Skip to the record
Trusted by locals. Built for Noosa.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
‘–‡–•
EXECUTIVE SUMMARY ............................................................................................................3
1.0      INTRODUCTION .............................................................................................................4
2.0      SYSTEM COMPONENTS ...............................................................................................6
    2.1 EDGETECH 6205 MULTIPHASE ECHOSOUNDER .....................................................................6
    2.2 APPLANIX POS MV W AVEMASTER .......................................................................................6
    2.3 SONTEK CASTAWAY CTD ....................................................................................................7
    2.4 QPS ACQUISITION, PROCESSING, AND ANALYSIS SOFTWARE ................................................7
    2.5 LAND TRANSECTS AND SINGLE BEAM ECHOSOUNDER ...........................................................8
3.0      GEODETICS AND DATA REDUCTION .........................................................................9
4.0      SYSTEM INSTALLATION AND CALIBRATION ......................................................... 10
    4.1 SYSTEM INSTALLATION ..................................................................................................... 10
    4.2 SYSTEM COMMUNICATION AND CALIBRATION ..................................................................... 13
5.0      DATA PROCESSING ................................................................................................... 15
6.0      RESULTS ..................................................................................................................... 17
    SURVEY OPERATIONS............................................................................................................. 17
    COMPARISON TO EXISTING BATHYMETRY AND FUTURE SURVEYS ............................................. 21
    BACKSCATTER DATA .............................................................................................................. 22
7.0      SUMMARY ................................................................................................................... 23




2                                           Noosa Council - Noosa River Survey                                             20.06.2019

:  i :  Pi bid    ii    iio    7 TN    co
    ro)
     2 ot
     :  r © Co
     :  : :  pon
     fob;    baa             eee ENA
     ii   :  Ss aS
     PoE     PEGG      Pe ees
     ioboi   Poiob oi  PoP   oi:  oo   Port  :                                                                 So
     Poi     PE bE     PPE:      PoE   eS
     :  : :  PEP GG    :  :  iG  :  :  Poi:  :                                                                 g
     :  : :  PEGG      :  :  Dot :  :  Por:  :                                                                 N
     io:  oi PobobGG   io    ii  ii    Port  :                                                                 8
     Poi  i  Piiw i i     Pod       Bobb                                                                       S
     foi   8) 8296           fe  i     or                                                                      g
     ii    F523 Bo           ici    :  :O :  i                                                                 =
                             ns
     :  : Pow iga            : a :  :  :Z :  :                                                                 5
     ob   oi Fb ida    is    Pio    ois:     :
     i  of & cf g& & 2       i=  i  :  itt   :                                                                 ”
     :  : :  Hoi    Qa :     Dot :  :  :  :  :
     :  io uo gue &          it  ii    i>}   :                                                                 5
     i  i fa | B83     fo    i:  ii    Pe;   i
     PGs ye gues             :G  i  i  im    it                                                                $
     :  : Z  3:95 66         io  ot :  ii:   :                                                                 2
     ii   Pw    28     PEE:      ii    iD    t
     fob ow tGq52 4 2        if  i  PGS:     i                                                                 «
     :  : i Qi igs     i: <  Dt  :  :  Sut   :
     i    2 3236             PoE       io i i
    >   : Zz FeEOO SE        i=  i     iS i  :                                                                 S
       ro                  ri                                                                                  2
     poo: i Or:     x    a   iz  i  :  2D:   :
     i    3 $28              :O  ii    2B:   ;
     5a 225         G64 Aa  229     Poise:   :                                                                 S
       Uesah                        7                                                                          2
                  ee EOD            :  :O :  :                                                                 =
    298 89503            - 3Z20     i  rz:   :                                                                 3
    n a         Fen Qg 42           a  ar    :                                                                 £
 n       = oP ee OF 236             i Oo:    i                                                                 3
am  uw O HW a S225 5        <2 0    i Z2s<   :                                                                 8
 Ss 5 & & $3082 u E 5S O            : OW;    :                                                                oO
 o     ee   Hewett       s 2888          <                                                                     a
7 aia                                                                                                          3
 5g         eee                                                                                                :
              oO    Z    no Lu        Ww Zz
S*x2e         10)        >a ee au       BE =
    Wi  = , ainaiaial       nn a      Scs =
                      covet           Sal @
                      od     ~    6 28a
                                6S  9 NOM   NS
                                   ©        °                                                                  N
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.