Original source · versioned page text
2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnNoosa Spit SEMP Final Report 103
References
6 References
Barnes, M.P., Visser, J. and Fisk, G. (2017). Implementation of Trigger-Based Coastal Management
Strategies, Coasts & Ports 2017 Conference.
Collins (1972). Prediction of shallow-water spectra, Journal of Geophysical Research, Volume 7,
Issue 15, Oceans and Atmosphere, 2693 – 2707.
Geoscience Australia (2017). High-resolution depth model for the Great Barrier Reef, Beaman R.J.
Fisk, G. & Kay, R. (2010). Dealing with uncertainty in climate change adaptation planning and
developing triggers for future action, Practical Responses to Climate Change Conference 2010,
Melbourne, September 2010.
Commonwealth Government (2015). EPBC Act Policy Statement 3.21 – Industry guidelines for
avoiding, assessing and mitigating impacts on EPBC Act listed migratory shorebird species.
Commonwealth Department of the Environment, Canberra, Australia.
ICM (2010a). Option Review Noosa River Spit, prepared for Sunshine Coast Regional Council.
ICM (2010b). Noosa River Spit Erosion Protection Works Drawing Register, 23 November 2010,
prepared for Sunshine Coast Regional Council.
MSQ (2019). Queensland Tide Tables 2017. Maritime Safety Queensland.
O’Brien, M. P. (1969) Equilibrium Flow Areas in Inlets on Sandy Coasts. Journal of the Waterways
and Harbours Division. ASCE No. WW1, pp.43-52.
Queensland Government (2012). Queensland coastal risk and bathymetric LiDAR: a pilot study for
collecting near-shore bathymetry. Queensland Department of Science, Information Technology,
Innovation and the Arts, Brisbane, Australia.
Saha, S., and Coauthors (2010). The NCEP Climate Forecast System Reanalysis. Bull. Amer.
Meteor. Soc., 91, 1015-1057.
Saha, S., and Coauthors (2014). The NCEP Climate Forecast System Version 2. J. of Climate, 27(6),
2185-2208.
Tomlinson and Chamberlain (2006). Noosa River Entrance Channel Dynamics, Griffith University,
CRC for Coastal Zone, Estuary and Waterway Management, 1 – 75.
van Rijn, L.C., D.J.R. Walstra and M. van Ormondt (2004). Description of TRANSPOR2004 and
Implementation in Delft3D-ONLINE. Z3748.10 – report prepared by Delft Hydraulics for DG
Rijkswaterstaat.
WMA Water (2017). Noosa River Flood Study Upgrade, prepared for Noosa Shire Council, March
2017.
WRL (2014). Riverbank Vulnerability Assessment using a Decision Support System: Clarence River
(Rogans Bridge to Ulmarra), WRL Technical Report 2014/12 December 2014.
G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\R.B23636.001.02.SEMP_final.docx
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.