Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                    BMT Eastern Australia Pty Ltd
                                                                    Level 8, 200 Creek Street
                                                                    Brisbane Qld 4000
                                                                    Australia
                                                                    PO Box 203, Spring Hill 4004

                                                                    Tel: +61 7 3831 6744
                                                                    Fax: + 61 7 3832 3627

                                                                    ABN 54 010 830 421

                                                                    www.bmt.org

Technical Memorandum
                                                                  Noosa Shire Council
    From:      Matthew Barnes                            To:      Daniel Wishaw
    Date:      29 March 2019                             CC:
    Subject:   Noosa Spit SEMP - Lower Noosa River Metocean Data Collection




1           Instrument Deployment Summary
To inform the Noosa Spit SEMP, metocean data collection has commenced including:

• The deployment of six tide recorders in the lower Noosa River to continuously measure water level for
    approximately six weeks. This data will be used to calibrate the hydrodynamic model and may also
    provide some valuable information to partially address concerns regarding the published tidal planes.

• Offshore fixed deployment Acoustic Doppler Current Profiler (ADCP) to continuously measure water
  level, current speed, current direction and wave parameters (height, period and direction). This data will
    be used to calibrate both the hydrodynamic and wave models.

• Boat-mounted ADCP measurements have been collected during both neap and spring tidal conditions.
  The measurements (from approximately low water to low water) were taken at Dog Beach, Noosa
    Sound, Munna Point and Noosaville. This data will used to calibrate the hydrodynamic model and
    understand the peak flood and ebb tide currents occurring at Dog Beach.

Figure 1-1 provides a map showing the instrument deployment and boat-mounted ADCP cross-sectional
transect locations. Table 1-1 provides a summary of the instruments. It is anticipated that the deployed
instruments will be retrieved in late April 2019.

Section 2 provides further details on the boat-mounted ADCP measurements




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.