Original source · versioned page text
2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnwere too shallow for safe operation of the MPES equipment. The figure below shows the
location of these survey points.
across the Noosa River survey region.
Interpolation between these transects combined with the swath bathymetry data allowed the
creation of contours map for NC (supplied as a DXF file). All the geospatially-corrected and
cleaned data were provided to NC for gridding/interpolation using alternative techniques.
Figure 20: Contours across the Noosa River Entrance region.
20 Noosa Council - Noosa River Survey 20.06.2019
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.