Skip to the record
For the highest quality transcripts.

Original source · versioned page text

Negotiated Decision Notice MCU22 0099 [As Published]

of 6

Page text shows just the words. Original shows the document exactly as it was published.

                      Ecological
               6.     The rehabilitation must be implemented in accordance with the Ecological Assessment
                      Report, prepared by Green Tape Solutions and dated 19 September 2022 within three
                      months after the occupation of the house.
               7.     The rehabilitation works must be by a suitably qualified person, including the following
                      minimum specifications:
                      a.      Landscape planting specifications in accordance with Landscaping Code and PSP 2
                              Landscaping;
                      b.      A planting schedule of suitable locally occurring species, plant numbers and locations,
                              reflective of the Regional Ecosystem 12.3.1 & 12.3.2;
                      c.      Control of all environmental weeds of the site in accordance with best industry practice
                              for environmental rehabilitation which does not result in bed or bank instability;
                      d.      Avoid undesirable plant species identified in PSP2 Landscaping;
                      e.      Planting densities must result in a stable channel over the long term and minimal
                              potential for pest plant species.
               8.     Existing trees on the site must be retained, unless an environmental weed.
                      Effluent Disposal
               9.     The development must be provided with an on-site waste water treatment and effluent
                      disposal system having a capacity suitable for the development and positioned generally in
                      accordance with the Effluent Disposal Report prepared by Global Testing and dated
                      21/03/2022 and Ecological Assessment Report Green Tape Solutions and dated 19
                      September 2022.
                      ENGINEERING
                      Approved Plans
               10.    Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                           Plan        Plan/Document Name                                     Date
                           No.

                           32207- Site silt and Sediment Control, prepared by SCG August 2022
                           C1.1   Consulting Engineers

                           32207- Site silt and Sediment Control, prepared by SCG August 2022
                           C1.2   Consulting Engineers

                           32207- Garage Drainage Schematic                                   August 2022
                           C3.1

                      Stormwater Drainage
               11.    Stormwater runoff from the development must be disposed of on-site without causing scour
                      or damage to the subject site or any adjoining property. The works must be undertaken
                      generally in accordance with drawing No 32207-C3 prepared by SCG Consulting dated
                      August 2022.
                      Geotechnical Stability
               12.    All works must be carried out in accordance with the recommendations contained in section
                      8 of ARCOS’ Report on Geotechnical Investigation (220329-01-A) dated 31 May 2022.




                                                                                                         Page 3 of 6
Document Set ID: 22207741
Version: 2, Version Date: 13/12/2022
Log in to download the original file

Negotiated Decision Notice MCU22 0099 [As Published].pdf · 192 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.