2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
The two Trimble 540AP GNSS antennas associated with the POS MV were affixed to a pair
bolts at the ends of the spreader bar. The location of the mast / mount provided clear views of
all available GNSS satellites. Separation between the two antennas is mechanically designed
to be 2m but a refined measurement was derived from the GNSS Azimuthal Measurement
System (GAMS) calibration (see Calibration section below)..




        Figure 10: GNSS antenna mounting on an L-shaped bracket at the stern of the vessel.



The POS MV PCS and all other electrical equipment were housed in the bow section of the
main cabin. GNSS antenna and IMU cables were fed into the area along the starboard side of
the deck and excess cable neatly coiled within the space to minimise the risk of
trips/slips/damage to the cables.
The acquisition laptop was located on a shelf in front of the passenger seat on the port side of
the vessel. An external monitor was connected to the laptop to provide the helmsman with
display of the real-time DTM to assist in vessel steerage.




12                             Noosa Council - Noosa River Survey                       20.06.2019
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.