Original source · versioned page text
2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn2. River Mouth Control Structures A: Lengthening of the existing spit groyne to increase sediment trapping and decrease sediment bypassing into the river mouth, with a sediment pathway that is more likely to bypass the river mouth entirely due to sediment being mobilised in deeper water. <Insert Report Title> Page 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.