2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
4.0 System Installation and Calibration
4.1 System Installation
Installation of the swath mapping system on the MES vessel SURVEY 1 occurred on March
14, 2019. The AI Universal Sonar Mount (USM) Expedition mount was attached to the
starboard side of the SURVEY1. A permanent mounting plate is affixed to the gunnel of the
SURVEY1 and the USM hinge mount bolts on to the plate. A vertical Z-Pole is attached to the
hinge mount, and the ET6205 transducer attaches to it.
An antenna mast with GNSS spreader bar attaches to the back side of the hinge mount, and
a plate for the POS MV IMU attaches to the front side. Thus all MPES components are affixed
relative to the mount and not the vessel.




                    Figure 8: ET6205 mounted on starboard side of SURVEY1.



The Z-Pole pivots around the USM X-Pole and hence be raised out of the water during vessel
transits. Deployment of the transducer into a vertical / survey configuration was done in a very
controlled manner through a combination of purpose-built large wrench attached to the
rotation mechanism on the hinge mount and a rope attached near the base of the pole.
Recovery of the pole into a horizontal position was done in a similar manner.




10                             Noosa Council - Noosa River Survey                    20.06.2019
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.