Negotiated Decision Notice MCU22 0099 [As Published]
Ecological
6. The rehabilitation must be implemented in accordance with the Ecological Assessment
Report, prepared by Green Tape Solutions and dated 19 September 2022 within three
months after the occupation of the house.
7. The rehabilitation works must be by a suitably qualified person, including the following
minimum specifications:
a. Landscape planting specifications in accordance with Landscaping Code and PSP 2
Landscaping;
b. A planting schedule of suitable locally occurring species, plant numbers and locations,
reflective of the Regional Ecosystem 12.3.1 & 12.3.2;
c. Control of all environmental weeds of the site in accordance with best industry practice
for environmental rehabilitation which does not result in bed or bank instability;
d. Avoid undesirable plant species identified in PSP2 Landscaping;
e. Planting densities must result in a stable channel over the long term and minimal
potential for pest plant species.
8. Existing trees on the site must be retained, unless an environmental weed.
Effluent Disposal
9. The development must be provided with an on-site waste water treatment and effluent
disposal system having a capacity suitable for the development and positioned generally in
accordance with the Effluent Disposal Report prepared by Global Testing and dated
21/03/2022 and Ecological Assessment Report Green Tape Solutions and dated 19
September 2022.
ENGINEERING
Approved Plans
10. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are listed in the following table unless
otherwise amended by these conditions.
Plan Plan/Document Name Date
No.
32207- Site silt and Sediment Control, prepared by SCG August 2022
C1.1 Consulting Engineers
32207- Site silt and Sediment Control, prepared by SCG August 2022
C1.2 Consulting Engineers
32207- Garage Drainage Schematic August 2022
C3.1
Stormwater Drainage
11. Stormwater runoff from the development must be disposed of on-site without causing scour
or damage to the subject site or any adjoining property. The works must be undertaken
generally in accordance with drawing No 32207-C3 prepared by SCG Consulting dated
August 2022.
Geotechnical Stability
12. All works must be carried out in accordance with the recommendations contained in section
8 of ARCOS’ Report on Geotechnical Investigation (220329-01-A) dated 31 May 2022.
Page 3 of 6
Document Set ID: 22207741
Version: 2, Version Date: 13/12/2022
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.