oo           ®
 PepR eae tseee              ;                        &                            SES  DES       Ria    Oe Ot a          ree,        aes                —           Seas            =
   eh    Ue                 d        ce        ,                                       a                Lae tees |        eat         at       AS                         ae         ic
 ee Pea                    ,          ,       ;                                   apesttay Where    se wy (nae el         ine 6      Be  era sh
   fates C1 Wear Bese      ea  eipes ea    aera,                                            Sorcerer    ee               ee    ety     ple A
 Bescny wee              hide aoe ah        FFs         ‘i        Seer:    ;                fea ofa ee 2    pos   o.      ae                 pe el
 j    pie   ej                   -          -                                             SF ae    eed     ar,         .              D    th
 Se    Ete                                                                           Pe   hee 77                          ;             art                               i
 Berea,            :       ;         re             wenn                             :    Bone Tere     eee               au            ae
 a         5     eget   vor                                                  ;     :      ce    posers FAN   Tea           ‘e         Bie *y                              ”
  ihe            eee             ae                SAU     eceeger                areas     fea ae    eS a3          :            ease i                                 o
 cass       tah o    E           F       3                                    5        teed aero      ae   ap                 F      peed IP Area!                        9°
  cai ga   sha ane          aed             :     see                  “      “fe      Ep oP      Sie      ;      p                  jaz} fo,                       w
  ero Be        bios             is          Pech                                      hy  Saye            se         me              RA ee |                       oO    °
  Meo ee                   ea    ae                                                      Sea tekst                                   Pape                           5
   s   7      ik:       oe    ;           aR,                                        “ait  Bre,    a    of       ’                    Pst    areg                    oc
    PTT  eather eee oe oe   a iuae  c                 4                                      ees                                   Be        1                      o    2
  r id 3  to Ge  pe                                  :       “             z           : Bs   a                kA   am             a BGI        ;                   os
    h       at              ;       a!             a                                 .      noha              /                    fe   2      ae              w          oO
  Fs  Ih   .     é   ;             ?              U      rai            :             ~     are                                 1 AR ope te    oe              Me   te
 Fe Bt        Ps ubpes strane eat ney              Pie ec                                   ie a                                  re at ee    a                oO
    DY ok th ec tee      e        ‘                eect tse                                  ns              ie                OR topes V.-eopond S                  ®o  wo
     qe   pat ieee                               ;           ay                               BOS            apts                  bpp   eis                  o>
   ite      Fe                   =                                                               Cty epee    -      aan             cst  5     te              =          w
 Ln eeemarsheinreik Fa                                                       aa                    ns    %,     Fae!             Pees! /'¢ “agent              3    =.
  ahaa Reyna ee     é          er                                  oe                             a geen oats    Ae          o   Ne. RE    Gran                      Ww   w
   ;         y              Se                                    Rete                              Mo aia  tee                    ae ee     Ore                oO        Oo
   Mee Dace,                                               See en                                        rd                                  era               Oi   By.   oe
    hed            ee     oe                 Pe   ne       ‘  ie Bias                            5                         a4 Pers :                                a    O
 sees Ee                 emery                    eae Rae                                          .                 Me pak         Beleemtcto                a     fi   ith
  fig      ea       Ss                            Ue aA      PaO RES                                              Dr iatr fy                                        oO
  <Sp                2s.                     Se iS SF         aaa eae A                                   Z    7 Doe “   a                                     b    US
  —                                    ne              ier       keep HS Tira                                     Peg     Sy                             fy     Oo  $     Qa
       :                    nn          =        tan        ae Pe       an   aes                      Peete et 2     peel                                   >            <x
  a                           :                  ea aerdeed =    Yang SEE GC he                            i ee LD so                                         aa)   AS
                            SR     ay    StS        EEN      by ae Ree a        par or               ta aa    See: ts                                    Qa    oo   E     o
     a                    RRR               NBR          eae   Tb rncere                             rie       tite                                      <     se   2G
  ail Series            a          we.        ee   el  ans  Fd be ad, Pe enteral                       hi ee ors4                                              G          oy
        Fi            ;                          OY  Sais abcess leet                                Spat Os                                              25        as
        fas                                         PS rian Sere ele a i Pedy initia Ld ea    Ph        fee Rie   te                                      o    5         se
        bs                                       Pe alert            PET ih ee! eg pee oe    eda eke   Poe    dL   ea                                    ©     2    Be
  Seneca Hse                                    OLearyiy Dee its aE! Naas  Cero     chu p tea    hi   Sar? pare os p iy                                   wa  BB         pass
      in Gat                          -       BOA aa IE oy 1sd       prac) gp ae,                   BB)     iP
  eed ee             :                             pes? ane       Wee rag apleitie Leni      CL   ie sh soa Noe gl mt                                    ~      9   9     §
     Searels                                       EA Tae earn               SEN          Te  spe awe         prt ee                                ao         2:2        #
                                                   Pests      are   Lis § Linas ee Seg bh ioe Pe eae ce pat a  ay                                             a     ss
                                                 ether aoe    Pa CIPS ins      hea =     I yar         mee i    Be                                  z
                                                            ESOP      Le HE OPER eis aNd oes                                                        uw
                                                                                           ae                                                       3m        oO
                                                   eat       ba rrrrne Meas caer     PR     DLT    pe  oe   AS
                                                                            i abt       nis    eRe fr)          ’                                   oll

Section 5

                                                                                                                                                                  3



                                                                   Table 1-1       Instrument Details

      Instrument                                                            Measurement                            Deployment Location & Date
      Teledyne RDI WorkHorse Sentinel Acoustic Doppler Current              • Current       magnitude      and     Noosa Main Beach, approximately 8 m water
      Profiler (ADCP)                                                          direction (0.5 m bins)              depth (refer Figure 1-1):
      Sea Spider Frame                                                                                             • Deployment: 10 March 2019
                                                                            • Wave parameters           (height,
                                                                              period, direction)                   • Retrieval (indicative): 29 April 2019

                                                                            • Water level




      In-Situ TROLL 500 Pressure Transducer                                 • Water level                          Lower Noosa River, 6 locations (refer Figure
                                                                                                                   1-1)



      In-Situ Rugged Baro TROLL                                             • Atmospheric pressure (used           Lower Noosa River, 2 locations (refer Figure
                                                                              to correct the water level           1-1):
                                                                               measurement)                        • Deployment: 13 March 2019

                                                                                                                   • Retrieval (indicative): 29 April 2019

      Boat-mounted RDI WorkHorse Sentinel Acoustic Doppler                  • Quasi-instantaneous                  Lower Noosa River, various locations (refer
      Current Profiler (ADCP)                                                 sectional flow (transect)            Figure 1-1):
                                                                                                                   • Neap tide transects: 14 March 2019
                                                                            • Quasi-instantaneous
                                                                              sectional current magnitude          • Spring tide transects: 20 & 21 March 2019
                                                                              and current direction (0.25 m
                                                                               bins)




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx

Section 6

                                                                                                        4



2        Boat-mounted ADCP Transect Summary
Acoustic Doppler Current Profilers (ADCPs) measure 3D velocities in a vertical profile of discrete bins at
an instant in time (called an ensemble). A boat-mounted ADCP is used to measure velocity profiles while
the boat traverses a section or transect. Total flow through the transect is calculated by integrating the
ADCP velocity profile data vertically from the bottom-most to the top-most bin and horizontally/temporally
across each transect using the Teledyne RD Instrument WinRiver II software.

A total of 288 unique transects were completed during neap tide and spring tide periods in the lower Noosa
River. The transect locations are shown in Figure 2-1 and include:

• Neap tide cross-sectional transects at Dog Beach, Noosa Sound, Munna Point and Noosaville on 14
    March 2019

• Spring tide cross-sectional transects at Dog Beach, Noosa Sound, Munna Point and Noosaville on 20
  March 2019

• Spring tide long-sectional transects at Dog Beach on 21 March 2019




                                      Figure 2-1    ADCP Transect Locations




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx

Section 7

                                                                                                             5


Example processing of a flood tide and ebb tide cross-sectional transect at Noosaville is shown in Figure
2-2 and Figure 2-3.

The right panel of the WinRiver II interface provides a summary of the measurement including:

• Total Q (flow, m3/s) which is the sum of the ‘Measured Q’, ‘Top Q’ and Bottom Q. The ‘Top Q’ and
   ‘Bottom Q’ are estimates of the flow components not directly measured by the ADCP due to instrument
   blind spots at the top and bottom of the water column. Similarly, the WinRiver II software estimates the
   ‘Left Q’ and ‘Right Q’ which correspond to the flow components at the left and right riverbanks that
   cannot be directly measured with the boat-mounted instrument.

• The width (m) of the transect and the cross-sectional area (m2) and estimates of the cross-sectional flow
  speed (m/s)

The ‘Stick Ship Track’ illustrates the transect and the magnitude and direction of the flow. The ‘sticks’
pointing upstream in Figure 2-2 indicate flood tide conditions. The ‘sticks’ pointing downstream in Figure
2-3 indicate ebb tide conditions.

The cross-sectional plot at the bottom of the WinRiver II interface shows the vertical bins at an instant in
time (the instantaneous ensemble) as the boat-mounted instrument is towed across from the right to left
riverbank (or vice versa). Together, the combined bins provide a quasi-instantaneous snapshot of the cross-
sectional flow velocity. This data is the basis for calculating the ‘Measured Q’.

Timeseries plots of the quasi-instantaneous ‘Measured Q’ at Dog Beach, Noosa Sound, Munna Point and
Noosaville are provided in Figure 2-4 and Figure 2-5. For reference, the indicative water level at Munna
Point is also shown on the plots (based on Maritime Safety Queensland predations and published tidal
planes). In tidal estuaries and at a given location, the peak flood or ebb flow rates will coincide with the
transition from high to low water (or vice versa). The flow rate will be close to zero at times of peak high or
low water level (commonly referred to as ‘slack water’).

The cross-sectional ‘Measured Q’ and ‘Total Q’ collected with the boat-mounted ADCP will provide
important data for calibrating the hydrodynamic model developed for the SEMP. The data will be used to
validate the volume of water in the estuary between high and low tide.

The measured cross- and long-sectional flow velocity and direction will also be used for model
calibration/validation purposes. The long-sections will also provide important information on the peak spring
tide currents at Dog Beach.




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx

Section 8

                                                                                                                                 6




                              Figure 2-2    Example Flood Tide ADCP Transect Measurement at the Upstream (Noosaville) Location




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx

Section 9

                                                                                                                                7




                               Figure 2-3    Example Ebb Tide ADCP Transect Measurement at the Upstream (Noosaville) Location




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx

Section 10

                                                                                                                      8




                                               Figure 2-4    Measured Q at Dog Beach (top) and Noosa Sound (bottom)




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx

Section 11

                                                                                                                       9




                                              Figure 2-5     Measured Q at Munna Point (top) and Noosaville (bottom)




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx

Section 12

                                                                      BMT Eastern Australia Pty Ltd
                                                                      Level 8, 200 Creek Street
                                                                      Brisbane Qld 4000
                                                                      Australia
                                                                      PO Box 203, Spring Hill 4004

                                                                      Tel: +61 7 3831 6744
                                                                      Fax: + 61 7 3832 3627

                                                                      ABN 54 010 830 421

                                                                      www.bmt.org

Technical Memorandum
                                                                   Noosa Shire Council
    From:      Matthew Barnes                              To:     Daniel Wishaw
    Date:      31 May 2019                                 CC:
    Subject:   Noosa Spit SEMP - Lower Noosa River Metocean Data Collection




1           Instrument Retrieval Summary
To inform the Noosa Spit SEMP, metocean data collection has been completed. Fixed deployment
instruments were retrieved between 28-30 April 2019. This memorandum follows the previous
correspondence (M.B23636.002.MetoceanDeployment, 29 March 2019) and includes a summary of the
following datasets:

• Tide recorder (pressure transducer) continuous measurements of water level for approximately six
  weeks at six locations in the lower Noosa River. This data will be used to calibrate the hydrodynamic
    model and may also provide some valuable information to partially address concerns regarding the
    published tidal planes.

• Fixed deployment Acoustic Doppler Current Profiler (ADCP) continuous measurements of water level,
  current speed, current direction and wave parameters (height, period and direction) offshore from Noosa
    Main Beach. This data will be used to calibrate both the hydrodynamic and wave models.

Figure 1-1 provides a map showing the instrument deployment locations.




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 13

Fas          :       Ear          eB   Rie   ae   ae sar hams arte yt ante eau ota   eons     ppl Senne      nak Sry etnie Bereta Sole ttn hen sata             AST      Res                     ak \V                                                                                                       —              7
   ;                    &             Oe   LN  tomate    RRS gt      tyes a    yaa gee tas      Asesinas                 cae se ae ees NEA                 eed   Ue   hete   aA                  q
    Seon                  SARI                      RE   PUGET            amnnea eae ey             epee cl pay edocs          AMR                Cea as     Mle        eater                          oak
ae tema ea £             @     Tide Recorder 6 satire                      ton: gsr ainea:            ra:             Dahon ta          Rati) Var patie nary fc a ye ancy Bt         :             2
  Fret  nen ae |                3            ea                     Beas pa        eet wet ye      Ae Es    Ea;   (SAE       OOP       CARE INE Reid GON    lain GeO                   i           a     +
     Beet                    :         a og Rian)             PREC        Fea  tts       Chore       Ponti      REG GL         SAAN   Eee Oat Gee Wels a eats       Caen:                            SS                                                                                                                               <          ;
 4              |                        SNe      a ee        AY ha hay: Seah ag Ce em sf             ec          2      Shed SOE     aun Mn Ma            eee       ica        5           :           Hee
 ‘              |              PH aR YA Aa               rR ect ke                           i               AS    ot     Pe elves ay  Spats tctcd Rien ie Sea                             é                   A                                                                                                 4                             ‘
                                     Z     ¢           .    c   :                    or               \    apm ee            ESaecae}    ig lg PEE Oe   MEN eee                                            wh   A                                                                                                                                ie
                 |               ie          Pe nadidic eet    eae                         Bee       US aap ey te   mene epee        ose gttt yh       Getta tcl                             c           Seca    \\ 3
                             Famer           han ety Wines                  eS   rasa           *              5	1	1	1	11	9	1404	334	166	32	0	Henan
5	1	1	1	11	10	1619	334	1	3	2	Usha
5	1	1	1	11	11	1654	337	39	14	2	aie
5	1	1	1	11	12	1732	335	40	15	7	aa
5	1	1	1	11	13	1781	333	65	16	6	ene
5	1	1	1	11	14	2080	333	36	12	39	aoe,
5	1	1	1	11	15	2146	327	21	28	9	\ * \
  aut                       ys                  a                 Bac       :         7                         :        ate          cae      Peta              pees         gue aa    ge                4          \ Sed                                                                                       j       -
                                                eases      &             SOE                                                            pee   ee                  Neat                                                y         ;                                                                                a                           y
                   TF  ra           Nes           i    FA      %   f            ¥     HNL                   ey:         sch        ath    4         been.     5               s                                                                         |                                                                                 Yee
                     on                =F               eee          t            ia          ees                      Sneath           Ver abe                   een           :          A                           \                                j                                                                                  w
                     a                    >,  i   }        ‘   ope   J             .    ch                        aby      Fae                     a   Cs   ia   an         ee   oi                         4            .     »
                 oF psd                         Sse         weet      :            ts             ey                  ras                 epoch              RS      eee  eee                                              ox
                 Mh             :                     ‘      yA           ;      ‘        ae   ates               Presa    ik                   ;                      Bane:                                               i s
                     py     te                               :      ‘       p     5                           i                           i                   4         ee            foyat                                    aN            4	1	1	1	20	0	314	627	2876	40	-1	
5	1	1	1	20	1	314	640	14	26	26	dr
5	1	1	1	20	2	344	644	91	23	28	we
5	1	1	1	20	3	767	626	35	45	16	eh
5	1	1	1	20	4	989	640	17	7	35	hey
5	1	1	1	20	5	1130	646	71	15	21	Paty
5	1	1	1	20	6	1442	646	29	10	18	ay
5	1	1	1	20	7	2059	655	8	4	0	:
5	1	1	1	20	8	2318	648	3	4	12	,
5	1	1	1	20	9	2483	651	7	5	0	:
5	1	1	1	20	10	2931	627	143	28	82	Offshore
5	1	1	1	20	11	3084	627	106	28	96	ADCP
4	1	1	1	21	0	308	656	2116	32	-1	
5	1	1	1	21	1	308	675	2	5	54	q
5	1	1	1	21	2	469	656	30	27	26	id
5	1	1	1	21	3	746	669	2	4	0	s
5	1	1	1	21	4	938	673	2	5	0	r
5	1	1	1	21	5	991	664	18	4	22	ei
5	1	1	1	21	6	1101	663	9	23	72	4
                                                                                                                               7                   r:          4                                .                                 : | a        a
 ry       EY    A er taeee     tere             i                    %              ees                             :                                           ;      :              *       ;                                     Mw
 CR a            SORE       oan                    a                 rae                          i   era        Oe he     COLAC                             Spend   as          AN                 ;                                              b
 Sd oi          eee        Ed eae                 Peete,               Sees                           en        :                        i                                    ]          ake    a                                 ,            ,   >
Ub RATE RUT ILE        REI ate                   te                     ‘           pikes                           =                                                   ren     RAN   PISS 2                           3        +                    ’
   i    wine    ex P25 Bead                         we                   .                         Spates            eat                    4             ;    4           7         ae     ‘ ee                      be                                    M
5	1	1	1	27	2	200	845	13	15	43	ae
5	1	1	1	27	3	236	823	46	34	23	Pelee:
5	1	1	1	27	4	292	836	15	23	34	Fi
5	1	1	1	27	5	386	852	2	2	22	ee
5	1	1	1	27	6	482	840	4	2	25	a
5	1	1	1	27	7	521	827	23	21	17	aS
5	1	1	1	27	8	661	844	2	2	0 . Z reer ity q in fees     ee,
 gs  Ws Bre See a) “ys (eee                ’      i       .                                       ‘            et            papa         :          :                                  Ssh, oe                                                        —          .
WR ae Peers                 sen aoe                                       :                                       WaT                eae            URES                         ieee ates                        *                                     fa. Sa
 Pe ae            (Meee   § tle™ od ig      SORE                                          ,       !               i)                                a             ‘              oh sk    met ltes                ,                                   Bea,                .                                                      —                 a
  eS, eee             one Ei     cee ee                   :                              é         Sty             eran          mae eye               .              eepanne                  :                     4                              ;                                                                                            7g
    ee eee Cr eer        ED TE AES hog                                   eet            2        ‘      i    cote     5    oe        es                  by       4      SRI                                                                               au                                                                                   gee
 RG             er trey has) oo                        {                 E                           Rl     More       Pa  nee                              ms          pce   ah                                     ‘                               ‘@    Tide Recorder 1                                                                          sy)
 wn    ae      ere Se      bel         a                                                                      A                                                               4                                                                       by
ip stes      (iene       9       a                                                                   ‘        :         aN                ;                i             Gan                    4                                                          F                                                                                   he Sees
Baer a tags ee                                   s                     ete                           i            elt     be                                      ea     ok           Here                     1                                  é       Vig                                                                          er SS
 sent ye eh ne       pa        =                                       AN                            Espa                Saher                               ate        re          Pant                                                                                              5                                              tea Palas eS
ke    OS TE bcs Le ey                                                     ,                        URE    moe Swat                    ‘                       Ta       ass     eet Bs          es                                                                3           .        ae                                          Beth we         ae
oie    ee           Dah                                                     rine                ce hal         Penske  tg       Seni?   ‘                          Rese              As       mice}             '                                                                             ae                                 7 > teas         eee
ep  RAR S LAT tai       ee Sells                                    i      i           i          «             Sa             RTI                      NET       COPE      TC Ai ae    me       es              2,                                       ,                        1         Ye re                                  eran         tase
Rpt                eae                                   j       7%                eer:        ee ak            tS he nea   ea                 say             cain     he eee            a        oy                                                                                       pt  eR le                        Age  €e Ye             oad
ben   ete ead                                            ar           ee                       tee     ate     rae         A aoa SR      at          Se er           Ma ale San            SAL     Mi”,                                                                        Ee        eget  |  eo sca           bite            sae       es      es
Ren    aire Rl,                                             BTS aac           .          oes            hrc aaa,  Gen’    Rey eed sie Sede se NE          Mew  ee              Mae Eats     Pt                                      peat                                                   este) tne     ia     eae Bae ee                           i
  inthe amy Se                                             SP           EE                      KE   aed pe RAVENS   HES     Woh aia ten EL ok. <8 Mel yleedre nls TAMER  DRO Gg aNe    Yeon  pet BS                                     rn   3              é          a                       Pit;                             Ty Se     ak          ;
  epee ty                                                EF  Meo      Miers      COUR Tae             Ss SG  Non      ESRD          APNG     SOR    ty one,     ee WEEDS RNAS             WOU OP ER                                   OO            an,            oe                      Pius@,   lide Recorder                  2iasiis:
  pM  area    ee,                                          Mean  Fras   LY   dl    ae   CN rar Nae    Wee 2d Bie EMM         NU en      a           SH    hivsstute st earmege A a Raa  ara. ee,                                 4      4         t          ys            5             Re                 A      JORG EY sfc Beha ode             ae
 re ae                                               rR BEI      nd  MNS     Sh Ti         kgs    eee    ea   BN pr ys Diced een   ee  tye       paces          ee   8 BRE ON A                  ee                                 :      :            me                           RCT                OLS A A                       a yen
 faces ih                                 i         Cy ea            Ta  ee     RRL      Oey Ce      Ona re            ROE Te Gn et       ay SHULER ML            LO       Mae Ea ee ak                                                  f                   .                  wots 5s           ge       VET          ad          ieee               )
  Satie oho                                           aoe               cee     8  ae  TEA TLY lan Bh AC op col           We si he We ad      oe  Lap        eS a ee       ma gu  aS ey  oo Ser    5	1	1	1	49	31	2411	1312	4	5	0	o
5	1	1	1	49	32	2497	1306	35	14	0	Se
5	1	1	1	49	33	2716	1304	18	12	19	>
5	1	1	1	49	34	2780	1303	41	17	33	OD
5	1	1	1	49	35	2834	1301	22	7	4	a
5	1	1	1	49	36	2873	1302	49	19	10	She
5	1	1	1	49	37	3001	1304	5	11	42	i
5	1	1	1	49	38	3062	1297	7	27	17	if
5	1	1	1	49	39	3131	1306	19	12	30	Dod
5	1	1	1	49	40	3221	1301	37	18	34	ee
5	1	1	1	49	41	3281	1305	2	2	5	Sey
5	1	1	1	49	42	3340	1300	20	7	33	i
4	1	1	1	50	0	156	1304	3252	52	-1	
5	1	1	1	50	1	156	1322	57	25	11	ete
5	1	1	1	50	2	223	1322	12	30	0	ee
5	1	1	1	50	3	245	1326	20	23	10	tg
5	1	1	1	50	4	286	1318	29	38	19	tod
5	1	1	1	50	5	531	1329	2	2	5	i
5	1	1	1	50	6	607	1325	9	22	0	‘
5	1	1	1	50	7	626	1312	36	31	41	a
5	1	1	1	50	8	785	1324	70	19	0	eect
5	1	1	1	50	9	901	1324	11	15	0	ret)
5	1	1	1	50	10	954	1321	20	18	7	Seria
5	1	1	1	50	11	999	1324	21	11	34	s,s
5	1	1	1	50	12	1073	1345	3	1	22	Gi
5	1	1	1	50	13	1102	1319	50	26	17	ghee
5	1	1	1	50	14	1163	1323	59	16	19	Palas
5	1	1	1	50	15	1244	1321	22	18	28	hel
5	1	1	1	50	16	1329	1331	16	12	15	Mee
5	1	1	1	50	17	1415	1322	5	9	20	alr
5	1	1	1	50	18	1427	1313	14	35	11	wr
5	1	1	1	50	19	1450	1333	11	11	34	et
5	1	1	1	50	20	1467	1313	28	35	34	FU
5	1	1	1	50	21	1557	1320	9	6	26	el
5	1	1	1	50	22	1577	1323	19	19	11	I
5	1	1	1	50	23	1608	1329	7	7	14	Cade
5	1	1	1	50	24	1673	1328	6	2	32	tat
5	1	1	1	50	25	1715	1321	7	8	28	SAD
5	1	1	1	50	26	1784	1326	1	3	39	ATR
5	1	1	1	50	27	1823	1319	17	23	14	A
5	1	1	1	50	28	1846	1319	52	25	16	teas
5	1	1	1	50	29	1993	1316	11	28	25	x
5	1	1	1	50	30	2669	1309	53	37	16	Raat
5	1	1	1	50	31	2743	1305	72	45	0	meats
5	1	1	1	50	32	2840	1305	11	31	14	PB
5	1	1	1	50	33	2883	1308	18	35	30	a
5	1	1	1	50	34	2909	1304	47	43	24	Rat.
5	1	1	1	50	35	2999	1311	16	30	7	“4
5	1	1	1	50	36	3109	1313	56	23	26	Cte
5	1	1	1	50	37	3156	1304	12	36	73	4
5	1	1	1	50	38	3230	1315	43	28	18	Pa
5	1	1	1	50	39	3313	1336	2	2	7	;
5	1	1	1	50	40	3405	1330	3	1	0	\
4	1	1	1	51	0	169	1330	3177	64	-1	
5	1	1	1	51	1	169	1350	23	39	52	a
5	1	1	1	51	2	199	1353	28	35	5	i
5	1	1	1	51	3	238	1346	8	8	0	)
5	1	1	1	51	4	261	1348	32	32	37	st
5	1	1	1	51	5	331	1351	48	31	28	Peer
5	1	1	1	51	6	378	1334	14	52	45	pe
5	1	1	1	51	7	603	1348	25	33	22	Ro
5	1	1	1	51	8	847	1370	3	5	8	.
5	1	1	1	51	9	881	1348	28	23	29	ay
5	1	1	1	51	10	919	1346	11	30	7	ss
5	1	1	1	51	11	952	1354	59	24	27	eS
5	1	1	1	51	12	1044	1351	3	1	18	‘
5	1	1	1	51	13	1056	1348	18	27	45	va
5	1	1	1	51	14	1091	1354	10	12	41	i
5	1	1	1	51	15	1130	1351	13	29	17	x
5	1	1	1	51	16	1171	1349	20	31	35	a
5	1	1	1	51	17	1224	1354	33	26	37	bat
5	1	1	1	51	18	1273	1353	2	2	38	;
5	1	1	1	51	19	1303	1346	3	29	21	:
5	1	1	1	51	20	1324	1369	2	2	59	:
5	1	1	1	51	21	1339	1345	20	33	48	x
5	1	1	1	51	22	1406	1356	11	20	28	Fr
5	1	1	1	51	23	1445	1347	43	30	32	ie
5	1	1	1	51	24	1498	1360	7	10	23	x
5	1	1	1	51	25	1554	1353	23	30	50	a
5	1	1	1	51	26	1586	1349	27	23	3	pei
5	1	1	1	51	27	1651	1343	51	34	20	ce
5	1	1	1	51	28	1721	1343	11	29	0	u
5	1	1	1	51	29	1747	1345	23	14	12	as
5	1	1	1	51	30	1778	1359	13	19	0	‘
5	1	1	1	51	31	1813	1343	32	35	21	nea
5	1	1	1	51	32	1869	1334	14	40	14	fn
5	1	1	1	51	33	1960	1350	35	25	8	bok)
5	1	1	1	51	34	2402	1354	2	4	0	;
5	1	1	1	51	35	2449	1342	31	12	29	ai
5	1	1	1	51	36	2555	1341	198	44	8	Pale
5	1	1	1	51	37	2841	1343	28	33	16	a
5	1	1	1	51	38	2899	1341	62	38	25	A
5	1	1	1	51	39	3020	1363	16	12	33	5
5	1	1	1	51	40	3048	1347	4	5	0	*
5	1	1	1	51	41	3064	1345	15	28	53	i
5	1	1	1	51	42	3128	1330	12	64	33	fi
5	1	1	1	51	43	3166	1354	32	20	36	ay
5	1	1	1	51	44	3238	1342	5	5	16	a
5	1	1	1	51	45	3269	1343	24	31	18	a
5	1	1	1	51	46	3328	1350	18	17	0	*t
4	1	1	1	52	0	151	1365	2989	54	-1	
5	1	1	1	52	1	151	1369	55	50	28	uate
5	1	1	1	52	2	233	1389	61	19	25	Ree
5	1	1	1	52	3	313	1380	125	35	0	oie)
5	1	1	1	52	4	578	1385	62	29	33	aes
5	1	1	1	52	5	767	1399	29	6	2	oA.
5	1	1	1	52	6	891	1383	46	28	14	NS
5	1	1	1	52	7	961	1384	41	29	1	ef
5	1	1	1	52	8	985	1368	37	49	0	iy
5	1	1	1	52	9	1052	1387	12	20	0	tatipe
5	1	1	1	52	10	1087	1391	47	22	16	ee
5	1	1	1	52	11	1156	1392	9	15	0	gac
5	1	1	1	52	12	1178	1398	8	6	0	ac
5	1	1	1	52	13	1203	1384	39	29	0	heet
5	1	1	1	52	14	1270	1384	13	20	37	rion
5	1	1	1	52	15	1307	1368	13	49	40	Oo
5	1	1	1	52	16	1346	1384	31	26	29	eek
5	1	1	1	52	17	1393	1382	48	30	23	irae
5	1	1	1	52	18	1490	1382	20	18	12	tae
5	1	1	1	52	19	1518	1383	111	29	0	hacen
5	1	1	1	52	20	1617	1368	22	49	0	ae
5	1	1	1	52	21	1652	1386	20	6	0	AL
5	1	1	1	52	22	1739	1384	40	21	29	Tg
5	1	1	1	52	23	1804	1381	44	28	35	my
5	1	1	1	52	24	1936	1387	3	1	33	Sa
5	1	1	1	52	25	1988	1373	7	17	24	4
5	1	1	1	52	26	2485	1379	72	30	9	Pre
5	1	1	1	52	27	2618	1372	87	36	31	eta
5	1	1	1	52	28	2709	1367	13	33	8	co
5	1	1	1	52	29	2751	1386	69	21	32	ore
5	1	1	1	52	30	2843	1374	91	34	35	Te
5	1	1	1	52	31	2998	1375	81	31	7	Bay
5	1	1	1	52	32	3128	1365	12	35	41	é
4	1	1	1	53	0	149	1392	3210	46	-1	
5	1	1	1	53	1	149	1407	45	24	49	Dae
5	1	1	1	53	2	205	1414	59	24	16	Liter]
5	1	1	1	53	3	306	1405	41	26	42	Pit
5	1	1	1	53	4	401	1401	9	35	23	ae
5	1	1	1	53	5	635	1413	16	8	25	ot
5	1	1	1	53	6	874	1414	4	7	63	3
5	1	1	1	53	7	946	1412	23	15	7	2
5	1	1	1	53	8	1001	1424	2	3	0	ideseL
5	1	1	1	53	9	1014	1399	30	35	18	DS
5	1	1	1	53	10	1048	1406	37	23	34	aio
5	1	1	1	53	11	1094	1414	13	11	18	a
5	1	1	1	53	12	1131	1399	24	35	30	tae
5	1	1	1	53	13	1190	1413	27	14	8	ia
5	1	1	1	53	14	1442	1418	16	9	31	WE
5	1	1	1	53	15	1514	1417	1	3	25	ie
5	1	1	1	53	16	1539	1415	48	12	16	Bh
5	1	1	1	53	17	1641	1409	33	12	20	Goes
5	1	1	1	53	18	1886	1417	1	3	28	F
5	1	1	1	53	19	2017	1422	2	5	21	,
5	1	1	1	53	20	2449	1402	42	25	5	CE
5	1	1	1	53	21	2506	1403	100	24	11	ge
5	1	1	1	53	22	2634	1396	48	36	22	Lak
5	1	1	1	53	23	2675	1403	66	22	0	lacarl
5	1	1	1	53	24	2733	1396	24	36	0	th
5	1	1	1	53	25	2762	1400	10	12	30	atid
5	1	1	1	53	26	2787	1408	33	20	42	ey
5	1	1	1	53	27	2979	1405	72	18	0	frais
5	1	1	1	53	28	3124	1392	42	28	19	tas
5	1	1	1	53	29	3235	1414	2	2	0	:
5	1	1	1	53	30	3328	1410	31	10	20	a
4	1	1	1	54	0	147	1408	3213	58	-1	
5	1	1	1	54	1	147	1427	112	26	10	trees
5	1	1	1	54	2	365	1424	58	38	34	ete
5	1	1	1	54	3	438	1424	62	34	34	ae
5	1	1	1	54	4	602	1433	22	21	6	at
5	1	1	1	54	5	830	1430	33	19	20	ype
5	1	1	1	54	6	890	1424	15	10	60	of
5	1	1	1	54	7	974	1423	14	37	0	ue
5	1	1	1	54	8	1046	1427	127	28	19	Ee
5	1	1	1	54	9	1184	1431	20	21	24	at
5	1	1	1	54	10	1321	1434	16	17	1	RL
5	1	1	1	54	11	1358	1426	71	23	14	ese
5	1	1	1	54	12	1446	1425	75	23	33	antes
5	1	1	1	54	13	1534	1421	23	39	24	Sra
5	1	1	1	54	14	1571	1426	25	15	22	sage
5	1	1	1	54	15	1614	1437	3	2	8	see)
5	1	1	1	54	16	1661	1437	1	3	43	ek
5	1	1	1	54	17	1697	1432	4	10	3	1
5	1	1	1	54	18	1707	1421	26	39	14	Ate
5	1	1	1	54	19	1868	1428	2	2	19	;
5	1	1	1	54	20	1961	1427	59	21	19	oy
5	1	1	1	54	21	2337	1423	80	39	13	FN
5	1	1	1	54	22	2438	1417	63	31	45	ee
5	1	1	1	54	23	2511	1424	67	31	30	a
5	1	1	1	54	24	2587	1417	35	33	58	ol
5	1	1	1	54	25	2642	1433	22	17	13	Pe
5	1	1	1	54	26	2667	1418	120	30	15	Peas
5	1	1	1	54	27	2759	1414	44	44	31	aa
5	1	1	1	54	28	2934	1418	52	39	24	Laas
5	1	1	1	54	29	2983	1408	83	51	26	red
5	1	1	1	54	30	3110	1423	10	25	0	K
5	1	1	1	54	31	3135	1417	36	49	6	Mi}
5	1	1	1	54	32	3199	1424	38	9	0	SOMRE
5	1	1	1	54	33	3254	1432	5	11	15	ER
5	1	1	1	54	34	3276	1421	58	23	10	San
5	1	1	1	54	35	3317	1417	39	42	16	G23
4	1	1	1	55	0	149	1432	3226	59	-1	
5	1	1	1	55	1	149	1450	45	36	17	HSS
5	1	1	1	55	2	199	1447	112	43	2	Seis
5	1	1	1	55	3	376	1474	10	6	13	pei
5	1	1	1	55	4	682	1456	48	23	13	nh
5	1	1	1	55	5	1007	1454	35	27	28	EE
5	1	1	1	55	6	1052	1452	174	29	8	COO
5	1	1	1	55	7	1240	1450	156	29	29	ee
5	1	1	1	55	8	1503	1450	103	30	15	nea
5	1	1	1	55	9	1667	1453	26	15	29	eke
5	1	1	1	55	10	1739	1467	14	5	0	Cee
5	1	1	1	55	11	1998	1460	14	12	22	0”
5	1	1	1	55	12	2318	1446	122	35	6	Kae
5	1	1	1	55	13	2450	1447	126	30	9	an
5	1	1	1	55	14	2574	1429	25	60	29	gi
5	1	1	1	55	15	2602	1447	140	31	13	ea
5	1	1	1	55	16	2922	1444	168	38	12	PNA
5	1	1	1	55	17	3111	1432	42	44	32	UBS
5	1	1	1	55	18	3230	1450	46	24	9	eee
4	1	1	1	56	0	147	1467	3153	51	-1	
5	1	1	1	56	1	147	1477	48	31	47	a
5	1	1	1	56	2	206	1475	48	32	33	Pits
5	1	1	1	56	3	258	1484	34	23	10	ped
5	1	1	1	56	4	325	1486	11	19	45	ek
5	1	1	1	56	5	357	1471	56	38	13	iat
5	1	1	1	56	6	412	1467	55	51	0	etics
5	1	1	1	56	7	609	1488	8	9	36	SA
5	1	1	1	56	8	727	1495	8	4	36	a
5	1	1	1	56	9	816	1481	33	8	33	ae
5	1	1	1	56	10	1047	1481	27	21	17	Re
5	1	1	1	56	11	1083	1482	72	26	5	eT
5	1	1	1	56	12	1189	1479	16	26	38	ge
5	1	1	1	56	13	1238	1480	46	19	10	Rae
5	1	1	1	56	14	1348	1480	35	22	10	Re
5	1	1	1	56	15	1418	1480	28	27	15	ees
5	1	1	1	56	16	1472	1485	61	16	0	Peano
5	1	1	1	56	17	1570	1489	8	15	0	L
5	1	1	1	56	18	1581	1473	7	39	25	A
5	1	1	1	56	19	1625	1492	2	6	0	acl
5	1	1	1	56	20	1645	1479	18	4	0	aah
5	1	1	1	56	21	1669	1473	7	39	0	E
5	1	1	1	56	22	1688	1473	43	39	0	ier
5	1	1	1	56	23	1824	1482	63	21	31	Py.
5	1	1	1	56	24	1988	1480	7	11	75	/
5	1	1	1	56	25	2104	1489	17	7	7	a
5	1	1	1	56	26	2301	1467	110	35	16	fee
5	1	1	1	56	27	2449	1475	23	30	7	Sh
5	1	1	1	56	28	2475	1474	75	31	14	eae
5	1	1	1	56	29	2562	1474	100	28	41	Mg
5	1	1	1	56	30	2842	1468	29	44	13	AST
5	1	1	1	56	31	2870	1472	192	36	14	Maaco
5	1	1	1	56	32	2981	1468	41	44	20	10)
5	1	1	1	56	33	3084	1486	3	3	15	SP
5	1	1	1	56	34	3146	1474	22	28	11	BS
5	1	1	1	56	35	3266	1476	4	4	22	Be
5	1	1	1	56	36	3341	1475	55	24	16	Se:
4	1	1	1	57	0	161	1490	3205	46	-1	
5	1	1	1	57	1	161	1506	10	6	39	GES
5	1	1	1	57	2	190	1504	69	22	14	oy
5	1	1	1	57	3	243	1500	21	40	50	a
5	1	1	1	57	4	294	1506	54	19	11	BSS
5	1	1	1	57	5	373	1495	56	33	27	FST
5	1	1	1	57	6	481	1519	5	7	0	:
5	1	1	1	57	7	616	1508	52	16	17	be
5	1	1	1	57	8	706	1516	3	3	19	Nae
5	1	1	1	57	9	791	1513	4	1	28	i
5	1	1	1	57	10	872	1519	2	2	26	2
5	1	1	1	57	11	1107	1501	69	26	17	ISS
5	1	1	1	57	12	1189	1506	47	20	3	AEA
5	1	1	1	57	13	1272	1504	63	16	0	eau
5	1	1	1	57	14	1398	1497	28	41	21	aN
5	1	1	1	57	15	1425	1503	48	26	20	eos
5	1	1	1	57	16	1489	1502	49	24	19	aly
5	1	1	1	57	17	1542	1497	21	41	22	Se
5	1	1	1	57	18	1567	1505	65	19	0	BS
5	1	1	1	57	19	1697	1507	3	4	0	:
5	1	1	1	57	20	1865	1517	1	3	0	'
5	1	1	1	57	21	1949	1507	10	10	33	a
5	1	1	1	57	22	2184	1498	22	31	1	ee
5	1	1	1	57	23	2329	1498	36	26	18	i?
5	1	1	1	57	24	2394	1493	62	30	6	rere
5	1	1	1	57	25	2488	1496	24	31	2	eh
5	1	1	1	57	26	2537	1491	52	45	21	fon)
5	1	1	1	57	27	2617	1506	2	2	0	Y
5	1	1	1	57	28	2743	1490	168	33	28	eect
5	1	1	1	57	29	2964	1492	80	35	0	EET
5	1	1	1	57	30	3050	1498	27	19	0	e
5	1	1	1	57	31	3092	1498	8	17	35	3a
5	1	1	1	57	32	3146	1498	53	32	37	Coe
5	1	1	1	57	33	3311	1498	43	16	10	mts
4	1	1	1	58	0	188	1513	3219	53	-1	
5	1	1	1	58	1	188	1523	49	22	13	GLa
5	1	1	1	58	2	294	1508	70	60	27	Rare
5	1	1	1	58	3	384	1527	101	22	12	acne
5	1	1	1	58	4	619	1524	30	37	2	Ce
5	1	1	1	58	5	1026	1524	7	6	27	2
5	1	1	1	58	6	1162	1522	150	25	5	eee
5	1	1	1	58	7	1425	1522	206	26	10	BERS
5	1	1	1	58	8	1601	1500	40	60	15	a
5	1	1	1	58	9	1647	1531	36	13	39	Me
5	1	1	1	58	10	1701	1500	60	60	18	a
5	1	1	1	58	11	2326	1515	201	20	25	SEEN
5	1	1	1	58	12	2549	1519	37	22	27	5
5	1	1	1	58	13	2707	1513	57	28	33	I
5	1	1	1	58	14	2777	1518	34	19	24	to
5	1	1	1	58	15	2815	1519	86	32	0	Lak
5	1	1	1	58	16	2994	1519	45	30	18	eh
5	1	1	1	58	17	3045	1514	57	38	0	EEE
5	1	1	1	58	18	3384	1520	23	17	18	I
4	1	1	1	59	0	210	1537	3195	24	-1	
5	1	1	1	59	1	210	1552	2	2	0	%
5	1	1	1	59	2	259	1554	22	5	1	Laie
5	1	1	1	59	3	304	1547	36	11	29	Pi
5	1	1	1	59	4	414	1547	1	5	36	r
5	1	1	1	59	5	516	1546	27	13	21	ie
5	1	1	1	59	6	645	1537	8	24	33	yy
5	1	1	1	59	7	754	1554	2	2	27	7
5	1	1	1	59	8	948	1556	3	2	30	.
5	1	1	1	59	9	1182	1545	20	4	15	So
5	1	1	1	59	10	1226	1545	16	14	12	She
5	1	1	1	59	11	1245	1536	10	27	34	a
5	1	1	1	59	12	1265	1545	41	13	13	tener:
5	1	1	1	59	13	1476	1536	14	26	20	ee
5	1	1	1	59	14	1492	1545	29	8	33	oe
5	1	1	1	59	15	1535	1543	64	15	45	wy
5	1	1	1	59	16	1636	1544	42	11	9	Iie
5	1	1	1	59	17	1757	1552	3	5	0	¥
5	1	1	1	59	18	1807	1542	32	14	28	eye
5	1	1	1	59	19	2281	1544	4	4	50	=
5	1	1	1	59	20	2534	1539	2	16	47	i
5	1	1	1	59	21	2573	1541	2	3	0	*
5	1	1	1	59	22	2720	1539	69	12	9	<a
5	1	1	1	59	23	2867	1540	25	12	15	AL
5	1	1	1	59	24	2910	1541	12	9	30	oe
5	1	1	1	59	25	2927	1533	19	26	27	a
5	1	1	1	59	26	2969	1537	14	16	31	Ge
5	1	1	1	59	27	2987	1541	2	12	20	ie
5	1	1	1	59	28	3001	1538	48	13	14	te
5	1	1	1	59	29	3071	1541	10	14	8	on
5	1	1	1	59	30	3103	1538	20	12	23	ae
5	1	1	1	59	31	3374	1538	13	10	37	ae
4	1	1	1	60	0	302	1537	2913	59	-1	
5	1	1	1	60	1	302	1561	53	9	0	pete
5	1	1	1	60	2	412	1551	77	45	25	CS
5	1	1	1	60	3	509	1560	29	26	8	ot
5	1	1	1	60	4	652	1554	16	17	10	Soy
5	1	1	1	60	5	740	1558	109	17	15	Rupee
5	1	1	1	60	6	902	1538	38	50	2	ty
5	1	1	1	60	7	1402	1548	37	30	23	ad
5	1	1	1	60	8	1460	1551	232	41	34	ees
5	1	1	1	60	9	1795	1567	12	6	29	Be
5	1	1	1	60	10	2163	1560	30	14	32	Pe
5	1	1	1	60	11	2280	1544	49	28	79	lide
5	1	1	1	60	12	2342	1544	183	28	96	Recorder
5	1	1	1	60	13	2490	1535	35	51	89	3
5	1	1	1	60	14	2732	1537	69	55	27	eee
5	1	1	1	60	15	2819	1544	166	33	1	BUCA
5	1	1	1	60	16	3000	1537	114	43	6	Ee
5	1	1	1	60	17	3123	1555	25	31	10	Ra
4	1	1	1	61	0	442	1572	2741	30	-1	
5	1	1	1	61	1	442	1591	5	3	35	Me
5	1	1	1	61	2	493	1581	3	14	23	2
5	1	1	1	61	3	503	1582	19	14	39	2
5	1	1	1	61	4	845	1589	1	3	0	P
5	1	1	1	61	5	1003	1585	17	9	28	a
5	1	1	1	61	6	1147	1572	7	30	0	Ke
5	1	1	1	61	7	1300	1572	16	30	27	Na
5	1	1	1	61	8	1393	1582	3	3	13	ik
5	1	1	1	61	9	1479	1584	2	2	37	ey
5	1	1	1	61	10	1534	1578	40	14	11	eu
5	1	1	1	61	11	1621	1579	31	13	39	EAS
5	1	1	1	61	12	1683	1579	6	12	17	ug
5	1	1	1	61	13	1755	1579	12	13	21	ss
5	1	1	1	61	14	2187	1580	61	13	29	a
5	1	1	1	61	15	2411	1583	18	6	8	nx
5	1	1	1	61	16	2530	1576	42	16	22	rs;
5	1	1	1	61	17	2662	1575	50	17	44	okey
5	1	1	1	61	18	2845	1576	97	16	0	Aerial
5	1	1	1	61	19	2970	1569	32	31	32	ede
5	1	1	1	61	20	3016	1569	43	31	12	Dery
5	1	1	1	61	21	3058	1569	15	31	0	ne
5	1	1	1	61	22	3089	1569	34	31	29	adr
5	1	1	1	61	23	3121	1575	35	18	37	ak
5	1	1	1	61	24	3179	1582	4	3	21	et
4	1	1	1	62	0	443	1570	2758	51	-1	
5	1	1	1	62	1	443	1586	37	29	17	Sr
5	1	1	1	62	2	526	1598	29	22	0	Pm
5	1	1	1	62	3	1049	1604	17	8	0	BR
5	1	1	1	62	4	1269	1600	42	4	0	eeaeie
5	1	1	1	62	5	1373	1583	35	33	12	es
5	1	1	1	62	6	1420	1584	66	30	18	tL)
5	1	1	1	62	7	1526	1592	84	13	30	hae
5	1	1	1	62	8	1681	1592	44	21	11	cate
5	1	1	1	62	9	2072	1584	190	28	8	Bek
5	1	1	1	62	10	2652	1570	94	40	32	Podge
5	1	1	1	62	11	2837	1570	149	42	17	PH
5	1	1	1	62	12	3009	1583	92	28	37	heed
5	1	1	1	62	13	3122	1583	79	29	14	Pere
4	1	1	1	63	0	477	1601	2916	44	-1	
5	1	1	1	63	1	477	1611	94	30	26	ca
5	1	1	1	63	2	701	1632	4	3	0	:
5	1	1	1	63	3	936	1624	37	10	7	aera
5	1	1	1	63	4	995	1617	13	18	36	ss
5	1	1	1	63	5	1037	1624	5	8	12	sty
5	1	1	1	63	6	1050	1611	48	26	14	ia
5	1	1	1	63	7	1109	1615	52	23	24	cae
5	1	1	1	63	8	1285	1624	28	7	15	Meme
5	1	1	1	63	9	1342	1632	4	2	4	Sie
5	1	1	1	63	10	1373	1612	162	29	7	agg
5	1	1	1	63	11	1466	1606	40	39	31	He
5	1	1	1	63	12	1505	1606	49	39	7	erat
5	1	1	1	63	13	1562	1615	12	4	0	ide
5	1	1	1	63	14	1589	1606	30	39	0	na
5	1	1	1	63	15	2054	1614	50	23	9	BR
5	1	1	1	63	16	2115	1611	43	32	27	Ae
5	1	1	1	63	17	2171	1609	74	25	40	er
5	1	1	1	63	18	2250	1610	100	35	15	eel
5	1	1	1	63	19	2400	1617	6	16	38	a
5	1	1	1	63	20	2653	1601	119	36	22	Rr
5	1	1	1	63	21	2808	1606	149	37	25	DC
5	1	1	1	63	22	2972	1617	16	22	26	ay
5	1	1	1	63	23	3004	1609	11	15	28	ar
5	1	1	1	63	24	3047	1606	50	25	12	eon
5	1	1	1	63	25	3102	1600	31	40	18	ar
5	1	1	1	63	26	3140	1604	40	27	0	dae
5	1	1	1	63	27	3391	1608	2	2	14	;
4	1	1	1	64	0	560	1624	2802	29	-1	
5	1	1	1	64	1	560	1640	10	7	0	3
5	1	1	1	64	2	955	1637	3	1	29	.
5	1	1	1	64	3	1052	1639	47	5	26	Pe
5	1	1	1	64	4	1103	1636	37	3	20	shin
5	1	1	1	64	5	1386	1634	6	3	57	x
5	1	1	1	64	6	1441	1634	3	5	0	«
5	1	1	1	64	7	1489	1636	41	12	40	Th
5	1	1	1	64	8	1606	1642	2	3	34	:
5	1	1	1	64	9	2056	1632	81	15	22	eS
5	1	1	1	64	10	2164	1641	2	3	8	Ae
5	1	1	1	64	11	2180	1639	34	5	11	Pe
5	1	1	1	64	12	2213	1624	16	29	8	ta
5	1	1	1	64	13	2310	1639	6	5	14	eM
5	1	1	1	64	14	2363	1634	37	13	30	eS:
5	1	1	1	64	15	2483	1624	8	29	36	ho
5	1	1	1	64	16	2568	1632	5	7	36	A
5	1	1	1	64	17	2665	1632	21	9	11	as
5	1	1	1	64	18	2693	1639	28	9	8	NP
5	1	1	1	64	19	2719	1624	25	29	0	ORD
5	1	1	1	64	20	2831	1638	38	6	37	ee
5	1	1	1	64	21	2929	1632	36	13	23	eee
5	1	1	1	64	22	2961	1624	22	29	56	ee
5	1	1	1	64	23	2990	1633	10	15	29	a
5	1	1	1	64	24	3009	1624	30	29	0	eb
5	1	1	1	64	25	3038	1630	22	14	0	ory
5	1	1	1	64	26	3107	1628	71	16	10	Siti
5	1	1	1	64	27	3191	1633	17	8	19	es
5	1	1	1	64	28	3232	1639	8	7	17	tt
5	1	1	1	64	29	3360	1630	2	2	0	o
4	1	1	1	65	0	303	1632	2934	55	-1	
5	1	1	1	65	1	303	1649	49	28	96	ide
5	1	1	1	65	2	365	1649	153	28	96	Recorder
5	1	1	1	65	3	529	1649	54	38	44	Se
5	1	1	1	65	4	633	1652	5	3	0	As
5	1	1	1	65	5	861	1653	104	14	21	ee
5	1	1	1	65	6	1048	1644	1	18	12	|
5	1	1	1	65	7	1081	1648	50	25	36	on
5	1	1	1	65	8	1256	1661	2	2	0	F
5	1	1	1	65	9	1417	1651	36	5	27	ge
5	1	1	1	65	10	1476	1643	9	36	38	oa
5	1	1	1	65	11	1561	1665	5	3	0	;
5	1	1	1	65	12	1989	1666	16	4	0	Y
5	1	1	1	65	13	2014	1642	42	28	14	PN
5	1	1	1	65	14	2090	1632	22	42	33	ke
5	1	1	1	65	15	2186	1646	43	21	19	lp
5	1	1	1	65	16	2211	1635	14	38	12	6
5	1	1	1	65	17	2241	1639	105	29	10	RNA
5	1	1	1	65	18	2359	1642	63	27	14	IE
5	1	1	1	65	19	2449	1643	62	21	17	Bbc
5	1	1	1	65	20	2693	1644	34	26	53	Hi
5	1	1	1	65	21	2783	1630	42	41	45	PoP
5	1	1	1	65	22	2868	1639	29	26	32	ARLE
5	1	1	1	65	23	2910	1638	67	29	44	ON
5	1	1	1	65	24	2987	1654	12	10	34	ba
5	1	1	1	65	25	3024	1648	18	18	10	Bea
5	1	1	1	65	26	3051	1636	89	25	14	ee
5	1	1	1	65	27	3155	1633	82	31	2	Ras
4	1	1	1	66	0	581	1651	2660	53	-1	
5	1	1	1	66	1	581	1682	13	15	29	“
5	1	1	1	66	2	693	1686	4	2	0	E
5	1	1	1	66	3	919	1681	44	7	0	CS
5	1	1	1	66	4	1057	1677	24	11	23	oy
5	1	1	1	66	5	1154	1681	6	3	0	E
5	1	1	1	66	6	1221	1678	4	2	30	:
5	1	1	1	66	7	1291	1672	2	3	35	;
5	1	1	1	66	8	1376	1686	6	2	14	7
5	1	1	1	66	9	1922	1668	91	36	33	rete
5	1	1	1	66	10	2026	1667	113	27	29	SOS
5	1	1	1	66	11	2149	1668	18	16	17	AS
5	1	1	1	66	12	2179	1667	99	27	7	deed
5	1	1	1	66	13	2287	1667	6	9	28	Dg
5	1	1	1	66	14	2303	1667	85	22	20	eee
5	1	1	1	66	15	2393	1672	20	25	15	ri
5	1	1	1	66	16	2433	1663	100	40	8	eRe
5	1	1	1	66	17	2710	1684	2	2	60	:
5	1	1	1	66	18	2794	1664	104	22	11	ay
5	1	1	1	66	19	2918	1668	62	26	10	REA
5	1	1	1	66	20	2994	1667	66	24	32	SEN
5	1	1	1	66	21	3069	1663	65	27	25	Bote
5	1	1	1	66	22	3135	1651	21	48	39	Af
5	1	1	1	66	23	3194	1665	47	26	21	SC
4	1	1	1	67	0	571	1683	2834	30	-1	
5	1	1	1	67	1	571	1692	55	21	16	cm
5	1	1	1	67	2	651	1711	5	1	26	tee
5	1	1	1	67	3	731	1700	5	3	59	-
5	1	1	1	67	4	1474	1699	3	3	13	7
5	1	1	1	67	5	1876	1689	47	22	15	tl
5	1	1	1	67	6	1956	1686	72	22	15	WOE
5	1	1	1	67	7	2041	1688	106	21	39	COG
5	1	1	1	67	8	2164	1690	18	18	26	LE
5	1	1	1	67	9	2199	1690	79	19	16	Seam
5	1	1	1	67	10	2288	1693	8	8	0	pey
5	1	1	1	67	11	2310	1688	81	21	13	eae
5	1	1	1	67	12	2499	1690	7	7	0	eS
5	1	1	1	67	13	2794	1685	18	14	0	p4
5	1	1	1	67	14	2819	1686	76	23	3	es
5	1	1	1	67	15	2915	1684	22	23	14	Ba
5	1	1	1	67	16	2981	1686	108	21	16	RIL
5	1	1	1	67	17	3104	1684	25	18	32	Or
5	1	1	1	67	18	3139	1683	98	23	12	Raped
5	1	1	1	67	19	3403	1698	2	2	0	-
4	1	1	1	68	0	565	1691	2816	57	-1	
5	1	1	1	68	1	565	1713	158	32	32	Feast
5	1	1	1	68	2	1264	1720	25	2	7	—
5	1	1	1	68	3	1774	1719	62	15	20	PPE
5	1	1	1	68	4	1844	1694	299	48	15	Nic
5	1	1	1	68	5	2183	1712	55	19	0	eater
5	1	1	1	68	6	2268	1707	131	30	18	eR
5	1	1	1	68	7	2414	1699	125	49	14	ee
5	1	1	1	68	8	2794	1697	100	36	28	SSN
5	1	1	1	68	9	2936	1696	22	33	18	2
5	1	1	1	68	10	2968	1687	72	65	6	EAU
5	1	1	1	68	11	3043	1691	197	57	19	Seem
5	1	1	1	68	12	3267	1705	72	24	7	Surana
4	1	1	1	69	0	548	1729	2854	38	-1	
5	1	1	1	69	1	548	1736	70	31	31	BIEN
5	1	1	1	69	2	643	1745	61	19	10	Wet
5	1	1	1	69	3	716	1735	93	29	25	ART
5	1	1	1	69	4	778	1731	23	44	15	i
5	1	1	1	69	5	864	1759	26	6	37	a
5	1	1	1	69	6	980	1742	5	4	0	:
5	1	1	1	69	7	1086	1742	4	3	0	:
5	1	1	1	69	8	1278	1755	6	4	35	7
5	1	1	1	69	9	1722	1739	116	24	39	eg
5	1	1	1	69	10	1903	1741	147	7	30	sateen
5	1	1	1	69	11	2267	1735	59	20	27	ia
5	1	1	1	69	12	2337	1733	91	28	14	eee
5	1	1	1	69	13	2802	1732	114	28	15	Borage
5	1	1	1	69	14	2934	1734	57	26	21	eh
5	1	1	1	69	15	3007	1737	74	22	29	Wai
5	1	1	1	69	16	3119	1733	73	19	15	eae
5	1	1	1	69	17	3205	1729	111	32	10	Pree
5	1	1	1	69	18	3395	1737	7	3	47	:
4	1	1	1	70	0	596	1740	2783	67	-1	
5	1	1	1	70	1	596	1760	75	44	17	Pan
5	1	1	1	70	2	701	1765	49	34	22	SO
5	1	1	1	70	3	817	1761	107	45	8	en,
5	1	1	1	70	4	938	1765	103	42	0	Besa
5	1	1	1	70	5	1090	1765	90	22	18	tn
5	1	1	1	70	6	1211	1757	43	37	55	E@
5	1	1	1	70	7	1279	1755	48	28	93	Tide
5	1	1	1	70	8	1340	1755	183	28	96	Recorder
5	1	1	1	70	9	1492	1751	33	47	95	4
5	1	1	1	70	10	1665	1764	57	23	14	ge
5	1	1	1	70	11	1770	1756	82	39	27	RLS
5	1	1	1	70	12	1854	1756	160	38	13	eS
5	1	1	1	70	13	1923	1752	36	47	34	ie
5	1	1	1	70	14	1982	1752	36	47	39	al
5	1	1	1	70	15	2251	1759	118	34	5	paket
5	1	1	1	70	16	2379	1759	58	28	9	tee
5	1	1	1	70	17	2478	1753	49	35	26	itn
5	1	1	1	70	18	2782	1753	53	31	28	BI
5	1	1	1	70	19	2855	1750	77	34	23	Page
5	1	1	1	70	20	2940	1740	72	47	50	aR
5	1	1	1	70	21	3013	1749	24	46	42	A
5	1	1	1	70	22	3083	1756	70	30	15	apes
5	1	1	1	70	23	3140	1749	46	46	15	PH
5	1	1	1	70	24	3201	1749	47	46	0	naan
5	1	1	1	70	25	3307	1762	14	19	17	baat
5	1	1	1	70	26	3354	1749	24	46	24	ce
4	1	1	1	71	0	566	1776	2785	33	-1	
5	1	1	1	71	1	570	1779	9	33	18	FT
5	1	1	1	71	2	619	1790	85	13	17	Ea
5	1	1	1	71	3	733	1793	21	5	10	etre
5	1	1	1	71	4	806	1779	31	33	33	BAO
5	1	1	1	71	5	839	1779	22	33	24	EOS
5	1	1	1	71	6	877	1797	21	8	23	TY
5	1	1	1	71	7	935	1787	22	16	22	Tih
5	1	1	1	71	8	960	1779	18	33	18	4:
5	1	1	1	71	9	996	1792	10	6	9	Se
5	1	1	1	71	10	1015	1779	12	33	57	7
5	1	1	1	71	11	1105	1786	14	15	41	ees
5	1	1	1	71	12	1215	1789	32	15	21	be
5	1	1	1	71	13	1264	1793	16	11	16	per
5	1	1	1	71	14	1469	1792	62	11	16	eas
5	1	1	1	71	15	1601	1778	23	33	37	pee
5	1	1	1	71	16	1624	1789	83	7	8	Rf
5	1	1	1	71	17	1736	1778	28	33	32	eer
5	1	1	1	71	18	1806	1786	43	14	3	PARES
5	1	1	1	71	19	1865	1789	77	10	1	ROE
5	1	1	1	71	20	1967	1793	2	2	3	ty
5	1	1	1	71	21	2259	1789	8	7	28	Ati
5	1	1	1	71	22	2326	1790	2	3	47	ha
5	1	1	1	71	23	2785	1785	6	8	0	Q
5	1	1	1	71	24	2841	1776	8	33	27	fi
5	1	1	1	71	25	2983	1782	37	14	7	Soe
5	1	1	1	71	26	3095	1784	25	13	29	ea
5	1	1	1	71	27	3122	1779	50	18	14	ia
5	1	1	1	71	28	3350	1790	1	3	23	:
4	1	1	1	72	0	565	1778	2808	55	-1	
5	1	1	1	72	1	565	1782	19	46	44	EL
5	1	1	1	72	2	676	1804	39	19	18	Bag
5	1	1	1	72	3	727	1798	56	28	0	iks
5	1	1	1	72	4	785	1785	97	46	4	Perera
5	1	1	1	72	5	946	1791	45	34	34	cal
5	1	1	1	72	6	1010	1789	25	38	24	ys
5	1	1	1	72	7	1123	1793	7	28	12	?
5	1	1	1	72	8	1222	1803	49	21	12	bs
5	1	1	1	72	9	1301	1811	20	6	13	een
5	1	1	1	72	10	1347	1804	71	9	23	ere
5	1	1	1	72	11	1442	1792	104	33	24	ee
5	1	1	1	72	12	1578	1808	27	4	17	er
5	1	1	1	72	13	1639	1801	21	25	25	iar
5	1	1	1	72	14	1684	1781	35	52	36	esd
5	1	1	1	72	15	1718	1785	71	43	11	Loe
5	1	1	1	72	16	1805	1792	161	37	23	ees
5	1	1	1	72	17	2268	1788	102	35	34	wa
5	1	1	1	72	18	2726	1778	67	49	0	ages
5	1	1	1	72	19	2812	1783	41	31	24	sd
5	1	1	1	72	20	2933	1783	37	34	19	Oe
5	1	1	1	72	21	2989	1782	121	35	21	eS
5	1	1	1	72	22	3120	1787	126	31	2	poe
5	1	1	1	72	23	3370	1798	3	2	0	:
4	1	1	1	73	0	160	1811	3231	60	-1	
5	1	1	1	73	1	160	1834	3	1	0	'
5	1	1	1	73	2	565	1837	84	7	0	eee
5	1	1	1	73	3	662	1822	31	11	0	itiaeeiee
5	1	1	1	73	4	792	1829	26	17	8	nd)
5	1	1	1	73	5	828	1837	24	15	24	Be
5	1	1	1	73	6	895	1822	129	49	37	Gita
5	1	1	1	73	7	1050	1816	52	37	11	Loon
5	1	1	1	73	8	1124	1843	2	4	39	(
5	1	1	1	73	9	1215	1821	14	32	7	ee
5	1	1	1	73	10	1248	1827	46	31	42	ate
5	1	1	1	73	11	1303	1827	117	26	0	beiiest
5	1	1	1	73	12	1449	1824	50	35	16	pee
5	1	1	1	73	13	1513	1837	16	13	43	se
5	1	1	1	73	14	1553	1822	53	37	3	eft
5	1	1	1	73	15	1638	1817	19	32	23	ot
5	1	1	1	73	16	1677	1812	36	54	9	ace
5	1	1	1	73	17	1726	1816	59	43	0	rehe
5	1	1	1	73	18	1791	1825	44	24	25	RE
5	1	1	1	73	19	1834	1812	54	54	0	aan
5	1	1	1	73	20	1895	1821	44	40	48	ay
5	1	1	1	73	21	2029	1848	2	2	30	:
5	1	1	1	73	22	2288	1821	28	10	30	“sit
5	1	1	1	73	23	2728	1820	55	32	23	iis
5	1	1	1	73	24	2807	1818	35	27	29	Pf
5	1	1	1	73	25	2954	1827	4	5	0	‘
5	1	1	1	73	26	2967	1811	245	48	19	Aerialiimage:24,
5	1	1	1	73	27	3219	1811	88	48	19	March
5	1	1	1	73	28	3322	1815	69	23	96	2019
4	1	1	1	74	0	571	1844	2723	37	-1	
5	1	1	1	74	1	571	1853	120	28	0	Ged
5	1	1	1	74	2	728	1876	3	3	9	epee
5	1	1	1	74	3	809	1852	67	30	22	tay
5	1	1	1	74	4	938	1843	39	43	25	SEES
5	1	1	1	74	5	987	1843	41	43	0	T's
5	1	1	1	74	6	1035	1857	24	14	21	Ns
5	1	1	1	74	7	1060	1851	10	20	33	ie
5	1	1	1	74	8	1106	1851	17	29	26	Se
5	1	1	1	74	9	1128	1851	66	29	0	Crare
5	1	1	1	74	10	1174	1843	51	43	0	mie
5	1	1	1	74	11	1262	1854	151	26	22	ssa
5	1	1	1	74	12	1430	1850	145	30	8	SLU
5	1	1	1	74	13	1503	1843	23	43	34	tn
5	1	1	1	74	14	1561	1843	29	43	27	here
5	1	1	1	74	15	1607	1843	30	43	12	Og
5	1	1	1	74	16	1668	1849	36	30	4	sn
5	1	1	1	74	17	1761	1848	51	30	45	PRR!
5	1	1	1	74	18	1815	1855	33	21	11	Da
5	1	1	1	74	19	1851	1847	88	33	0	pees
5	1	1	1	74	20	1926	1843	15	43	0	g
5	1	1	1	74	21	2725	1848	50	27	34	Cie
5	1	1	1	74	22	2767	1844	31	40	34	be
5	1	1	1	74	23	2798	1848	42	26	21	Oe
5	1	1	1	74	24	2960	1847	143	31	19	SORTS)
5	1	1	1	74	25	3088	1840	80	44	22	Ae
5	1	1	1	74	26	3179	1844	43	30	21	lee
5	1	1	1	74	27	3293	1857	1	4	0	*
4	1	1	1	75	0	857	1860	2551	46	-1	
5	1	1	1	75	1	625	1873	140	33	25	Ca
5	1	1	1	75	2	744	1863	111	55	30	ein
5	1	1	1	75	3	857	1871	250	35	15	see
5	1	1	1	75	4	1088	1863	56	55	13	er
5	1	1	1	75	5	1193	1863	29	55	13	aE
5	1	1	1	75	6	1236	1879	27	27	19	nl
5	1	1	1	75	7	1280	1868	58	38	30	Oa
5	1	1	1	75	8	1381	1872	32	32	12	oa
5	1	1	1	75	9	1426	1878	57	28	36	aa
5	1	1	1	75	10	1497	1868	11	36	10	ia
5	1	1	1	75	11	1517	1874	47	32	25	oe
5	1	1	1	75	12	1584	1879	148	27	15	ee
5	1	1	1	75	13	1739	1863	60	55	20	eka
5	1	1	1	75	14	1826	1879	91	27	22	ee
5	1	1	1	75	15	2736	1875	40	31	20	ey
5	1	1	1	75	16	2795	1874	51	32	18	a
5	1	1	1	75	17	2960	1889	58	17	30	can
5	1	1	1	75	18	3044	1860	364	46	20	See
4	1	1	1	76	0	145	1934	3196	44	-1	
5	1	1	1	76	1	145	1948	153	30	96	LEGEND
5	1	1	1	76	2	1140	1935	61	41	96	Title:
5	1	1	1	76	3	2842	1934	85	41	96	Figure:
5	1	1	1	76	4	3295	1946	46	19	96	Rev:
4	1	1	1	77	0	278	2012	3075	40	-1	
5	1	1	1	77	1	278	2012	143	28	96	Offshore
5	1	1	1	77	2	432	2012	104	28	96	ADCP
5	1	1	1	77	3	1151	2012	272	40	96	Instrument
5	1	1	1	77	4	1440	2012	247	40	96	Locations
5	1	1	1	77	5	2856	2012	65	40	96	1-1
5	1	1	1	77	6	3315	2012	38	40	96	A
4	1	1	1	78	0	192	2075	585	38	-1	
5	1	1	1	78	1	192	2075	38	38	80	@
5	1	1	1	78	2	279	2076	98	28	52	In-situ
5	1	1	1	78	3	390	2076	104	28	95	Water
5	1	1	1	78	4	506	2076	84	28	96	Level
5	1	1	1	78	5	605	2076	172	28	96	Recorders
4	1	1	1	79	0	2966	2119	115	37	-1	
5	1	1	1	79	1	2966	2119	115	37	2	sm
4	1	1	1	80	0	1150	2142	1903	57	-1	
5	1	1	1	80	1	1150	2160	49	19	95	BMT
5	1	1	1	80	2	1206	2161	125	18	95	endeavours
5	1	1	1	80	3	1338	2160	20	19	95	to
5	1	1	1	80	4	1366	2165	75	14	96	ensure
5	1	1	1	80	5	1448	2160	41	19	96	that
5	1	1	1	80	6	1495	2160	33	19	96	the
5	1	1	1	80	7	1537	2160	119	19	96	information
5	1	1	1	80	8	1666	2160	91	24	97	provided
5	1	1	1	80	9	1767	2160	18	19	96	in
5	1	1	1	80	10	1791	2160	38	19	96	this
5	1	1	1	80	11	2940	2147	18	36	73	4
5	1	1	1	80	12	2962	2142	91	57	0	1.
4	1	1	1	81	0	1150	2168	1869	62	-1	
5	1	1	1	81	1	1150	2195	45	19	96	map
5	1	1	1	81	2	1204	2191	16	18	96	is
5	1	1	1	81	3	1229	2190	78	19	96	correct
5	1	1	1	81	4	1314	2190	20	19	95	at
5	1	1	1	81	5	1341	2190	32	19	95	the
5	1	1	1	81	6	1380	2190	46	19	96	time
5	1	1	1	81	7	1434	2190	23	19	97	of
5	1	1	1	81	8	1463	2190	122	24	96	publication.
5	1	1	1	81	9	1596	2190	50	19	96	BMT
5	1	1	1	81	10	1652	2190	52	19	96	does
5	1	1	1	81	11	1712	2190	33	19	96	not
5	1	1	1	81	12	1752	2190	86	22	96	warrant,
5	1	1	1	81	13	2035	2196	24	25	93	N
5	1	1	1	81	14	2177	2201	17	25	95	0
5	1	1	1	81	15	2414	2201	44	25	93	05
5	1	1	1	81	16	2679	2185	42	45	54	1ki
5	1	1	1	81	17	2934	2168	29	53	42	i@
5	1	1	1	81	18	3017	2191	2	2	53	;
4	1	1	1	82	0	1150	2207	1810	41	-1	
5	1	1	1	82	1	1150	2220	108	24	96	guarantee
5	1	1	1	82	2	1266	2225	23	14	96	or
5	1	1	1	82	3	1296	2220	58	19	96	make
5	1	1	1	82	4	1363	2220	166	24	96	representations
5	1	1	1	82	5	1539	2221	103	23	96	regarding
5	1	1	1	82	6	1650	2220	33	19	97	the
5	1	1	1	82	7	1690	2225	99	19	96	currency
5	1	1	1	82	8	1797	2221	40	18	96	and
5	1	1	1	82	9	2034	2238	5	7	62	]
5	1	1	1	82	10	2429	2216	8	32	0	re
5	1	1	1	82	11	2722	2207	24	20	91	m
5	1	1	1	82	12	2934	2221	26	25	8	Lf
4	1	1	1	83	0	1150	2216	2165	69	-1	
5	1	1	1	83	1	1150	2254	102	20	0	Sciroey
5	1	1	1	83	2	1260	2250	23	19	41	OP
5	1	1	1	83	3	1290	2250	119	19	0	kaorniodon
5	1	1	1	83	4	1418	2250	105	19	23	esteemed
5	1	1	1	83	5	1533	2251	17	18	2	iri
5	1	1	1	83	6	1571	2250	12	19	0	fe
5	1	1	1	83	7	1603	2255	52	19	17	nie
5	1	1	1	83	8	2238	2216	53	69	39	SS
5	1	1	1	83	9	2940	2242	69	29	56	‘ay
5	1	1	1	83	10	3104	2221	211	60	94	BMT
4	1	1	1	84	0	2328	2267	690	31	-1	
5	1	1	1	84	1	2328	2267	111	31	96	Approx.
5	1	1	1	84	2	2451	2267	79	25	96	Scale
5	1	1	1	84	3	2967	2269	51	16	0	—-
4	1	1	1	85	0	3038	2301	138	22	-1	
5	1	1	1	85	1	3038	2301	138	22	91	www.bmt.org
4	1	1	1	86	0	1153	2358	979	28	-1	
5	1	1	1	86	1	1153	2358	90	24	41	Filepath:
5	1	1	1	86	2	1297	2362	835	24	16	—_|:\B23636.i.mpb.NoosaSpit_SEMP\DRG\COA_005_Equipment_locations.wor

Section 14

                                                                                                            3



2         Fixed Deployment Measurements
2.1       Frames of Reference
Units are expressed using the SI (Système International d'unités) convention unless otherwise stated.

Wind and wave direction are expressed as ‘FROM’ the direction of approach and in nautical degrees
(degrees relative to true north, positive clockwise).

Current direction is expressed as ‘TO’ the direction of flow and in nautical degrees (degrees relative to true
north, positive clockwise).

2.2       Deployment Period Characteristics
2.2.1     Regional Wind
Double Island Point Lighthouse weather station (040068, operated by the Bureau of Meteorology) wind
roses for the deployment period (10/03/2019 to 30/04/2019) and the long-term average (01/01/1996 to
30/04/2019) are compared in Figure 2-1. The deployment period regional wind characteristics include:

• A predominance of S to SE trade winds;

• A directional spread of winds that is relatively consistent with the long-term average, noting a slightly
  higher proportion of NNE and SSE winds;

• A lower proportion of 10-minute wind speed exceeding 20 m/s (approximately 39 knots) compared to
  the long-term average; and

• A higher proportion of 10-minute wind speeds between 10 and 15 m/s (approximately 20 to 30 knots)
    compared to the long-term average.




           Figure 2-1     Double Island Point wind magnitude and direction rose plots: deployment
                                    period (left) and long-term average (right)




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 15

                                                                                                       4


2.2.2     Regional Waves
Mooloolaba Wave Buoy (operated by the Queensland Department of Environment and Science) wave
roses for the deployment period (10/03/2019 to 30/04/2019) and long-term average (01/01/2007 to
30/04/2019) are compared in Figure 2-2. The deployment period regional wave characteristics include:

• A predominance of E to ESE wave conditions;

• A higher proportion of easterly wave conditions compared to the long-term average; and

• A slightly higher proportion of wave heights exceeding 2 m compared to the long-term average.




            Figure 2-2     Mooloolaba wave buoy significant wave height and direction rose plots:
                             deployment period (left) and long-term average (right)




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 16

                                                                                                       5


2.3       Offshore ADCP, Noosa Main Beach
Figure 1-1 shows the Noosa Main Beach Offshore ADCP deployment location. The instrument was bottom-
mounted at a depth of approximately 9.5 m below AHD.

2.3.1     Currents
Recorded current magnitude and direction offshore from Noosa Main Beach and within Laguna Bay are
presented as time series and polar plots over the following vertical segments:

• Depth-averaged over the entire water column (Figure 2-3 and Figure 2-4)

• Bottom third of the water column (Figure 2-5 and Figure 2-6)

• Middle third of the water column (Figure 2-7 and Figure 2-8)

• Top third of the water column (Figure 2-9 and Figure 2-10)

The deployment period current characteristics include:

• The depth-averaged currents were typically less than 0.2 m/s except for the final week of deployment
  which coincided with increased winds. The currents align NE to SW with the ebb and flood phases of
   the tide and show a weak residual to the SW. The prevailing wave energy is likely to enhance the net
   SW current direction at this location (refer Section 2.3.2).

• The bottom third of the water column currents were typically less than 0.15 m/s and not strongly
  influenced by winds. The currents align NE to SW with a very weak residual to the SW.

• The middle third of the water column currents were higher in magnitude and show a stronger residual
  toward the SW compared to the bottom currents.

• The highest magnitude currents occur in top third of the water column where they are influenced by wind
  shear at the water surface. The current direction at the surface is more variable due to the wind.




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 17

                                                                                                 6




         Figure 2-3     Depth-averaged (entire water column) current magnitude (top) and direction
                                             (bottom) time series




         Figure 2-4    Depth-averaged (entire water column) current magnitude (m/s) and direction
                                              polar scatter plot




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 18

                                                                                                    7




         Figure 2-5     Bottom third of water column current magnitude (top) and direction (bottom)
                                                  time series




           Figure 2-6    Bottom third of water column current magnitude (m/s) and direction polar
                                                  scatter plot




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 19

                                                                                                    8




         Figure 2-7     Middle third of water column current magnitude (top) and direction (bottom)
                                                  time series




           Figure 2-8    Middle third of water column current magnitude (m/s) and direction polar
                                                  scatter plot




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 20

                                                                                                    9




           Figure 2-9    Top third of water column current magnitude (top) and direction (bottom)
                                                 time series




             Figure 2-10 Top third of water column current magnitude (m/s) and direction polar
                                                scatter plot




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 21

                                                                                                          10


2.3.2     Waves
Recorded significant wave height (Hs or Hsig), wave peak period (Tp) and wave direction time series are
shown in Figure 2-11. The distribution of significant wave height and direction is also illustrated in Figure
2-12. The Laguna Bay wave climate for the deployment period had the following characteristics:

• Significant wave height typically less than 1.5 m except for the final week of deployment which coincided
   with increased winds and increased significant wave height close to 2.0 m.

• Wave peak period was typically between 7 and 9 s.

• Due to wave refraction processes at Noosa Headland (Noosa National Park) the dominant wave
   direction was from the NNE to NE sector. The consistent direction of wave approach is likely to contribute
   to the observed net SW currents shown in Section 2.3.1.




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 22

                                                                                                11




            Figure 2-11 Recorded significant wave height (top), peak period (middle) and wave
                                           direction (bottom)




                    Figure 2-12 Recorded significant wave height and direction rose plot




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 23

                                                                                                            12



2.4        Tide Recorders, Noosa Main Beach & Lower Noosa River
The recorded water level offshore from Noosa Main Beach (Laguna Bay) and within the lower Noosa River
time series plots are presented in Figure 2-13 to Figure 2-15. Each plot compares the offshore tidal water
level variation with the attenuated condition within the lower Noosa River.

Table 2-1 provides a summary minimum and maximum water level recorded at each location and shows a
significant reduction in the tidal range between Laguna Bay and inside the river entrance. According to
common tidal range classification, Laguna Bay is mesotidal (tidal range between 2 and 4 m) and the lower
Noosa River is microtidal location (tidal range less than 2 m). It is noted that the published astronomic tidal
range for Munna Point 1.0 m and Tewantin is 0.89 m and the recordings are generally within this range.

It is noted that Tide Recorder 2 (bottom plot in Figure 2-13) appeared to have been moved on retrieval of
the instrument. The raw data suggested that this occurred during the first week of deployment. Data
recorded before this time has been discarded.

                                       Table 2-1        Summary of recorded tidal range

 Location                                                     Minimum         Maximum            Range
                                                              (m MSL*)        (m MSL*)            (m)
 Noosa Main Beach (Laguna Bay)                                  -1.33            1.53             2.86
 Tide Recorder 1 (river mouth)                                  -0.40            0.77             1.17
 Tide Recorder 2 (Noosa Sound east)                             -0.33            0.61             0.94
 Tide Recorder 3 (Munna Point)                                  -0.31            0.61             0.92
 Tide Recorder 4 (Noosa Yacht Club)                             -0.29            0.55             0.84
 Tide Recorder 5 (Noosa Marina, Tewantin)                       -0.29            0.56             0.85
 Tide Recorder 6 (Tewantin Ferry crossing)                      -0.27            0.39             0.66
 *mean sea level for the instrument deployment period




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 24

                                                                                                                             13




                                     Figure 2-13 Recorded Water Level – Tide Recorder 1 (top) and Tide Recorder 2 (bottom)



G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 25

                                                                                                                             14




                                     Figure 2-14 Recorded Water Level – Tide Recorder 3 (top) and Tide Recorder 4 (bottom)



G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 26

                                                                                                                             15




                                     Figure 2-15 Recorded Water Level – Tide Recorder 5 (top) and Tide Recorder 6 (bottom)



G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.003.MetoceanRetrieval.docx

Section 27

Noosa Spit SEMP Final Report                                           B-1
Bathymetric Survey (Acoustic Imagery 2019)




Appendix B                Bathymetric Survey (Acoustic Imagery 2019)




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx

Section 28

          Noosa River Survey
(Ferry Crossing to Offshore of Entrance)
              March 2019

            Noosa Council




          Assembled by D. Bergersen
                26 March 2019
          Last Revised: 20 June 2019
                 Version 1.1

Section 29

‘–‡–•
EXECUTIVE SUMMARY ............................................................................................................3
1.0      INTRODUCTION .............................................................................................................4
2.0      SYSTEM COMPONENTS ...............................................................................................6
    2.1 EDGETECH 6205 MULTIPHASE ECHOSOUNDER .....................................................................6
    2.2 APPLANIX POS MV W AVEMASTER .......................................................................................6
    2.3 SONTEK CASTAWAY CTD ....................................................................................................7
    2.4 QPS ACQUISITION, PROCESSING, AND ANALYSIS SOFTWARE ................................................7
    2.5 LAND TRANSECTS AND SINGLE BEAM ECHOSOUNDER ...........................................................8
3.0      GEODETICS AND DATA REDUCTION .........................................................................9
4.0      SYSTEM INSTALLATION AND CALIBRATION ......................................................... 10
    4.1 SYSTEM INSTALLATION ..................................................................................................... 10
    4.2 SYSTEM COMMUNICATION AND CALIBRATION ..................................................................... 13
5.0      DATA PROCESSING ................................................................................................... 15
6.0      RESULTS ..................................................................................................................... 17
    SURVEY OPERATIONS............................................................................................................. 17
    COMPARISON TO EXISTING BATHYMETRY AND FUTURE SURVEYS ............................................. 21
    BACKSCATTER DATA .............................................................................................................. 22
7.0      SUMMARY ................................................................................................................... 23




2                                           Noosa Council - Noosa River Survey                                             20.06.2019

:  i :  Pi bid    ii    iio    7 TN    co
    ro)
     2 ot
     :  r © Co
     :  : :  pon
     fob;    baa             eee ENA
     ii   :  Ss aS
     PoE     PEGG      Pe ees
     ioboi   Poiob oi  PoP   oi:  oo   Port  :                                                                 So
     Poi     PE bE     PPE:      PoE   eS
     :  : :  PEP GG    :  :  iG  :  :  Poi:  :                                                                 g
     :  : :  PEGG      :  :  Dot :  :  Por:  :                                                                 N
     io:  oi PobobGG   io    ii  ii    Port  :                                                                 8
     Poi  i  Piiw i i     Pod       Bobb                                                                       S
     foi   8) 8296           fe  i     or                                                                      g
     ii    F523 Bo           ici    :  :O :  i                                                                 =
                             ns
     :  : Pow iga            : a :  :  :Z :  :                                                                 5
     ob   oi Fb ida    is    Pio    ois:     :
     i  of & cf g& & 2       i=  i  :  itt   :                                                                 ”
     :  : :  Hoi    Qa :     Dot :  :  :  :  :
     :  io uo gue &          it  ii    i>}   :                                                                 5
     i  i fa | B83     fo    i:  ii    Pe;   i
     PGs ye gues             :G  i  i  im    it                                                                $
     :  : Z  3:95 66         io  ot :  ii:   :                                                                 2
     ii   Pw    28     PEE:      ii    iD    t
     fob ow tGq52 4 2        if  i  PGS:     i                                                                 «
     :  : i Qi igs     i: <  Dt  :  :  Sut   :
     i    2 3236             PoE       io i i
    >   : Zz FeEOO SE        i=  i     iS i  :                                                                 S
       ro                  ri                                                                                  2
     poo: i Or:     x    a   iz  i  :  2D:   :
     i    3 $28              :O  ii    2B:   ;
     5a 225         G64 Aa  229     Poise:   :                                                                 S
       Uesah                        7                                                                          2
                  ee EOD            :  :O :  :                                                                 =
    298 89503            - 3Z20     i  rz:   :                                                                 3
    n a         Fen Qg 42           a  ar    :                                                                 £
 n       = oP ee OF 236             i Oo:    i                                                                 3
am  uw O HW a S225 5        <2 0    i Z2s<   :                                                                 8
 Ss 5 & & $3082 u E 5S O            : OW;    :                                                                oO
 o     ee   Hewett       s 2888          <                                                                     a
7 aia                                                                                                          3
 5g         eee                                                                                                :
              oO    Z    no Lu        Ww Zz
S*x2e         10)        >a ee au       BE =
    Wi  = , ainaiaial       nn a      Scs =
                      covet           Sal @
                      od     ~    6 28a
                                6S  9 NOM   NS
                                   ©        °                                                                  N

Section 30

Executive Summary
Two surveys were conducted for the Noosa Council across a section of the Noosa River
extending from the Noosa Ferry crossing to offshore of the Noosa River entrance: a
multiphase echo sounder (MPES) swath survey and a single beam echo sounder (SBES) /
land transect survey. The latter focussed on shorelines and sand banks around the entrance
to the river not surveyed by the swath mapping system. Both surveys were completed without
any safety incidents and in a timely manner.
The MPES produced both bathymetry and backscatter (sidescan sonar) data. The emphasis
for this survey was the bathymetry data in support of a shoreline erosion study being
conducted by coastal engineering consultants. However, the backscatter data were also
logged for possible future use in other Noosa Council projects and a small sample of the
processed data is presented in this report.
Positioning accuracy (horizontal and vertical) for all survey data were 1-2cm, with all data
reduced to AHD. Approximately 2.0 km2 of river area were surveyed with 100% swath
coverage, a considerable amount considering the bulk of the river depth is around 2m AHD.
The MPES and SBES data were combined and interpolated to produce a composite digital
terrain model (DTM) for the entire survey area. A highly detailed view of river and entrance
features was obtained, and the swath coverage should assist in the engineering modelling
efforts being undertaken by the Noosa Council.
The backscatter data, although not a focus of this report, can be used in the future for such
objectives as seabed characterisation and detection of small features on the riverbed or along
the river banks (e.g., anthropogenic debris, rocks, soft sediment areas, etc.).
In turn, the combined data set, when imported into a 3D/4D Scene, should provide the Noosa
Council with a useful marketing tool to highlight dynamic nature of the river and the complex
topography hidden beneath the main water body.




3                             Noosa Council - Noosa River Survey                    20.06.2019

Section 31

1.0 Introduction
Acoustic Imaging Pty Ltd (AI) was contracted by the Noosa Council (NC) to carry out a
bathymetry and land survey of the Noosa River extending from the Noosa River Ferry
crossing to 500m offshore of the Noosa River entrance. Both surveys will contribute to a
Shoreline Erosion Management Plan being developed for the Noosa Spit region by coastal
engineering consultants (Figure 1).
The specific survey services requested by NC included:
    •   A hydrographic survey of the Noosa River and river mouth, and;
    •   A land-based survey of shoreline positions and sand shoals to overlap the
        hydrographic survey points.




                       Figure 1: Regional overview of Noosa River survey.



Three primary surveys were conducted as part of this project.
    •   An initial multiphase echo sounder (MPES) survey was conducted using the Marine &
        Earth Sciences (MES) vessel SURVEY1 between March 14-20, 2019. Survey
        coverage over this period essentially mapped all areas deeper than the 0.5m contour
        on the prevailing tide.
    •   A secondary single beam echo sounder (SBES) survey conducted on April 09, 2019
        to augment depth information across the sand shoal region of the Noosa River
        Entrance.
    •   A selective land survey conducted on April 09 and further infill on May 02, 2019 to
        capture beach transects, exposed sand shoals in the Entrance region, and foreshore
        regions around Dog Beach and along Gympie Terrace.




4                             Noosa Council - Noosa River Survey                    20.06.2019

Section 32

The swath mapping system consisted of:
    •   Edgetech 6205 Multiphase Echo Sounder (bathymetry and backscatter);
    •   Applanix POS MV Wavemaster (positioning, motion, and heading data);
    •   AML micro-SVS (sound velocity at the sonar head);
    •   SonTek Castaway CTD (sound velocity through the water column);
    •   QPS QINSy software (data acquisition and real-time quality control);
    •   QPS Qimera and Fledermaus (data processing, editing, validation, and presentation);
    •   Chesapeake Technology SonarWiz (backscatter data processing).

An RTK GNSS antenna and Ceeducer single beam echosounder transducer were used for
the shallow sand bank and beach/foreshore transects.
This report provides an overview of the results from the Noosa River survey and forms a part
of the data deliverables consisting of:
    •   Ungridded processed data in XYZ Ascii format;
    •   Digital terrain models (gridded data) in XYZ Ascii format;
    •   Contours across various survey blocks in the river and offshore;
    •   Backscatter mosaic of selected representative areas in GeoTiff format;
    •   Fledermaus Scene containing relevant data sets for further review by NC;
    •   Daily reports during survey operations to convey progress and any incidents affecting
        operations; and
    •   Summary report discussing survey results.




5                             Noosa Council - Noosa River Survey                   20.06.2019

Section 33

 6\VWHP&RPSRQHQWV
2.1 Edgetech 6205 Multiphase Echosounder
The swath mapping sonar used for the survey was an Edgetech 6205 (ET6205) Multiphase
Echo Sounder (MPES). The ET6205 produces real-time, high resolution, three dimensional
maps of the seafloor whilst providing co-registered simultaneous dual frequency side scan
imagery.
For the bathymetry, the ET6205 uses ten receive element transducers and one discrete
transmit element. The high number of channels enables superior rejection of multipath
effects, reverberation and acoustic noise commonly encountered in the shallow water survey
environment. The frequency of the bathymetry channels is 550kHz with an effective “beam”
size of 1º x 1º.




                           Figure 2: Edgetech 6205 transducer head



The sidescan sonar imagery is spread across 4 channels of information: 2 channels at
230kHz and 2 channels at 550kHz. The lower frequency channels provide more information
on seabed types whereas the higher frequency channels are better for object / feature
detection.
An AML Micro-X Sound Velocity Sensor (SVS) at the head of the sonar provided sound
velocity information required for beam steering on a per ping basis. The Micro-X has
capabilities for measuring sound velocity ranges from 1375 m/s to 1625 m/s at an accuracy of
0.025 m/s.



2.2 Applanix POS MV Wavemaster
The Positioning and Orientation solution for this project was an Applanix POS MV
Wavemaster consisting of a small form factor (SFF) POS Control System (PCS) with IP68
water submersible Titanium sealed IMU and a pair of Trimble antennas.




                      Figure 3: Applanix POS MV Wavemaster components.




6                            Noosa Council - Noosa River Survey                   20.06.2019

Section 34

The POS MV Wavemaster is a user-friendly, turnkey system designed and built to provide
accurate attitude, heading, heave, position, and velocity data. POS MV is proven in all
conditions and is the georeferencing and motion compensation solution of choice for
hydrographic professionals.
A Fugro Marinestar navigation aiding subscription was activated as part of the Noosa River
survey, improving the real-time positioning of the system to less than 10cm horizontally and
vertically. The raw positioning and orientation data were post-processed in the Applanix
POSPac MMS software package to further improve horizontal and vertical accuracy to less
than 5cm.
Roll and Pitch accuracy from the IMU were approximately 0.03°, with Heave accuracy around
5cm. Heading accuracy post-calibration was around 0.1°.



2.3 Sontek Castaway CTD
To correct for refraction through the water column a sound velocity probe must be employed
during any hydrographic survey. The unit used for this survey was a SonTek CastAway CTD.
Designed for coastal profiling, the CastAway-CTD® incorporates a 6-electrode conductivity
cell, coupled with a fast response thermistor to provide highly accurate, high resolution CTD
measurements to depths of 100 m. The sound velocity accuracy derived from the CTD is 0.15
m/s. The unit has an in-built GNSS chip that captures the time and location of the CTD profile,
and BlueTooth capability for transferring data.




                                Figure 4: Sontek Castaway CTD.


During acquisition a comparison between the currently loaded SVP and the sound velocity
measured at the transducer head was monitored. If differences became too pronounced, then
another CTD cast was implemented. In water depths where relevant, a cast was made at a
minimum of the start, the middle, and the end of each survey day.


2.4 QPS and Chesapeake Acquisition, Processing, and Analysis
Software
The QPS QINSy package was used for data acquisition. The software has an excellent
reputation for robustness and stability and provided a number of useful online quality control
(QC) displays for data monitoring. QINSy logs all raw data in a proprietary DB format, and
geospatially corrected data (XYZ solution) in a QPD format. Options exist for exporting a
variety of non-proprietary formats.




                         Figure 5: Typical QC displays offered by QINSy.



7                              Noosa Council - Noosa River Survey                    20.06.2019

Section 35

Further processing of the data was done in the QPS Qimera and Chesapeake SonarWiz
software packages. Qimera was used to correct, clean, and reduce the bathymetry data to the
AUSGEOID09 datum, whereas SonarWiz was used to geospatially correct and image
enhance the sidescan sonar data into mosaics.




                          Figure 6: Qimera post-processing software.



All data were combined in Fledermaus to better assess the relationship between the
bathymetry and backscatter data, and to QC the results from all survey areas.



2.5 Land Transects and Single Beam Echosounder
Ground elevations over the sandbank and beach profiles were acquired using a Leica GNSS
GG04 Smart Antenna interfaced to a handheld computer operating Zeno Mobile software for
data collection. Real time corrections were received from HxGN Smartnet via a mobile link.
The antenna was mounted at a fixed height on a backpack unit with data acquired every
second whilst walking over the mapping areas. 
Ground elevations over the very shallow water areas were captured from a shallow draft
dingy fitted with a 200kHz Ceeducer Ceescope single beam echo sounder (SBES) operating
at 6 pings per second. SBES data were acquired with Chesapeake Technology SonarWiz
software along with positioning and time stamp information 6 times per second. Vertical
accuracy of the single beam transducer at 8 degree beam width is 0.02% of depth or 1cm,
whichever is greater. The Leica GNSS GG04 Smart Antenna was located above the
transducer at a fixed height and provided elevation of the transducer face to reduce the
soundings to datum. Bar checks were undertaken prior to data acquisition and determined a
water velocity of 1518 m/s.
All data were reduced to Australian Height Datum (AHD).




8                            Noosa Council - Noosa River Survey                  20.06.2019

Section 36

3.0 Geodetics and Data Reduction
For the Noosa River survey real-time positioning was provided via a direct Fugro Marinestar
G4+ tight coupling with the POS MV Primary GNSS antenna and GNSS inertial solution. This
aiding solution was at the ITRF2014 Ellipsoid. Transformation parameters to reduce the data
to GDA94 were registered within the POSView control software, and further reductions to
AUSGEOID09 were implemented in the QINSy logging software. Background to the reduction
process is shown in the bullet points below.
    •   Satellite positioning systems generate positions to the WGS84 datum. WGS84 is the
        World Geodetic System 1984 and is the main reference for all GPS-based
        measurement systems.
    •   Australia uses the GDA94 datum. Differences between WGS84 and GDA94 are
        small, but become significant for detailed survey operations, and change in time due
        to the movement of the Australian continent relative to the satellite constellation.
    •   MGA94 is a Universal Transverse Mercator (UTM) projection of GDA94 geographical
        coordinates.
    •   Real Time Kinematic PPP GNSS systems use a geostationary satellite to transmit
        corrections to the equipped GNSS antenna positioning unit, allowing much higher
        accuracy for positioning, generally to sub 15cm level.
    •   AUSGeoid09 is a geodetic model maintained online by the Australian Government
        Dept. of Resources, Energy and Tourism. This model describes the relationship
        between the ellipsoidal height (GDA94) and the orthometric height in AHD.


Following acquisition, the POS MV data were post-processed using the Trimble CentrePoint
RTX service to improve the accuracy of the ellipsoid-referenced height in GDA94. Trimble
RTX leverages real-time satellite and atmospheric data from a global network of tracking
stations, along with highly accurate models and algorithms to generate Trimble RTX
corrections. These corrections were used to provide 1-2 cm accuracy for the georeferencing
of the dataset to AHD.
AHD is the vertical datum requested by NC. Employing the method above ensures that both
high accuracy bathymetry and on-shore NC data are referenced to AHD. Spot checks of AHD
conformance with the new swath data were conducted by comparing contours derived from
the new data to previous charts created across the survey region (selecting those areas least
likely to have experienced any erosional or depositional changes). An example image is
shown in the figure below.




            Figure 7: Alignment of chart contours with 2019 swath bathymetry contours.




9                              Noosa Council - Noosa River Survey                        20.06.2019

Section 37

4.0 System Installation and Calibration
4.1 System Installation
Installation of the swath mapping system on the MES vessel SURVEY 1 occurred on March
14, 2019. The AI Universal Sonar Mount (USM) Expedition mount was attached to the
starboard side of the SURVEY1. A permanent mounting plate is affixed to the gunnel of the
SURVEY1 and the USM hinge mount bolts on to the plate. A vertical Z-Pole is attached to the
hinge mount, and the ET6205 transducer attaches to it.
An antenna mast with GNSS spreader bar attaches to the back side of the hinge mount, and
a plate for the POS MV IMU attaches to the front side. Thus all MPES components are affixed
relative to the mount and not the vessel.




                    Figure 8: ET6205 mounted on starboard side of SURVEY1.



The Z-Pole pivots around the USM X-Pole and hence be raised out of the water during vessel
transits. Deployment of the transducer into a vertical / survey configuration was done in a very
controlled manner through a combination of purpose-built large wrench attached to the
rotation mechanism on the hinge mount and a rope attached near the base of the pole.
Recovery of the pole into a horizontal position was done in a similar manner.




10                             Noosa Council - Noosa River Survey                    20.06.2019

Section 38

In the deployed state, further support for the transducer and pole was provide by a wood
block inserted between the Z-Pole and the vessel hull, and a ratchet strap extended around
the lower part of the Z-Pole and then tightened to secure all components to the vessel.




              Figure 9: Deployment and securing of Edgetech 6205 on pole to vessel.




11                            Noosa Council - Noosa River Survey                      20.06.2019

Section 39

The two Trimble 540AP GNSS antennas associated with the POS MV were affixed to a pair
bolts at the ends of the spreader bar. The location of the mast / mount provided clear views of
all available GNSS satellites. Separation between the two antennas is mechanically designed
to be 2m but a refined measurement was derived from the GNSS Azimuthal Measurement
System (GAMS) calibration (see Calibration section below)..




        Figure 10: GNSS antenna mounting on an L-shaped bracket at the stern of the vessel.



The POS MV PCS and all other electrical equipment were housed in the bow section of the
main cabin. GNSS antenna and IMU cables were fed into the area along the starboard side of
the deck and excess cable neatly coiled within the space to minimise the risk of
trips/slips/damage to the cables.
The acquisition laptop was located on a shelf in front of the passenger seat on the port side of
the vessel. An external monitor was connected to the laptop to provide the helmsman with
display of the real-time DTM to assist in vessel steerage.




12                             Noosa Council - Noosa River Survey                       20.06.2019

Section 40

4.2 System Communication and Calibration
After the POS MV system was installed and all cables connected, basic system
communication tests were conducted to ensure that all sensors composing the POS MV were
receiving or sending data. This included checking whether the Marinestar navigation aiding
solution was being received.
The figure below shows an example of Marinestar reception in POSView, the online interface
associated with the POS MV. Fields within the User Interface (UI) were monitored for
changing values and reception of the Marinestar signal is shown in the Nav Status field.




Figure 11: POS MV Communication and Integration Tests – Marinestar integration received successful,
                      IMU, PGNSS and SGNSS received successfully.



Communication between the POS MV and the ET6205 TPU were also tested.
The heading solution for the system was already established from previous work with this
vessel and mount system. The POS MV heading solution (and associated vector between
antennas) is called a GNSS Azimuth Measurement System (GAMS). The final values derived
are as follows: X = 0.022m, Y = -2.005m, and Z = 0.008m.
Another vector derived from the data is the Primary GNSS antenna to the survey Reference
Point (selected as the target on top of the IMU). This vector was manually measured but
further refinement was possible through analysing the POS MV data acquired during the
various survey days. The final values derived are as follows: X = -0.220m, Y = 1.034m, and Z
= -0.971m.
Finally, a combination of physical measurements and design drawings for the USM mount
were used to derive a final lever arm vector for the Reference Point to the Acoustic Centre of
the ET6205. This vector is required to provide proper motion compensation and positioning
for the MPES data. The final values derived are as follows: X = -0.063m, Y = 0.401m, and Z =
1.764m.




13                             Noosa Council - Noosa River Survey                       20.06.2019

Section 41

Calibration of the ET6205 transducer mounting relative the vessel reference frame was
achieved through a Patch Test conducted during the system trials with MES on the Brisbane
River. A spot check for the Roll bias was conducted from the offshore area of the Noosa River
survey. The final bias values for the sonar are shown in the figures below.




 Figure 12: Bias values and lever arms used during processing for the Edgetech 6205 Port transducer.




     Figure 13: Bias values and lever arms used during processing for the Edgetech 6205 Starboard
                                              transducer.




14                               Noosa Council - Noosa River Survey                       20.06.2019

Section 42

5.0 Data Processing
The bathymetry data were processed in the QPS Qimera package using the following
workflow:
     •   Load logged DB files;
     •   Convert raw Range/Theta data to a geospatially corrected (XYZ) solution resulting in
         the creation of QPD files;
     •   Generate a Dynamic Surface;
     •   Load and apply processed positioning and orientation data from the Applanix POSPAC
         MMS software;
     •   Load and apply any extra SVP files from the Sontek Castaway CTD;
     •   Apply a weak Spline Filter to flag anomalous soundings as REJECTED;
     •   Manually clean (REJECT) any soundings deemed inconsistent with the river bed / sea
         bed or associated features that may be a hazard to navigation;
     •   Check Shallow and Deep Surfaces for any remaining anomalous soundings;
     •   Grid data at 0.5m and 1m bin sizes using a Weighted Moving Average algorithm with
         a Weight Diameter of 3.
     •   Export data products in a variety of formats.


Some minor modifications to this general workflow were implemented for selected lines and
areas (e.g., differing levels of Spline filtering or Beam Number filtering).
The single beam echo sounder (SBES) and land transect data were manually processed to
remove anomalous data spikes and then reduced to AHD. A comparison between SBES data
and the gridded swath bathymetry data was conducted prior to interpolation to allow
extraction of contours across the sand shoals inside the Noosa River entrance. Mean and
median differences between the two data sets was <10cm and deemed acceptable for the
survey objectives.




Figure 14: Results of cross check comparison between SBES point data and gridded swath bathymetry
                                               data.



15                               Noosa Council - Noosa River Survey                   20.06.2019

Section 43

Selected lines sidescan sonar data were processed in the Chesapeake Technology SonarWiz
package using the following workflow:
     •   Load XTF files as exported from QINSy;
     •   Check real-time bottom tracking (for slant range correction of imagery) and if necessary
         re-track using automated or manual techniques;
     •   Build Empirical Gain Normalisation (EGN) curves for main lines of each block. Apply
         EGN to files for image enhancement;
     •   If necessary, adjust DC gain associated with selected lines to better match image
         intensity across all lines used to create the mosaic;
     •   Save final / acceptable mosaic as a gray-scale GeoTiff (palette assigned acoustic
         shadows as dark pixels and high backscatter returns as light pixels).


Data deliverables included:
     •   Ungridded, geospatially-corrected, cleaned bathymetry points;
     •   Gridded, geospatially-corrected, cleaned bathymetry points;
     •   Contours at 0.5m in DXF format;
     •   8-bit backscatter mosaics of selected survey areas;


Although not delivered as part of the initial data set, we intend to assemble and submit a
Fledermaus Scene that captures all available data acquired during the survey operations and
supplied by Noosa Council as background information. We view this Scene as being
potentially useful for illustrating riverbed / seabed features that exist across the Noosa River.




16                             Noosa Council - Noosa River Survey                      20.06.2019

Section 44

6.0 Results
As this project was essentially a data gathering exercise the Results section is limited to
observations about the survey operations, internal consistency of new data, comparison to
existing bathymetric data, and some brief comments about the backscatter data acquired as
part of the survey (and how it might assist future Noosa Council projects).



Survey Operations
As a whole the survey operations went well. No equipment failures occurred and all system
deployments/recovery were conducted in a safe manner. Afternoon survey operations were
interrupted on a couple of days because of thunderstorms but close monitoring of weather
fronts via local radar ensured that all personnel were off the water before any danger of
lightning strikes occurred.
Tides were not particularly favourable during the survey or the Noosa River was shallower
than anticipated / hoped (in terms of clearance of the sonar equipment from the bottom). This
resulted in a narrower swath width per survey line and hence more lines required to provide
proper infill over the specified areas. Moored vessels also required some deviations and
additional infill. However, the area covered over the allocated 5 days of surveying was
substantial and I think provides a good baseline for future monitoring efforts.
The figures below highlight some of the features mapped along the river.




Figure 15: River depths at the upstream extent of the survey near the ferry crossing. A shallow sand bar
    prevented complete mapping along the eastern bank. The hole to the south of ferry crossing is
                                     approximately 7m deep (AHD).




17                               Noosa Council - Noosa River Survey                          20.06.2019

Section 45

     Figure 16: Rocks and sand wave field around the Marina where vessel was moored each evening.




                                 Figure 17: Munna Point Bridge region




18                               Noosa Council - Noosa River Survey                      20.06.2019

Section 46

                                  Figure 18: Dog Beach region.




              Figure 19: Noosa River Entrance region with large offshore sand bank.



Supplementing the swath bathymetry coverage were land transects and a single beam
echosounder (SBES) survey conducted over sections of the Noosa River and Entrance that

19                            Noosa Council - Noosa River Survey                      20.06.2019

Section 47

were too shallow for safe operation of the MPES equipment. The figure below shows the
location of these survey points.




                              across the Noosa River survey region.



Interpolation between these transects combined with the swath bathymetry data allowed the
creation of contours map for NC (supplied as a DXF file). All the geospatially-corrected and
cleaned data were provided to NC for gridding/interpolation using alternative techniques.




                   Figure 20: Contours across the Noosa River Entrance region.



20                            Noosa Council - Noosa River Survey                   20.06.2019

Section 48

Comparison to Existing Bathymetry and Future Surveys
Comparison of the 2019 data set to existing bathymetry across the survey area was
somewhat limited. The internal check between the 2019 swath bathymetry and 2019 SBES
bathymetry showed a mean difference of around 10cm which was deemed acceptable by NC.
The raw 2010 SBES data were not made available for this study but charts showing derived
contours were provided as PDFs. Selected sections of these PDFs were converted to Geotif
format and imported to a Fledermaus Scene for comparison against the 2019 swath
bathymetry. The charts were registered at selected contour heights within the Scene and
compared to the contours extracted from the swath bathymetry. In both upstream and
downstream locations where presumed minimal erosion or deposition had occurred (e.g., in a
protected marina) the two data sets aligned well. As such, our AHD reduction closely matches
that used for the 2010 data set.
The 2019 swath bathymetry data set should be an invaluable tool for evaluating future
changes in the Noosa River waterway, complimenting existing Lidar data across the region.
Alternative techniques to acoustic sonars may be more economically proficient for future
large-scale mapping of the river system (e.g., LIDAR systems affixed to drones, Satellite
Derived Bathymetry) but the swath techniques employed as part of this survey could be used
for more local monitoring of “problem” areas within the river or areas undergoing
development.




21                           Noosa Council - Noosa River Survey                   20.06.2019

Section 49

Backscatter Data
Although backscatter data wasn’t a focus of this project the data were logged and selected
regions processed to create mosaics. The sidescan-type backscatter data produced by the
ET6205 provide finer detail of riverbed features than the bathymetry data, and can be used to
make inferences about seabed types (e.g., the bathymetry was gridded at a 50cm bin size
whereas the sidescan sonar data was gridded at a 10cm bin size). In general, finer sediments
that absorb signal strength appear as darker pixels and coarser sediments that return more
signal appear as lighter/brighter pixels.
The example below comes from an area along Hilton Terrace. The sidescan imagery extends
to the shoreline and shows a rock-strewn area amongst softer sediments. In this case the
mosaic doesn’t show pronounced changes in backscatter strength, but the textural
information suggests may be used to show more cemented or consolidated areas relative to
soft sediment areas.




              Figure 21: Example backscatter mosaic along Gympie Terrace shoreline.



A more extensive analysis of the backscatter data is intended prior to further geophysical
work involving a subbottom profiler (SBP) system. The SBP data should allow identification of
sand regions in advance of a dredging program.




22                             Noosa Council - Noosa River Survey                     20.06.2019

Section 50

7.0 Summary
The 2019 swath bathymetry and backscatter survey was a success in terms of providing very
detailed information about riverbed features within the catchment and the offshore area
around the entrance to the Noosa River. The data should assist the current modelling efforts
for bank erosion, and future promotional presentations for the general Noosa public.
Although a quantitative assessment of the 2010 SBES survey and the 2019 swath bathymetry
survey wasn’t possible, the qualitative comparison between the 2010 charts and 2019
contours looks good. The 2019 contours extracted from the swath bathymetry align nicely
with the contours in the 2010 charts in test areas presumed to be free of substantial
deposition or erosion.
The backscatter data acquired with the bathymetry data should be useful for future programs
planned by the Noosa Council. A small section of the data was presented in this report but
more exists across all of the survey area. Possible uses of the data include seabed
characterisation (regional and local), identification of features within the river (e.g., debris,
rock areas, etc.), and monitoring of slips/slides along the banks of the river.
Although other techniques might be adopted for regional surveying of the river in the future
(e.g., drone-based Lidar or Satellite Derived Bathymetry) the acoustically derived data that is
a part of this survey provides a highly detailed snapshot in time of the current Noosa River
state. As such, it will be invaluable for future monitoring efforts. The detailed imagery should
also be of interest to the Noosa public and AI will continue to assist the Noosa Council in
generating products that might illustrate the work conducted here.




23                             Noosa Council - Noosa River Survey                      20.06.2019

Section 51

Noosa Spit SEMP Final Report                                           C-1
Proposed Conceptual Options (PCG 2019)




Appendix C                Proposed Conceptual Options (PCG 2019)




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx

Section 52

Noosa Spit SEMP Options
      Assessment

Noosa Spit SEMP Options
     Assessment

Section 53

1. Nourishment Options
A: Collection of sediment from the central channel is used to nourish the beach and provide a sand
slug to block the southern channel.
.




<Insert Report Title>                                                                      Page 1

Section 54

B: Collection of sand from the southern spit is undertaken using a connection to the existing Sand
Recycling System and pumped into the erosion zone.




<Insert Report Title>                                                                        Page 2

Section 55

2. River Mouth Control Structures
A: Lengthening of the existing spit groyne to increase sediment trapping and decrease sediment
bypassing into the river mouth, with a sediment pathway that is more likely to bypass the river
mouth entirely due to sediment being mobilised in deeper water.




<Insert Report Title>                                                                      Page 3

Section 56

B: New groyne on the northern side of the river mouth to prevent sand entering the river under
seasonal northerly wind and wave conditions, preventing the accumulation of sand that creates the
northern spit within the river mouth.




<Insert Report Title>                                                                     Page 4

Section 57

C: Extension of existing control structures to increase the embaymentisation of the Doggie Beach
area.




<Insert Report Title>                                                                      Page 5

Section 58

3. Local Structures
A: Extension of the submerged structure and additional small groynes along the Dog Beach as per
the proposed Stage 2 designed under the works undertaken by the Sunshine Coast Council.




<Insert Report Title>                                                                    Page 6

Section 59

B: Small groyne field to stabilise the beach front.




<Insert Report Title>                                 Page 7

“a    V4              4                             ,             ,                          '                                                                                                    N
                          if    .      “      E                                                                       .
                   bs        4 A                                                    ,                      hy             LS :                                                                                              oO
           ”           £4/                                                                   eas
           ae     ay a        y                                          .            i"
as  =    Ya ee        y  ll  J                                          as             \        “         -
ifs      ‘3 a         il    !                                               J 1           Ti      Pi      yo
                     d                                           Le     i                 (            ha 4
               AN          ee                                  FOREN                            -   he
              e4)            ny                            ——<_—                   om       ea
                A    .       aay                              =                                         7 4           ri
                           Ne                                                   re,”         ce                   7
           eg                                                                        aS)           Ye
    #4      —                                                                                        “a /
      ~_™                                             :             :                FS            ee
        >               |                          rs                                3            if ote             ;
    A                                               x sl :                         . ro)          Cs       4     |
                                                        -  *                                       >:      3            ~
       \                                             : sy                   ‘       rq             i        r     Mg
          wy |                                       ney                             =              4       \
        val                                            PAN      :                                   b          _
             f               3                                  —                                    5	1	1	1	22	5	1842	1146	8	15	0	S
5	1	1	1	22	6	1990	1150	22	20	12	*
4	1	1	1	23	0	1019	1183	728	61	-1	
5	1	1	1	23	1	1019	1206	28	27	87	a
5	1	1	1	23	2	1712	1183	35	61	30	aN
4	1	1	1	24	0	247	1241	1543	72	-1	
5	1	1	1	24	1	247	1279	32	34	60	2
5	1	1	1	24	2	1300	1241	30	28	77	d
5	1	1	1	24	3	1714	1245	76	45	32	aa
4	1	1	1	25	0	245	1292	1788	78	-1	
5	1	1	1	25	1	245	1317	35	53	67	£
5	1	1	1	25	2	370	1324	2	2	2	.
5	1	1	1	25	3	1763	1292	17	14	61	7
5	1	1	1	25	4	2030	1292	3	5	0	:
4	1	1	1	26	0	246	1346	1115	58	-1	
5	1	1	1	26	1	246	1384	33	20	37	=
5	1	1	1	26	2	1305	1346	56	53	7	aa
4	1	1	1	27	0	251	1370	1774	70	-1	
5	1	1	1	27	1	251	1392	24	48	50	Oo
5	1	1	1	27	2	768	1412	26	7	53	~
5	1	1	1	27	3	2020	1370	5	4	0	:
4	1	1	1	28	0	255	1433	707	46	-1	
5	1	1	1	28	1	255	1433	23	46	60	;
5	1	1	1	28	2	905	1441	57	18	10	ews
4	1	1	1	29	0	238	1463	876	83	-1	
5	1	1	1	29	1	238	1478	46	42	24	re}
5	1	1	1	29	2	375	1476	40	70	0	/
5	1	1	1	29	3	595	1463	40	44	22	he
5	1	1	1	29	4	689	1495	4	1	12	a
5	1	1	1	29	5	771	1495	3	3	0	.
5	1	1	1	29	6	1109	1474	5	7	0	-
4	1	1	1	30	0	255	1493	620	50	-1	
5	1	1	1	30	1	255	1521	25	22	44	o
5	1	1	1	30	2	539	1499	58	11	77	=
5	1	1	1	30	3	857	1493	18	13	0	.
4	1	1	1	31	0	246	1545	205	22	-1	
5	1	1	1	31	1	246	1547	33	20	43	2
5	1	1	1	31	2	439	1545	12	7	38	3
4	1	1	1	32	0	247	1555	1463	27	-1	
5	1	1	1	32	1	247	1571	32	11	28	—
5	1	1	1	32	2	1707	1555	3	4	0	-
4	1	1	1	33	0	255	1546	1545	127	-1	
5	1	1	1	33	1	255	1598	25	22	50	©
5	1	1	1	33	2	319	1546	128	127	7	ES
5	1	1	1	33	3	1720	1557	80	31	35	bis
4	1	1	1	34	0	246	1597	1463	55	-1	
5	1	1	1	34	1	246	1624	34	28	54	2
5	1	1	1	34	2	389	1623	3	4	0	;
5	1	1	1	34	3	927	1627	36	14	24	ag
5	1	1	1	34	4	1275	1611	25	16	81	+
5	1	1	1	34	5	1693	1597	16	14	87	d
4	1	1	1	35	0	246	1615	1435	89	-1	
5	1	1	1	35	1	246	1668	34	29	67	a
5	1	1	1	35	2	426	1660	80	44	4	eo
5	1	1	1	35	3	684	1672	24	25	25	Sy
5	1	1	1	35	4	756	1673	117	25	25	Pars,
5	1	1	1	35	5	860	1662	16	46	1	4
5	1	1	1	35	6	956	1658	19	14	0	a
5	1	1	1	35	7	997	1661	7	4	1	.
5	1	1	1	35	8	1252	1615	131	74	0	“EaN
5	1	1	1	35	9	1678	1674	3	5	0	,
4	1	1	1	36	0	481	1659	1510	120	-1	
5	1	1	1	36	1	247	1659	914	120	36	Spey
5	1	1	1	36	2	1293	1665	735	55	30	Oe
4	1	1	1	37	0	247	1720	1783	94	-1	
5	1	1	1	37	1	247	1775	33	36	90	2
5	1	1	1	37	2	659	1749	43	32	3	SK
5	1	1	1	37	3	702	1739	133	70	15	eR
5	1	1	1	37	4	1586	1720	35	30	23	aa
5	1	1	1	37	5	1729	1729	1	29	7	>
4	1	1	1	38	0	738	1772	1129	49	-1	
5	1	1	1	38	1	738	1772	58	49	9	RGD
5	1	1	1	38	2	1730	1783	93	13	38	<4:
5	1	1	1	38	3	1865	1781	2	3	0	}
4	1	1	1	39	0	246	1794	1600	90	-1	
5	1	1	1	39	1	246	1829	34	55	39	3
5	1	1	1	39	2	1317	1823	2	2	36	|
5	1	1	1	39	3	1698	1804	23	46	14	ff
4	1	1	1	40	0	245	1847	1655	63	-1	
5	1	1	1	40	1	245	1889	34	21	90	=
5	1	1	1	40	2	1714	1847	131	46	0	a
4	1	1	1	41	0	251	1879	1487	71	-1	
5	1	1	1	41	1	251	1879	18	71	0	in
5	1	1	1	41	2	1684	1897	6	5	58	fe
5	1	1	1	41	3	1712	1857	17	49	0	F
4	1	1	1	42	0	1734	1868	1611	57	-1	
5	1	1	1	42	1	1734	1872	14	53	0	=.
5	1	1	1	42	2	3326	1868	19	20	88	A
4	1	1	1	43	0	255	1879	3096	141	-1	
5	1	1	1	43	1	255	1950	34	70	55	4
5	1	1	1	43	2	542	1933	72	59	0	*
5	1	1	1	43	3	1715	1879	264	99	32	mw;
5	1	1	1	43	4	3320	1893	31	40	0	s
4	1	1	1	44	0	593	1936	2757	99	-1	
5	1	1	1	44	1	593	2000	6	35	32	|
5	1	1	1	44	2	625	2004	36	27	26	ee
5	1	1	1	44	3	797	1999	3	7	25	7
5	1	1	1	44	4	1540	1992	8	9	0	_
5	1	1	1	44	5	1944	1978	11	11	0	-
5	1	1	1	44	6	3320	1936	30	32	9	E
4	1	1	1	45	0	255	1982	3095	105	-1	
5	1	1	1	45	1	255	2021	34	40	0	D
5	1	1	1	45	2	573	2065	10	22	0	.
5	1	1	1	45	3	683	2011	154	52	11	ag.
5	1	1	1	45	4	865	2027	199	32	20	ec
5	1	1	1	45	5	1074	2026	16	9	16	SR
5	1	1	1	45	6	1225	2017	95	22	18	CE
5	1	1	1	45	7	1604	1995	30	39	17	te
5	1	1	1	45	8	1868	2000	90	23	65	—
5	1	1	1	45	9	3321	1982	29	22	0	t
4	1	1	1	46	0	246	2008	3105	84	-1	
5	1	1	1	46	1	246	2078	33	14	97	=
5	1	1	1	46	2	845	2058	84	22	52	Wd
5	1	1	1	46	3	1708	2046	1	4	0	;
5	1	1	1	46	4	3328	2008	23	21	67	9
4	1	1	1	47	0	255	2032	3103	86	-1	
5	1	1	1	47	1	255	2097	25	21	39	a
5	1	1	1	47	2	564	2091	13	26	3	,
5	1	1	1	47	3	1437	2044	32	63	25	oe
5	1	1	1	47	4	3328	2032	30	18	62	a
4	1	1	1	48	0	255	2055	3096	105	-1	
5	1	1	1	48	1	255	2101	16	59	22	Ee
5	1	1	1	48	2	547	2119	16	24	0	t
5	1	1	1	48	3	1441	2127	7	4	26	7
5	1	1	1	48	4	1477	2073	64	63	18	ge
5	1	1	1	48	5	3328	2055	23	20	32	5
4	1	1	1	49	0	245	2077	3105	123	-1	
5	1	1	1	49	1	245	2161	35	26	40	”
5	1	1	1	49	2	368	2144	16	33	0	r.
5	1	1	1	49	3	540	2153	17	47	0	.
5	1	1	1	49	4	1259	2170	30	12	0	<
5	1	1	1	49	5	1314	2124	42	50	29	eA
5	1	1	1	49	6	1393	2123	53	42	26	ae
5	1	1	1	49	7	1465	2098	52	59	38	a
5	1	1	1	49	8	1535	2125	28	27	42	vem!
5	1	1	1	49	9	1678	2123	20	30	8	a
5	1	1	1	49	10	1730	2160	27	14	0	™
5	1	1	1	49	11	1859	2145	30	20	0	“
5	1	1	1	49	12	3320	2077	30	63	14	c
4	1	1	1	50	0	246	2145	3105	104	-1	
5	1	1	1	50	1	246	2218	33	25	46	a
5	1	1	1	50	2	439	2195	41	54	0	~~
5	1	1	1	50	3	1151	2212	3	2	9	Mah
5	1	1	1	50	4	1185	2185	63	30	0	onid
5	1	1	1	50	5	1330	2184	73	28	30	gay
5	1	1	1	50	6	1406	2177	40	52	43	ed
5	1	1	1	50	7	1458	2207	6	8	43	a
5	1	1	1	50	8	1615	2170	54	53	17	ee
5	1	1	1	50	9	1759	2174	2	2	31	es
5	1	1	1	50	10	1860	2183	19	7	13	aa
5	1	1	1	50	11	3328	2145	23	20	56	2
4	1	1	1	51	0	1115	2164	2226	76	-1	
5	1	1	1	51	1	1115	2236	12	4	0	.
5	1	1	1	51	2	1362	2222	3	3	33	:
5	1	1	1	51	3	1538	2200	149	38	16	lL
5	1	1	1	51	4	1823	2214	27	24	0	e
5	1	1	1	51	5	3325	2164	16	58	16	2g
4	1	1	1	52	0	3325	2224	20	20	-1	
5	1	1	1	52	1	3325	2224	20	20	62	V

Section 60

C: Terminal wall along Dog Beach.




<Insert Report Title>               Page 8

A                                                                                                          Shad                                > ee                   4                   oH
                                                                                                                                                                        j                  O
2                                                                                                  i                    aes            + ————,               Si  eee      ,                3
                                                                                                                                        a                 es    Fi                         Oo
m=                                                                            a     » /                                                                              a,                    5
g                                                                             Aaya        =”                                                                             .                 3
 =                                                                                            se                                    Fs          RG      ns                                 5
 oO                                                                                     —                                          a                 Gy Px        4
                                                                           meee:                                                KES                            ee
                                                                                i     ae    » i 4   &:          y                        ‘       cy nS x, ej t=             > oo
                                                                          \ be   bi            ; “             e NG            A  |         ms”       Lies    ,                Sy          Q
                                                                                               il                                                                                sy        ©
                                                                                         ee                                                                                                o
                                                                                                                                                     >    rs            ee        F        g
                                                                                                                                               -s.     -          ee   ir  P
                                                                            ’             aan                    ‘                                                                  '
                                                                           =                                         |  a
                                                                                          mS                                             %
                                                                                             ,                              Ba,"                                         s
                                                                           ad         %      +                                     Nae                                     oy  4
                                                                                      ei       \                                    ir
                                                                                      ‘        A                                      ay                    ,                    \
                                                                                                                                                                          ©
                                                                                                4                                      Ww.                                 3   =
                                                                              Se                               ah                   &                                          a
                                                                                    -     h    ma                                        _—o                      |         ~       ‘e"
                                                                                 A           P i                                       y                                 o     ~™. ”
                                                                                         et Pes   ‘         a                                                           —          *
                                                                                         ¢     ~a           =       .      .                                        rs              ae
                                                                                        Pe ba              Fa            a                                    = ,
                                                                                               <a                                 hI                          ‘
                                                                             .            tA ae             wT                                               ;        SS
                                                                                    IR. itis:                                  _                           ee
                                                                                :         ry   it                              a                            Kg      SA
                                                                                  ,        ee         »                      f                                     A
                                                                                         4                              rr.                                       ,,
                                                                                    f    - f   :        .’           aie                                          a       P         &
                                                                                          :       =      A            tA                                    A  oa t       Pe
                                                                                                                     }                                              Fe    peal 2
                                                                                              *       fi   |                                    7              if   re
                                                                                         ,        |                            ?                         Ce       ae
                                                                           a                                                                          vat
 U                                                                          4                                    cs                         :,       yd       a4
o                                                                              ;                      .                                             y          F;
a                                                                                                                                                   ;     ee
.                                                                             s                                                                         “

Section 61

Noosa Spit SEMP Final Report                                           D-1
Risk Assessment




Appendix D                Risk Assessment




G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx

Section 62

                                                  Current State (Base Case)                                                                          OPTION 1a: Beach Nourishment: Dual plug and shoreline nourishment.                                            OPTION 1b: Beach Nourishment: Single plug and shoreline nourishment.                                          OPTION 2: Extension of Existing Training Wall                                                               OPTION 3: Extension of Existing Submerged Breakwater                                                  OPTION 4: Groyne Field                                                                                          OPTION 5: Seawall along Beach                                                                                       OPTION 6: Do Nothing (Accept Impacts)
            Risk Categories & Management                                                                                    Risk Assessment                                                                                                Risk Assessment                                                                                               Risk Assessment                                                                                            Risk Assessment                                                                                        Risk Assessment                                                                                               Risk Assessment                                                                                                      Risk Assessment                                                                                              Risk Assessment
                                                  Risk Description/Treatment                                                                         Risk Description/Treatment                                                                                    Risk Description/Treatment                                                                                    Risk Description/Treatment                                                                                  Risk Description/Treatment                                                                            Risk Description/Treatment                                                                                      Risk Description/Treatment                                                                                          Risk Description/Treatment

                                                  Unstable river bank and falling trees could cause           Consequence           Medium           Nil                                                                           Consequence     Insignificant   Nil                                                                           Consequence     Insignificant   Slip Hazard on structure resulting in injury. Introduction of a            Consequence     Major            Submerged structure presents navigation hazard and may be struck Consequence          Major           Slip Hazard on structure resulting in injury. Introduction of a submerged   Consequence         Major           Trip/slip hazard when exposed. Potentail climbing/play structure that could Consequence             Medium          Unstable river bank and falling trees could cause injury to staff Consequence              Medium
                                                  injury to staff and public. This may result in an           Likelihood            Possible                                                                                       Likelihood      Rare                                                                                          Likelihood      Rare            submerged hazard may result in injuries when diving, swimming or           Likelihood      Possible         by boat, causing serious injury. This may result in an increase in Likelihood         Possible        hazard may result in injuries when diving, swimming or boating near         Likelihood          Possible        lead to injuries.                                                           Likelihood              Possible        and public. This may result in an increase in insurance claims for Likelihood              Possible
                                           RISK   increase in insurance claims for accidents.                                                                                                                                                                                                                                                                                    boating near them. This may result in an increase in insurance claims                                       insurance claims for accidents.                                                                       them. This may result in an increase in insurance claims for accidents.                                                                                                                                                             accidents.
                                                                                                              Risk Rating           Medium (M52)                                                                                   Risk Rating     Low (L4)                                                                                      Risk Rating     Low (L4)        for accidents.                                                             Risk Rating     High (H72)                                                                          Risk Rating        High (H72)                                                                                  Risk Rating         High (H72)                                                                                    Risk Rating           Medium (M52)                                                                       Risk Rating             Medium (M52)
     Workplace & Public Safety                    Exclusion of public from affected area using fencing,       Consequence           Medium           N/A                                                                           Consequence     Insignificant   N/A                                                                           Consequence     Insignificant   Adequate signage/navigation aids of submerged hazards. Ensure              Consequence     Medium           Adequate signage/navigation aids of submerged hazards. Council to Consequence         Medium          Adequate signage/navigation aids of submerged hazards. Council to hold      Consequence         Medium          Exclusion of public from area when it is exposed using appropriate barriers   Consequence           Medium          Exclusion of public from affected area using fencing, barriers  Consequence                Medium
                                                  barriers and signage. Council to hold appropriate           Likelihood            Unlikley                                                                                       Likelihood      Rare                                                                                          Likelihood      Rare            central channel is used for boat traffic.Council to hold appropriate       Likelihood      Unlikley         hold appropriate insurance coverage for liability and accidents.  Likelihood          Unlikley        appropriate insurance coverage for liability and accidents.                 Likelihood          Unlikley        and signage. Council to hold appropriate insurance coverage for liability     Likelihood            Unlikley        and signage. Council to hold appropriate insurance coverage for Likelihood                 Unlikley
                                      TREATMENT   insurance coverage for liability and accidents.                                                                                                                                                                                                                                                                                insurance coverage for liability and accidents.                                                                                                                                                                                                                                                                                   and accidents.                                                                                                      liability and accidents.
                                                                                                              Residual                                                                                                             Residual                                                                                                      Residual                                                                                                   Residual                                                                                               Residual                                                                                                    Residual                                                                                                          Residual                                                                                              Residual
                                                                                                                                    Medium (M48)                                                                                                   Low (L4)                                                                                                      Low (L4)                                                                                                   Medium (M48)                                                                                           Medium (M48)                                                                                                    Medium (M48)                                                                                                        Medium (M48)                                                                                               Medium (M48)
                                                                                                              Risk Rating                                                                                                          Risk Rating                                                                                                   Risk Rating                                                                                                Risk Rating                                                                                            Risk Rating                                                                                                 Risk Rating                                                                                                       Risk Rating                                                                                           Risk Rating

                                                  Public perception of mismanagment if no action is           Consequence           Medium           Compliants about noisy machinery and the physical appearance of the           Consequence     Insignificant   Complaints about noisy machinery and the physical appearance of the           Consequence     Insignificant   Intial complaints driven by change to navigation of river. Perception of   Consequence     Insignificant    Complaints about delivering a project that is expected not to work    Consequence     Medium          Intial complaints driven by loss of visual amenity.                         Consequence         Low             Perception of "over management" or "too much money being spent" during Consequence                  Low             Public perception of mismanagment if no action is taken to            Consequence          Medium
                                                  taken to prevent breakthrough or repair erosion;            Likelihood            Likely           machinery on the beach, in excess of positive feedback.                       Likelihood      Unlikely        machinery on the beach, in excess of positive feedback.                       Likelihood      Unlikely        "over management".                                                         Likelihood      Likely           well.                                                                 Likelihood      Likely                                                                                      Likelihood          Possible        construction. Public perception that seawall is visually unaesthetic.  Likelihood                   Likely          prevent breakthrough or repair erosion; potential ncrease in          Likelihood           Likely
                                           RISK
                                                  potential increase in complaints to Council and the                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  complaints to Council and the media.
                                                                                                              Risk Rating           High (H56)                                                                                     Risk Rating     Low (L8)                                                                                      Risk Rating     Low (L8)                                                                                   Risk Rating     Low (L16)                                                                              Risk Rating     High (H56)                                                                                  Risk Rating         Medium (M32)                                                                                  Risk Rating           Medium (M36)                                                                          Risk Rating          High (H56)
                                                  media.
           Reputational
                                                  Undertake SEMP; provide strong messaging and                Consequence           Low              Strong media messaging around the project, the tools to be deployed and       Consequence     Insignificant   Strong media messaging around the project, the tools to be deployed and       Consequence     Insignificant   Strong media messaging around the decision, upfront messaging about Consequence            Insignificant    Targetted messaging to align some of the expectations.                Consequence     Medium          Strong media messaging about visual aspect of solution during project       Consequence         Low             Strong media messaging around the decision, upfront messaging about           Consequence           Low             Strong media messaging around the decision and cost/benefits Consequence                   Medium
                                                  communications of SEMP outcomes by Council                  Likelihood            Possible         what this solution provides and avoids. Public consultation to reduce         Likelihood      Rare            what this solution provides and avoids. Public consultation to reduce         Likelihood      Rare            visual aspects during project development, long term spreading of          Likelihood      Unlikley                                                                               Likelihood      Possible        development. Conduct public consultation, where appropriate.                Likelihood          Unlikley        visual aspects during project development, long term spreading of costs.      Likelihood            Unlikley        by Council leaders; ; include public consultation, where     Likelihood                    Possible
                                      TREATMENT
                                                  leaders; include public consultation, where                 Residual                               complaints.                                                                   Residual                        complaints.                                                                   Residual                        costs. Conduct public consultation, where appropriate.                     Residual                                                                                               Residual                                                                                                    Residual                            Seawall to be buried.                                                          Residual                             appropriate.                                                 Residual
                                                  appropriate.                                                                      Medium (M32)                                                                                                   Low (L4)                                                                                                      Low (L4)                                                                                                   Low (L8)                                                                                               Medium (M52)                                                                                                    Low (L24)                                                                                                           Low (L24)                                                                                                  Medium (M52)
                                                                                                              Risk Rating                                                                                                          Risk Rating                                                                                                   Risk Rating                                                                                                Risk Rating                                                                                            Risk Rating                                                                                                 Risk Rating                                                                                                        Risk Rating                                                                                       Risk Rating
                                                  Political stakeholder intervention from local and/or        Consequence           Major            Political stakeholder intervention due to the solution requiring expense of   Consequence     Medium          Political stakeholder intervention due to the solution requiring expense of   Consequence     Medium          Political stakeholder intervention due to the solution requiring expense Consequence       Medium           Political stakeholder intervention due to the implementation of a     Consequence     Major           Political stakeholder intervention due to the solution requiring expense of Consequence         Medium          Political stakeholder intervention due to the solution taking a infrastructure Consequence          Medium          Political stakeholder intervention from local and/or state   Consequence                   Major
                                                  state government due to breakthrough impacting              Likelihood            Likely           public funds for protection of limited area. Individual views on visual or    Likelihood      Possible        public funds for protection of limited area. Individual views on visual or    Likelihood      Possible        of public funds for protection of limited area. Individual views on visual Likelihood      Possible         'legacy' design from Sunshine Coast Regional Council that has been    Likelihood      Likely          public funds for protection of limited area. Individual views on visual or  Likelihood          Possible        "heavy" direction, large expense of public funds for protection of limited     Likelihood           Likely          government levels due to breakthrough impacting Noosa Sound Likelihood                     Likely
                                           RISK   Noosa Sound properties and boat moorings and due                                                   environmental impacts may not align with the option.                                                          environmental impacts may not align with the option.                                                          or environmental impacts may not align with the option.                                                     shown to be ineffective and expensive.                                                                environmental impacts may not align with the option.                                                            area.                                                                                                               properties and boat moorings and due to loss of recreational
                                                  to loss of recreational amenity.                            Risk Rating           Extreme (E84)                                                                                  Risk Rating     Medium (M52)                                                                                  Risk Rating     Medium (M52)                                                                               Risk Rating     Medium (M52)                                                                           Risk Rating     Extreme (E84)                                                                               Risk Rating         Medium (M52)                                                                                   Risk Rating          High (H56)      amenity.                                                     Risk Rating                   Extreme (E84)

             Political                            Strong stakeholder involvement during the planning          Consequence           Medium           Seek supporting 'natural' secondary solution that could alleviate short term Consequence      Insignificant   Strong stakeholder involvement with the decision making process. Seek         Consequence     Low             Strong stakeholder involvement with the decision making process. Seek Consequence          Low              Nil                                                                   Consequence     Major           Strong stakeholder involvement with the decision making process. Seek       Consequence         Low             Strong stakeholder involvement with the decision making process. The long Consequence               Medium          Strong stakeholder involvement with the decision making               Consequence          Major
                                                  and decision making process.                                Likelihood            Possible         concerns and increase overall benefits.                                      Likelihood       Unlikley        public feedback about dredge campaigns.                                       Likelihood      Possible        public feedback about extension of existing structure.                Likelihood           Possible                                                                               Likelihood      Likely          public feedback about similar structures at Munna Point and                 Likelihood          Possible        term benefits, seeking of public funds, spreading of costs.               Likelihood                Possible        process.                                                              Likelihood           Possible
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                   Maroochydore.
                                      TREATMENT
                                                                                                              Residual                                                                                                             Residual                                                                                                      Residual                                                                                                   Residual                                                                                               Residual                                                                                                    Residual                                                                                                          Residual                                                                                                    Residual
                                                                                                                                    Medium (M52)                                                                                                   Low (L8)                                                                                                      Medium (M32)                                                                                               Medium (M32)                                                                                           Extreme (E84)                                                                                                   Medium (M32)                                                                                                        Medium (M52)                                                                                               High (H72)
                                                                                                              Risk Rating                                                                                                          Risk Rating                                                                                                   Risk Rating                                                                                                Risk Rating                                                                                            Risk Rating                                                                                                 Risk Rating                                                                                                       Risk Rating                                                                                                 Risk Rating

                                                  Litigation from property owners in Noosa Sound due Consequence                    Extreme          Difficulty in obtaining regulatory approvals, particularly from the           Consequence     Low             Difficulty in obtaining regulatory approvals, particularly from the Department Consequence    Low             Nil                                                                        Consequence     Insignificant    Boats damaged by impacting submerged structure may seek               Consequence     Low             Nil                                                                         Consequence         Insignificant   Difficulty in obtaining regulatory approvals for a large structure in the     Consequence           Medium          Litigation from property owners in Noosa Sound due to reduced Consequence                  Extreme
                                                  to reduced protection from hazards causing damage Likelihood                      Possible         Department of Fisheries given ongoing nature of project and possible          Likelihood      Possible        of Fisheries given ongoing nature of project and possible disruption to        Likelihood     Possible                                                                                   Likelihood      Rare             recourse. Potential increase in insurance cases and legal disputes.   Likelihood      Unlikely                                                                                    Likelihood          Rare            coastal zone.                                                                 Likelihood            Possible        protection from hazards causing damage to properties.         Likelihood                   Possible
                                                  to properties.                                                                                     disruption to adjacent fish habitat zone.                                                                     adjacent fish habitat zone.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         Implementation of a strategy that is not consistent with the
                                                  Implementation of a strategy that is not consistent                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  State Coastal Management Plan (2016) could present
                                           RISK
                                                  with the State Coastal Management Plan (2016) could                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  legal/regulatory issues and non-approval from the State.
                                                                                                        Risk Rating                 Extreme (E82)                                                                                  Risk Rating     Medium (M32)                                                                                  Risk Rating     Medium (M32)                                                                               Risk Rating     Low (L4)                                                                               Risk Rating     Low (L24)                                                                                   Risk Rating         Low (L4)                                                                                      Risk Rating           Medium (M52)                                                                  Risk Rating                  Extreme (E82)
                                                  present legal/regulatory issues and non-approval from
                                                  the State.

  Legal, Governance & Regulatory                  Collaborate with relevant stakeholder at government         Consequence           Low              Strong stakeholder engagement with regulatory bodies to assist in defining    Consequence     Insignificant   Strong stakeholder engagement with regulatory bodies to assist in defining    Consequence     Insignificant   N/A                                                                        Consequence     Insignificant    Adequate signage/navigation aids of submerged hazards. Council to Consequence         Low             N/A                                                                         Consequence         Insignificant   Strong stakeholder involvement with the planning and decision making          Consequence           Insignificant   Reduce risk of litigation by making residents aware of risks as Consequence                Low
                                                  and industry level to ensure regulatory compliance;         Likelihood            Unlikley         the detailed design. Strong long-term, multi criteria assessment. Strong      Likelihood      Rare            the detailed design. Strong long-term, multi criteria assessment. Strong      Likelihood      Rare                                                                                       Likelihood      Rare             hold appropriate insurance and seek legal advice where needed.    Likelihood          Unlikley                                                                                    Likelihood          Rare            process. This could include presenting, preparing reports/findings and        Likelihood            Rare            per advice from King and Co. (lawyers); Implementation of this Likelihood                  Unlikley
                                                  Undertake SEMP and provide strong messaging of its                                                 compliance reporting to assure stakeholders that habitat zones will not be                                    compliance reporting to assure stakeholders that habitat zones will not be                                                                                                                                                Council to seek legal representation for any disputes.                                                                                                                                                                collaborating with State Government to get regulatory approval.                                                     strategy is still against regulatory guidance; Collaborate with
                                                  outcomes to key stakeholder groups, including                                                      maintained.                                                                                                   maintained.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                         relevant stakeholder at government and industry level to ensure
                                      TREATMENT   government and affected industry groups; Seek legal                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                  regulatory compliance;
                                                                                                              Residual                                                                                                             Residual                                                                                                      Residual                                                                                                   Residual                                                                                               Residual                                                                                                    Residual                                                                                                          Residual                                                                                              Residual
                                                  advice, where appropriate to ensure compliance with                               Low (L24)                                                                                                      Low (L4)                                                                                                      Low (L4)                                                                                                   Low (L4)                                                                                               Low (L24)                                                                                                       Low (L4)                                                                                                            Low (L4)                                                                                                   Low (L24)
                                                                                                              Risk Rating                                                                                                          Risk Rating                                                                                                   Risk Rating                                                                                                Risk Rating                                                                                            Risk Rating                                                                                                 Risk Rating                                                                                                       Risk Rating                                                                                           Risk Rating
                                                  regulatory and legislative requirements.


                                                  Loss of use of the area to reducing numbers of person Consequence                                  Disruption to recreational area leads to temporary loss in tourist trade.     Consequence                     Disruption to recreational area leads to temporary loss in tourist trade.     Consequence                     Disruption to recreational area leads to temporary loss in tourist trade. Consequence                       Disruption to recreational area leads to temporary loss in tourist    Consequence                     Disruption to recreational area leads to temporary loss in tourist trade.   Consequence                         Disruption to recreational area leads to temporary loss in tourist trade.     Consequence                           Loss of value to Noosa Sound properties due to reduced hazard Consequence
                                                                                                                                    Low                                                                                                            Insignificant                                                                                                 Insignificant                                                                                              Insignificant                                                                                          Insignificant                                                                                                   Insignificant                                                                                                       Insignificant                                                                                              Medium
                                                  present in the local economy resulting in loss of                                                                                                                                                                                                                                                                                                                                                                                          trade.                                                                                                                                                                                                                                                                                                                                    protection/increased boat traffic adjacent to properties.
                                                  potential tourism trade.                              Likelihood                  Likley                                                                                         Likelihood      Possible                                                                                      Likelihood      Possible                                                                                   Likelihood      Possible                                                                               Likelihood      Possible                                                                                    Likelihood          Possible                                                                                      Likelihood            Possible        Reduced recreational amenity of the Spit may lead to a drop in Likelihood                  Possible
                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                       user numbers resulting in less tourist trade.

                                           RISK
                                                                                                              Risk Rating           Medium (M36)                                                                                   Risk Rating     Low (12)                                                                                      Risk Rating     Low (12)                                                                                   Risk Rating     Low (12)                                                                               Risk Rating     Low (12)                                                                                    Risk Rating         Low (12)                                                                                      Risk Rating           Low (12)                                                                              Risk Rating          Medium (M52)
            Economic



                                                  Nil                                                         Consequence           Low              Stong media messaging about construction of project and disruptions.          Consequence     Insignificant   Stong media messaging about construction of project and disruptions.          Consequence     Insignificant   Stong media messaging about construction of project and disruptions. Consequence           Insignificant    Stong media messaging about construction of project and               Consequence     Insignificant   Stong media messaging about construction of project and disruptions.        Consequence         Insignificant   Stong media messaging about construction of project and disruptions.          Consequence           Insignificant   Stong media messaging and economic support to relocate                Consequence          Low
                                                                                                              Likelihood            Likley                                                                                         Likelihood      Rare                                                                                          Likelihood      Rare                                                                                 Likelihood            Rare             disruptions.                                                          Likelihood      Rare                                                                                        Likelihood          Rare                                                                                          Likelihood            Rare            users of Noosa Spit to other local regions.                           Likelihood           Unlikley
                                      TREATMENT
                                                                                                              Residual                                                                                                             Residual                                                                                                      Residual                                                                                                   Residual                                                                                               Residual                                                                                                    Residual                                                                                                          Residual                                                                                                    Residual
                                                                                                                                    Medium (M36)                                                                                                   Low (L4)                                                                                                      Low (L4)                                                                                                   Low (L4)                                                                                               Low (L4)                                                                                                        Low (L4)                                                                                                            Low (L4)                                                                                                   Low (L24)
                                                                                                              Risk Rating                                                                                                          Risk Rating                                                                                                   Risk Rating                                                                                                Risk Rating                                                                                            Risk Rating                                                                                                 Risk Rating                                                                                                       Risk Rating                                                                                                 Risk Rating
                                                  Cost of mitigation is likely to increase substantially in   Consequence           Major            Budget estimates undervalue project, resulting in medium financial loss       Consequence     Low             Budget estimates undervalue project, resulting in medium financial loss       Consequence     Low             Budget estimates undervalue project, resulting in medium financial loss Consequence        Low              Budget estimates undervalue project, resulting in medium financial    Consequence     Low             Budget estimates undervalue project, resulting in medium financial loss.    Consequence         Low             High up-front capital costs, complex construction in a difficult enviornment Consequence            Medium          Cost of mitigation is likely to increase substantially in the event   Consequence          Major
                                                  the event of breakthrough event.                            Likelihood            Almost Certain                                                                                 Likelihood      Unlikely                                                                                      Likelihood      Unlikely                                                                                Likelihood         Possible         loss                                                                  Likelihood      Possible                                                                                    Likelihood          Possible        leads to financial variation risk.                                           Likelihood             Possible        of breakthrough event.                                                Likelihood           Almost Certain
                                           RISK
                                                                                                              Risk Rating           Extreme (E88)                                                                                  Risk Rating     Low (L24)                                                                                     Risk Rating     Low (L24)                                                                                  Risk Rating     Medium (M32)                                                                           Risk Rating     Medium (M32)                                                                                Risk Rating         Medium (M32)                                                                                  Risk Rating           Medium (M52)                                                                          Risk Rating          Extreme (E88)
             Financial
                                                  Implement SEMP; ensure strong project                       Consequence           Medium           Early tenderer engagement to refine scope and costs. Strong                   Consequence     Low             Early tenderer engagement to refine scope and costs.Strong communication Consequence          Low             Early tenderer engagement to refine scope and costs.Strong                 Consequence     Low              Early tenderer engagement to refine scope and costs. Strong           Consequence     Low             Early tenderer engagement to refine scope and costs. Strong             Consequence             Low             Early tenderer engagement to refine scope and costs. Strong                   Consequence           Low             Have a Council budget allocated to in the event of a                  Consequence          Medium
                                                  management pirnciples are applied in order to               Likelihood            Possible         communication and partnering with the right supplier to ensure time and       Likelihood      Unlikley        and partnering with the right supplier to ensure time and costs are managed Likelihood        Unlikley        communication and partnering with the right supplier to ensure time        Likelihood      Unlikley         communication and partnering with the right supplier to ensure        Likelihood      Unlikley        communication and partnering with the right supplier to ensure time and Likelihood              Unlikley        communication and partnering with the right supplier to ensure time and       Likelihood            Unlikley        breakthrough. Apply strong project management skills to               Likelihood           Almost Certain
                                      TREATMENT   appropriately manage the project costs.                                                            costs are managed appropriated.                                                                               appropriated.                                                                                                 and costs are managed appropriated.                                                                         time and costs are managed appropriated.                                                              costs are managed appropriated.                                                                                 costs are managed appropriated.                                                                                     manage budget allocation.
                                                                                                              Residual                                                                                                             Residual                                                                                                    Residual                                                                                                     Residual                                                                                               Residual                                                                                                Residual                                                                                                              Residual                                                                                                    Residual
                                                                                                                                    Medium (M52)                                                                                                   Low (L24)                                                                                                     Low (L24)                                                                                                  Low (L24)                                                                                              Low (L24)                                                                                                       Low (L24)                                                                                                           Low (L24)                                                                                                  High (H60)
                                                                                                              Risk Rating                                                                                                          Risk Rating                                                                                                 Risk Rating                                                                                                  Risk Rating                                                                                            Risk Rating                                                                                             Risk Rating                                                                                                           Risk Rating                                                                                                 Risk Rating
                                                  Significant, permenant loss of terrestrial vegetation       Consequence           Medium           Ongoing nourishment project will cause continual short term impacts on        Consequence     Low             Ongoing nourishment project will cause continual short term impacts on       Consequence      Medium          Limited short term disruption to local environmental values, limited       Consequence     Low              Limited short term disruption to local environmental values, limited Consequence      Low             Limited short term disruption to local environmental values, limited long   Consequence         Low             Significant, short term disruption to local environmental values, but long    Consequence           Medium          Significant, permanent loss of terrestrial vegetation and             Consequence          Medium
                                                  and wetlands, ongoing and unmitigated erosion will          Likelihood            Almost Certain   local environmnetal values. Dredge extraction areas can be targeted to        Likelihood      Possible        local environmental values. Dredge extraction areas can be targeted to avoid Likelihood       Possilbe        long term stabilisation of habitat. Nourishment after constrcution         Likelihood      Almost Certain   long term stabilisation of habitat. Nourishment after constrcution Likelihood         Likely          term stabilisation of habitat. Nourishment after constrcution likely to     Likelihood          Likely          term stabilisation of habitat. Nourishment after constrcution likely to casue Likelihood            Likely          wetlands, ongoing and unmitigated erosion will cause loss of          Likelihood           Almost Certain
                                                  cause loss of habitat. Future mitiagtion options likely                                            avoid environmnetally sensitive areas. Greater spacing between                                                environmentally sensitive areas.                                                                              likely to casue localised disruption ot environmental values.                                               likely to casue localised disruption ot environmental values.                                         casue localised disruption ot environmental values.                                                             localised disruption to environmental values.                                                                       habitat. Future mitiagtion options likely to be more extensive
                                                  to be more extensive and cause greater                                                             nourishment allows some reduction in impact.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                      and cause greater environmental harm.
                                           RISK
                                                  environmental harm.
                                                                                                              Risk Rating           High (H60)                                                                                     Risk Rating     Medium (M32)                                                                                  Risk Rating     High (H60)                                                                                 Risk Rating     Medium (M40)                                                                           Risk Rating     Medium (M36)                                                                                Risk Rating         Medium (M36)                                                                                  Risk Rating           High (H56)                                                                            Risk Rating          High (H60)
          Environmental


                                                  Implement SEMP to reduce environmental harm and             Consequence           Medium           Nourishment footprint to be carefully selected and programed to avoid         Consequence     Low             Nourishment footprint to be carefully selected and programed to avoid most Consequence        Low             Design of structures to incorporate fih habitat zone. Stabilisation of     Consequence     Low              Design of structures to incorporate fih habitat zone. Stabilisation of Consequence    Insignificant   Design of structures to incorporate fish habitat zone. Stabilisation of river Consequence       Insignificant   Design detailing to incoporate habitat reestablishment and stabilise existing Consequence           Low             Nil                                                                   Consequence          Medium
                                                  damage.                                                     Likelihood            Possible         most disruptive times and locations. Careful multi-criteria monitoring to     Likelihood      Unlikley        disruptive times and locations. Careful multi-criteria monitoring to assess Likelihood        Possilbe        river bank will prevent further loss. Nourishment footprint to be          Likelihood      Unlikley         river bank will prevent further loss. Nourishment footprint to be      Likelihood     Unlikley        bank will prevent further loss. Nourishment footprint to be carefully         Likelihood        Unlikley        habitat. Nourishment footprint to be carefully selected and programed to Likelihood                 Unlikley                                                                              Likelihood           Almost Certain
                                      TREATMENT
                                                                                                              Residual                               assess and adapt to impacts.                                                  Residual                        and adapt to impacts.                                                       Residual                          carefully selected and programed to avoid most disruptive times and        Residual                         carefully selected and programed to avoid most disruptive times and Residual                          selected and programed to avoid most disruptive times and locations.          Residual                          avoid most disruptive times and locations.                                    Residual                                                                                                    Residual
                                                                                                                                    Medium (M52)                                                                                                   Low (L24)                                                                                                     Medium (M32)                                                                                               Low (L24)                                                                                              Low (L8)                                                                                                        Low (L8)                                                                                                            Low (L24)                                                                                                  High (H60)
                                                                                                              Risk Rating                                                                                                          Risk Rating                                                                                                 Risk Rating                       locations.                                                                 Risk Rating                      locations.                                                             Risk Rating                                                                                                  Risk Rating                                                                                                     Risk Rating                                                                                                 Risk Rating

Residual Risk Average                                                                                                               Medium (M43)     Residual Risk Average                                                                         Low (13)        Residual Risk Average                                                                         Low (18)        Residual Risk Average                                                                      Low (L21)        Residual Risk Average                                                                 Medium (35)     Residual Risk Average                                                                           Low (L21)       Residual Risk Average                                                                               Low (L25)       Residual Risk Average                                                                      Medium (M49)


Highest Residual Risk in Option                                                                                                     Medium (M52)     Highest Residual Risk in Option                                                               Low (L24)       Highest Residual Risk in Option                                                               Medium (M32)    Highest Residual Risk in Option                                                            Medium (M48)     Highest Residual Risk in Option                                                       Extreme (E84)   Highest Residual Risk in Option                                                                 Medium (M48)    Highest Residual Risk in Option                                                                     Medium (M52)    Highest Residual Risk in Option                                                            High (H60)


Legend:

Section 63

BMT has a proven record in addressing today’s engineering and
environmental issues.
Our dedication to developing innovative approaches and solutions
enhances our ability to meet our client’s most challenging needs.




  1




                            BMT in Environment               Other BMT offices


Brisbane                                  Northern Rivers                                  Leeds
Level 8, 200 Creek Street                 Suite 5                                          Platform
Brisbane Queensland 4000                  20 Byron Street                                  New Station Street
PO Box 203 Spring Hill Queensland 4004    Bangalow New South Wales 2479                    Leeds, LS1 4JB
Australia                                 Australia                                        UK
Tel +61 7 3831 6744                       Tel +61 2 6687 0466                              Tel: +44 (0) 113 328 2366
Fax +61 7 3832 3627                       Fax +61 2 6687 0422                              Email [email protected]
Email [email protected]              Email [email protected]
                                                                                           Aberdeen
Melbourne                                 Sydney                                           11 Bon Accord Crescent
Level 5, 99 King Street                   Suite G2, 13-15 Smail Street                     Aberdeen, AB11 6DE
Melbourne Victoria 3000                   Ultimo Sydney New South Wales 2007               UK
Australia                                 Australia                                        Tel: +44 (0) 1224 414 200
Tel +61 3 8620 6100                       Tel +61 2 8960 7755                              Email [email protected]
Fax +61 3 8620 6105                       Fax +61 2 8960 7745
Email [email protected]             Email [email protected]                       Asia Pacific
                                                                                           Indonesia Office
Newcastle                                 Perth                                            Perkantoran Hijau Arkadia
126 Belford Street                        Level 4                                          Tower C, P Floor
Broadmeadow New South Wales 2292          20 Parkland Road                                 Jl: T.B. Simatupang Kav.88
PO Box 266 Broadmeadow                    Osborne Park Western Australia 6017              Jakarta, 12520
New South Wales 2292                      PO Box 2305 Churchlands Western Australia 6018   Indonesia
Australia                                 Australia                                        Tel: +62 21 782 7639
Tel +61 2 4940 8882                       Tel +61 8 6163 4900                              Email [email protected]
Fax +61 2 4940 8887                       Email [email protected]
Email [email protected]                                                              Alexandria
                                          London                                           4401 Ford Avenue, Suite 1000
Adelaide                                  Zig Zag Building, 70 Victoria Street             Alexandria, VA 22302
5 Hackney Road                            Westminster                                      USA
Hackney Adelaide South Australia 5069     London, SW1E 6SQ                                 Tel: +1 703 920 7070
Australia                                 UK                                               Email [email protected]
Tel +61 8 8614 3400                       Tel +44 (0) 20 8090 1566
Email [email protected]                   Email [email protected]


                                                                                                                             www.bmt.org

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.