2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2

of 63

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
                                                                                                        4



2        Boat-mounted ADCP Transect Summary
Acoustic Doppler Current Profilers (ADCPs) measure 3D velocities in a vertical profile of discrete bins at
an instant in time (called an ensemble). A boat-mounted ADCP is used to measure velocity profiles while
the boat traverses a section or transect. Total flow through the transect is calculated by integrating the
ADCP velocity profile data vertically from the bottom-most to the top-most bin and horizontally/temporally
across each transect using the Teledyne RD Instrument WinRiver II software.

A total of 288 unique transects were completed during neap tide and spring tide periods in the lower Noosa
River. The transect locations are shown in Figure 2-1 and include:

• Neap tide cross-sectional transects at Dog Beach, Noosa Sound, Munna Point and Noosaville on 14
    March 2019

• Spring tide cross-sectional transects at Dog Beach, Noosa Sound, Munna Point and Noosaville on 20
  March 2019

• Spring tide long-sectional transects at Dog Beach on 21 March 2019




                                      Figure 2-1    ADCP Transect Locations




 G:\Admin\B23636.g.mpb.NoosaSpit_SEMP\M.B23636.002.MetoceanDeployment.docx
Log in to download the original file

2019-12-16 GC Agenda - Item 5 - Attachment 1 - Noosa Spit Shoreline Erosion Management Plan-Part 2(PDF, 8MB).pdf · 8.2 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.