Skip to the record
Accept no imitations.

Original source · versioned page text

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
Backscatter Data
Although backscatter data wasn’t a focus of this project the data were logged and selected
regions processed to create mosaics. The sidescan-type backscatter data produced by the
ET6205 provide finer detail of riverbed features than the bathymetry data, and can be used to
make inferences about seabed types (e.g., the bathymetry was gridded at a 50cm bin size
whereas the sidescan sonar data was gridded at a 10cm bin size). In general, finer sediments
that absorb signal strength appear as darker pixels and coarser sediments that return more
signal appear as lighter/brighter pixels.
The example below comes from an area along Hilton Terrace. The sidescan imagery extends
to the shoreline and shows a rock-strewn area amongst softer sediments. In this case the
mosaic doesn’t show pronounced changes in backscatter strength, but the textural
information suggests may be used to show more cemented or consolidated areas relative to
soft sediment areas.




              Figure 21: Example backscatter mosaic along Gympie Terrace shoreline.



A more extensive analysis of the backscatter data is intended prior to further geophysical
work involving a subbottom profiler (SBP) system. The SBP data should allow identification of
sand regions in advance of a dredging program.




22                             Noosa Council - Noosa River Survey                     20.06.2019
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.