Skip to the record
The only place to find full transcripts.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
The swath mapping system consisted of:
    •   Edgetech 6205 Multiphase Echo Sounder (bathymetry and backscatter);
    •   Applanix POS MV Wavemaster (positioning, motion, and heading data);
    •   AML micro-SVS (sound velocity at the sonar head);
    •   SonTek Castaway CTD (sound velocity through the water column);
    •   QPS QINSy software (data acquisition and real-time quality control);
    •   QPS Qimera and Fledermaus (data processing, editing, validation, and presentation);
    •   Chesapeake Technology SonarWiz (backscatter data processing).

An RTK GNSS antenna and Ceeducer single beam echosounder transducer were used for
the shallow sand bank and beach/foreshore transects.
This report provides an overview of the results from the Noosa River survey and forms a part
of the data deliverables consisting of:
    •   Ungridded processed data in XYZ Ascii format;
    •   Digital terrain models (gridded data) in XYZ Ascii format;
    •   Contours across various survey blocks in the river and offshore;
    •   Backscatter mosaic of selected representative areas in GeoTiff format;
    •   Fledermaus Scene containing relevant data sets for further review by NC;
    •   Daily reports during survey operations to convey progress and any incidents affecting
        operations; and
    •   Summary report discussing survey results.




5                             Noosa Council - Noosa River Survey                   20.06.2019
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.