REPORT TO
NICK AND JULIETTE CUSACK

ON
GEOTECHNICAL ASSESSMENT

FOR
PROPOSED RESIDENCE

AT
20 WOONGAR STREET, BOREEN POINT, QLD

Date: 16 May 2023
Ref: 35891URrpt Rev1




www.jkgeotechnics.com.au

T: +61 2 9888 5000
JK Geotechnics Pty Ltd
ABN 17 003 550 801
Log in to download the original file

Appendix B - Geotechnical Investigation Report.pdf · 2.4 MB (large file)

The download may take up to a minute.

Full text of the other 44 pages

Page 2

Report prepared by:
                                       Paul Roberts CPEng, RPEQ
                                       Principal Associate | Engineering Geologist



For and on behalf of
JK GEOTECHNICS
PO Box 503,
Cooroy, QLD, 4563
Head Office:
PO BOX 976
NORTH RYDE BC NSW 1670


DOCUMENT REVISION RECORD
  Report Reference                             Report Status                                  Report Date
  35891URrpt                                   Final Report                                   24 April 2023
  35891URrpt Rev1                              Revised report following review by             16 May 2023
                                               architect



© Document copyright of JK Geotechnics

 This report (which includes all attachments and annexures) has been prepared by JK Geotechnics (JKG) for its Client, and is
 intended for the use only by that Client.

 This Report has been prepared pursuant to a contract between JKG and its Client and is therefore subject to:
 a)         JKG’s proposal in respect of the work covered by the Report;
 b)         The limitations defined in the Client’s brief to JKG;
 c)         The terms of contract between JKG and the Client, including terms limiting the liability of JKG.
 If the Client, or any person, provides a copy of this Report to any third party, such third party must not rely on this Report, except
 with the express written consent of JKG which, if given, will be deemed to be upon the same terms, conditions, restrictions and
 limitations as apply by virtue of (a), (b), and (c) above.

 Any third party who seeks to rely on this Report without the express written consent of JKG does so entirely at their own risk and
 to the fullest extent permitted by law, JKG accepts no liability whatsoever, in respect of any loss or damage suffered by any such
 third party.

 At the Company’s discretion, JKG may send a paper copy of this report for confirmation. In the event of any discrepancy between
 paper and electronic versions, the paper version is to take precedence. The USER shall ascertain the accuracy and the suitability
 of this information for the purpose intended; reasonable effort is made at the time of assembling this information to ensure its
 integrity. The recipient is not authorised to modify the content of the information supplied without the prior written consent of
 JKG.




35891URrpt Rev1                                               ii

Page 3

                                       Table of Contents
1   INTRODUCTION                                           1
2   DETAILS OF THE SITE AND THE PROPOSED DEVELOPMENT       1
3   ASSESSMENT PROCEDURE                                   2
4   DESCRIPTION OF EXISTING CONDITIONS                     2
    4.1   Geology                                           2
    4.2   Subsurface Conditions                             3
    4.3   Summary of Observations                           3
          4.3.1 Topography                                  3
          4.3.2 Groundwater and Surface Drainage            4
          4.3.3 Vegetation                                  4
          4.3.4 Buildings and Other Structures              5

5   GEOTECHNICAL STABILITY ASSESSMENT                      5
    5.1   Existing Conditions                               5
    5.2   Risk Assessment                                   6
          5.2.1 Potential Geotechnical Hazards              6
          5.2.2 Risk Analysis                               7
          5.2.3 Additional Comments                         7
    5.3   Geotechnical Constraints to Development           7

6   COMMENTS AND RECOMMENDATIONS                           8
    6.1   Site Layout and Development Details               8
    6.2   Site Classification                               8
    6.3   Demolition and Excavation                         8
          6.3.1 Dilapidation Surveys                        8
          6.3.2 Demolition and Excavation Methods           8
          6.3.3 Seepage                                     9
    6.4   Temporary Excavation Support and Retention        9
    6.5   Retention Design Parameters                      10
    6.6   Footing Design                                   10
    6.7   Floor Slabs                                      12
    6.8   Earthworks                                       12
          6.8.1 Subgrade Preparation                       13


35891URrpt Rev1                              iii

Page 4

           6.8.2 Drainage During Construction           13
           6.8.3 Engineered Fill                        13
    6.9    Wastewater Treatment and Disposal            14
    6.10   Overall Effect of Development on Stability   14

7   CONCLUSION                                          14
8   GENERAL COMMENTS                                    15


ATTACHMENTS
Table A: Summary Of Risk Assessment To Property
Figure 1: Site Location Plan
Figure 2: Geotechnical Site Plan
Figure 3: Geotechnical Mapping Symbols
Appendix A: Landslide Risk Management Terminology

Report Explanation Notes




35891URrpt Rev1                                 iv

Page 5

1    INTRODUCTION
This report presents the results of our geotechnical assessment for the proposed residence at 20 Woongar
Street, Boreen Point, QLD. The assessment was commissioned by Nick Cusack by return of a signed
‘Acceptance of Proposal’ form dated 2 March 2023. The commission was on the basis of our proposal
(Ref. P58265UR) dated 2 March 2023.

The site was inspected by our Principal Associate engineering geologist, in order to assess the stability of the
site and the effect on stability as a result of the proposed development. This report presents a summary of
our site observations, a review of the subsurface conditions, the results of our geotechnical assessment and
geotechnical comments and recommendations with regard to the proposed development.



2    DETAILS OF THE SITE AND THE PROPOSED DEVELOPMENT
The site comprises Lot 1 on Plan Number RP112348. The coordinates of the site are approximately
Latitude -26.282555 and Longitude 152.993253. A site location plan is presented as Figure 1.

We have been provided with the following relevant information:
   Survey plan (Drawing Number 210809CD, dated 31 August 2021) prepared by Geo Surveying.
   Architectural drawings (Drawing Numbers CD 01 01, CD 01 02 and CD 02 03 Issue 6 and CD 02 01 and 02
    Issue 5, dated 27 February 2023) prepared by Morrison Architecture.
   A “Soil Test Report” (Ref. 210450(S), dated 15 December 2021) prepared by Australian Soil Investigations
    (ASI).
   A “Site and Soil Evaluation” (Ref. 210450(A), dated 14 December 2021) prepared by ASI.

Based on a review of the provided information and additional information provided by Morrison
Architecture, we understand that the existing shed and car port over the south-eastern portion of the site
will remain and a new one and two storey residence will be constructed to the north of the existing shed.
The residence will extend over the existing slope and the structure will be supported by steel columns and
the suspended floors will be timber framed. An effluent disposal system is proposed over the south-western
portion of the site. The proposed finished floor reduced levels (RL’s) of the Lower and Ground Floor Levels
will be RL10.4m and RL13.2m, respectively. A limited amount of localised excavation at the southern
(upslope) end of the proposed lower level in the order of a maximum of 2.2m will be required to achieve the
design surface levels. At a later date, a southern extension including an additional bedroom and new car
port is proposed; the bedroom will be provided with a suspended timber floor and the car port will be provide
with an on ground concrete slab.

Structural loads have not been provided and typical loadings for this type of development have been
assumed.




35891URrpt Rev1                                    1

Page 6

3     ASSESSMENT PROCEDURE
This stability assessment is based upon:
     A detailed inspection of the topographic, surface drainage and geological conditions of the site and its
      immediate environs which was completed by our Principal Associate engineering geologist on
      15 March 2023. These features were compared to those of other similar lots in neighbouring locations
      to provide a comparative basis for assessing the risk of instability affecting the proposed development.
      The attached Appendix A defines the terminology adopted for the risk assessment together with a
      flowchart illustrating the Risk Management Process based on the guidelines given in AGS 2007c
      (Reference 1).
     A review of the subsurface conditions presented in the ASI “Soil Test Report” which was separately
      commissioned by Nick Cusack.

The attached Figure 2 presents a geotechnical site plan showing the principal geotechnical features present
at the site and is based on the provided survey plan with the approximate outline of the proposed Ground
Floor level superimposed. Additional features on Figure 2 have been measured by hand held clinometer and
tape measure techniques and hence are only approximate. Should any of the features be critical to the
proposed development, we recommend they be located more accurately using instrument survey
techniques. Figure 3 presents an explanation of the geotechnical mapping symbols used on Figure 2.



4     DESCRIPTION OF EXISTING CONDITIONS

4.1     Geology
The 1:100,000 Gympie Special geological map (First Edition 1999) prepared by the Queensland Department
of Mines and Energy indicates that the site is underlain by Late Triassic – Jurassic age Myrtle Creek Sandstone;
(see Plate 1).
                                          Approximate Site Location




                               Plate 1: Extract of Gympie Special geology map




35891URrpt Rev1                                    2

Page 7

4.2     Subsurface Conditions
Based on our review of the provided ASI “Soil Test Report” and our site observations, the pertinent aspects
of the subsurface conditions are summarised below:
     Sandy clay fill assessed to be of medium to high plasticity was encountered in BH2 and was 0.7m thick.
      Based on the location of BH2, the fill is likely backfill to the timber sleeper retaining wall. Based on the
      DCP test results the fill has been assessed to be poorly compacted. We also note that in the absence of
      formal records of placement and density test results, the fill is regarded as ‘uncontrolled’ as defined in
      AS2870-2011 ‘Residential slabs and footings’.
     Silty sand topsoil (0.03m thick) encountered at surface level (BH1) and below the fill (BH2).
     From below the topsoil, BH1 encountered gravelly sand over residual sandy clay assessed to be of low to
      medium plasticity to the termination depth of 3.0m and BH2 initially encountered a 0.5m thick band of
      residual gravelly sand overlying residual sandy clay assessed to be of medium to high plasticity which
      extends to the termination depth of 3.0m. Based on our review of the DCP blow counts we interpret:
          o The relative density of the gravelly sand in BH1 to be very loose and the clay strength to be
              initially soft then soft to firm, improving to stiff to very stiff below about 2.2m depth and hard
              strength below about 2.4m depth.
          o The relative density of the gravelly sand in BH2 to be loose to medium dense and the underlying
              clays to be generally of hard strength.
     At the termination depth of BH1, the ASI log notes “approaching weathered sandstone” and DCP refusal
      was at about 2.0m depth. In BH2, DCP refusal was at about 2.2m depth but there was no similar note
      regarding “approaching weathered sandstone”. Based on our experience in this area and the results of
      the ASI investigation, we have interpreted the DCP refusal depths to indicate the surface of extremely
      weathered sandstone bedrock surface at depths of about 2.8m (BH1) and 2.2m (BH2), although the
      presence of bands of weathered bedrock or ‘floaters’ within the residual soil profile (indicated by the
      high DCP blow counts) cannot be discounted. We note that the transition of hard residual clay to
      extremely weathered sandstone represents the weathering profile of the bedrock and the actual soil-
      rock interface can vary across the site. However, based on the topographic setting of the site overall the
      bedrock surface would be expected to step or slope down to the north.
     No groundwater was encountered within the depth of the investigation.



4.3     Summary of Observations
We recommend that the summary of observations which follows in Sections 4.3.1 to 4.3.4 be read in
conjunction with the attached Figure 2.



4.3.1 Topography
     The site is located on the crest of a hillside above the western foreshore of Lake Cootharaba and is
      situated on the northern side of a small promontory (orientated east-west) in the foreshore area. The
      upper (southern) portion of the site is relatively flat and has a southern frontage on to Woongar Street.




35891URrpt Rev1                                      3

Page 8

   Across the central portion of the site the site surface levels sloped down to the north at between about
    25o and 40o (see Plate 2) to a gently sloping lower portion that extended northwards into neighbouring
    bushland. The slope also extended north-west and south-east beyond the site boundaries.




                Plate 2: steep slope crossing the central portion of the site (looing south-east)

   The steeper (south-eastern) portion of the central sloping area was overgrown and the “rock RW”
    indicated on the survey plan was not visible. Upslope of the central sloping area a timber sleeper
    retaining wall supported the relative flat yard area to the south. For more details on the retaining walls
    see Section 4.3.4 below.



4.3.2 Groundwater and Surface Drainage
   As noted in Section 4.2 above, no groundwater was encountered within the depth of the investigation.
   Based on the topographic setting of the site, surface run-off from the south not captured by the roads
    stormwater drainage system would be directed down to the north and north-east through the site to the
    bushland downslope.
   Locally, some run-off from the upper section of the site may be captured by drainage behind the retaining
    walls within the upper yard area.



4.3.3 Vegetation
   The site contained a number of medium to large sized trees which also occupied the neighbouring
    properties. The northern portion of the neighbouring property to the east was grass covered.
   The bushland to the north extends to the lake foreshore and contained numerous trees (maximum height
    about 20m).
   Based on our site observations there were occasional trees that were leaning and/or had curved bases
    over the steeper section of the central sloping area of the site (see Plate 2 above).




35891URrpt Rev1                                   4

Page 9

4.3.4 Buildings and Other Structures
     The south-eastern portion of the site was occupied by a brick shed, metal clad amenities shed and a
      timber car port with a brick paved floor.
     The relatively flat upper (southern) portion of the site was supported by a timber sleeper retaining wall
      about 0.6m height (see Plate 3) and as noted above there is a boulder retaining wall indicated on the
      survey plan that was overgrown and corresponds to the steeper portion of the sloping central portion of
      the site. There were no obvious signs of significant timber retaining wall damage.




              Plate 3: timber sleeper retaining wall supporting the southern portion of the site

     The neighbouring two storey timber house to the west was set-back about 1.5 from the common site
      boundary. Surface levels were similar across the site boundary and the neighbouring surface levels in
      the rear yard stepped and sloped down to the north with a rock facing supporting a steeper section just
      beyond the neighbouring northern site boundary. The northern portion of the neighbouring house was
      suspended between timber posts supported by concrete footings.
     The neighbouring one and two storey steel framed concrete block and timber clad house and a metal
      clad single level northern extension were suspended over the slope (see Plate 2 above) and a metal clad
      garage was located over the south-western portion of the neighbouring site. The buildings were set-back
      between about 1m and 3m from the common site boundary. Surface levels were similar across the site
      boundary
     There were no obvious signs of damage to buildings within or neighbouring the site that indicated slope
      instability.


5     GEOTECHNICAL STABILITY ASSESSMENT

5.1     Existing Conditions
Reference to the Noosa Shire Council Landslide Hazard Overlay Map [Ref. OM-LS-14A] dated 2019 indicates
that the site contains areas of terrain that are designated as “Moderate Hazard“ and “High Hazard”. An
extract of the Landslide Hazard Overlay Map OM-LS-14B is presented as Plate 4.




35891URrpt Rev1                                     5

Page 10

                                                  Site Location




                       Plate 4: Extract of the Landslide Hazard Overlay Map OM-LS-14B

Based on our site observations:
     There were signs of near surface creep of the steeper central portion of the site indicated by leaning
      trees and trees with curved bases. However, there were no obvious signs of potential deeper slope
      instability such as tension cracks in the slope surfaces.
     There were no obvious signs of retaining wall instability such as tension cracks behind the wall crests,
      bulging faces etc although our observations were limited by the overgrown nature of some areas of the
      site. However, we have assumed that the retaining walls within the site were engineer designed.

We have no information regarding the placement of the fill on the site and as such it has been assessed as
being ‘uncontrolled’ as defined in AS2870-2011. As noted in Section 4.2 above we also assessed the fill to be
poorly compacted based on the DCP test results.



5.2     Risk Assessment

5.2.1 Potential Geotechnical Hazards
Based on our site observations, assessment of existing conditions provided above, and the form of the
proposed residence, we consider that the potential geotechnical hazards for the site, may be summarised as
follows:
1. Deep seated instability.
2. Slow moving near surface creep of the steeper section of the site.
3. Instability of existing retaining walls.
4. Instability of temporary excavation batters.
5. Instability of new retaining walls.

It is important to be mindful that slope instability can occur at any time and it would be difficult or impossible
to predict when the identified potential hazards will occur. Also, we cannot predict when an extreme or
unusual event may occur (such as an earthquake or 1 in 100 year rainfall event etc) and what impact it would
have on the stability of the identified potential hazards described above.


35891URrpt Rev1                                     6

Page 11

5.2.2 Risk Analysis
Our geotechnical assessment of the risk of instability is based on the methodology proposed by Australian
Geomechanics Society (2007c) ‘Practice Note Guidelines for Landslide Risk Management’ (Reference 1) and
the relevant site features described above.

Risk To Property
The attached Table A summarises our assessment of risk to property under existing conditions and during
and following construction.

Under existing conditions, during and following construction, Table A indicates that the assessed risk to
property is “Low” and “Very Low”. In accordance with the criteria given in Reference 1, “Low” and “Very
Low” risk levels are considered to be “Acceptable”.

Risk To Life
We have not completed a comprehensive assessment of risk to life. However, based on the indicative
probabilities associated with the assessed likelihood of instability and assuming typical temporal,
vulnerability, evacuation and spatial factors for this type of site, we consider that the levels of risk to life
under existing condition, during and following construction to be “Acceptable” in relation to the criteria given
in Reference 1, i.e. less than 1 x10-6. We note that this assumes the recommendations outlined in Section 6
below are adopted.



5.2.3 Additional Comments
It must be recognised that, due to the many complex factors that can affect a site, the subjective nature of a
risk analysis, and the imprecise nature of the science of geotechnical engineering, the risk of instability for a
site cannot be completely removed. It is, however, essential that risk be reduced to at least that which could
be reasonably anticipated by the community in everyday life and that landowners be made aware of
reasonable and practical measures available to reduce risk as far as possible. Hence, risk cannot be
completely removed, only reduced, as removing risk is not currently scientifically achievable.

In preparing our recommendations given below we have assumed that no activities on surrounding land
which may affect the risk on the subject site would be carried out. We have further assumed that all Council
buried services and other buried services within and neighbouring the site are, and will be regularly
maintained to remain, in good condition.



5.3   Geotechnical Constraints to Development
Based on the contents of Sections 5.1 and 5.2 we consider that there are no geotechnical constraints to the
proposed development. Provided the proposed development is designed and constructed in accordance
with the advice presented in Section 6, we consider that following construction, the levels of risk to life and
property will remain at “Acceptable” levels.



35891URrpt Rev1                                     7

Page 12

6     COMMENTS AND RECOMMENDATIONS

6.1    Site Layout and Development Details
Based on a review of the provided information and additional information provided by Morrison
Architecture, we understand that the existing shed and car port over the south-eastern portion of the site
will remain and a new one and two storey residence will be constructed to the north of the existing shed.
The residence will extend over the existing slope and the structure will be supported by steel columns and
the suspended floors will be timber framed. An effluent disposal system is proposed over the south-western
portion of the site. The proposed finished floor reduced levels (RL’s) of the Lower and Ground Floor Levels
will be RL10.4m and RL13.2m, respectively. A limited amount of localised excavation at the southern
(upslope) end of the proposed lower level in the order of a maximum of 2.2m will be required to achieve the
design surface levels. At a later date, a southern extension including an additional bedroom and new car
port is proposed; the bedroom will be provided with a suspended timber floor and the car port will be provide
with an on ground concrete slab.



6.2    Site Classification
The ASI “Soil Test Report” has identified the site as being Class P in accordance with AS2870-2011 due to the
presence of uncontrolled fill, “poor” allowable bearing pressure of the upper soil profile and the presence of
trees, some of which will be removed. We concur with the Class P site classification.



6.3    Demolition and Excavation

6.3.1 Dilapidation Surveys
Prior to the commencement of excavation, detailed dilapidation reports should be compiled on the
neighbouring properties to the east and west. In addition, Council may require that dilapidation surveys
report be completed on the Council assets lining the street frontage, i.e. the roadway and kerb and gutter.
The property owners should be asked to confirm that the reports present a fair record of existing conditions
as the reports may assist the client in defending themselves from unfair damage claims.



6.3.2 Demolition and Excavation Methods
The excavation recommendations provided below should be complemented by reference to the current Safe
Work Australia Code of Practice ‘Excavation Work’.

The outline of the proposed Ground Floor level is indicated on the attached Figure 2. To achieve design
surface levels excavations are expected to extend to a maximum depth of about 1m below existing levels.
The excavations will remove the overgrown rock retaining wall indicated by the survey plan over the eastern
end of the steep central portion of the site. The rock wall may extend into the neighbouring site.




35891URrpt Rev1                                   8

Page 13

The bulk excavations must be carefully completed and prior to the excavations commencing the overgrown
rock wall should be cleared of vegetation and inspected by the structural and geotechnical engineers in order
to assess the current condition of the wall. In addition, if the rock wall extends across the site boundary,
then the inspection will assist in confirming the most appropriate excavation strategy in order to maintain
stability of the portion of wall that will remain, including any temporary propping or permanent stabilisation
measures, if applicable.

Based on the ASI investigation results, the proposed excavations will encounter the soil profile. Any topsoil
or root affected soils should be stripped and separately stockpiled for re-use in landscape areas or
appropriately disposed of off site.

Due to the small size and sloping nature of the central portion of the site, we expect the excavations will be
completed using small to medium sized tracked excavators, and excavation of the soils and any sections of
the overgrown rock wall will be readily completed with buckets of such equipment. Locally a ripping tyne
attachment to the excavator may be required over the deepest section of the excavation in order to remove
weathered rock. If rock breakers are required then further advice will need to be sought as potentially
damaging vibrations can be generated by rock breakers.

The poorly compacted surficial fill encountered in the investigation may extend across the site boundaries.
We therefore advise that sudden stop/start movements of any tracked equipment should be avoided in order
to reduce transmission of ground vibrations to the adjacent sections of buildings and structures within and
neighbouring the site.



6.3.3 Seepage
Groundwater seepage was not encountered in the boreholes completed by ASI. Some ephemeral seepage
inflows may be encountered in any excavations particularly after periods of heavy or prolonged rainfall. In
general, we expect that inflows, if any, to be of very small volume and managed by gravity drainage to the
lower gently sloping portion of the site. Inspection and monitoring of groundwater seepage during
excavations is recommended, so that any unexpected conditions, which may be revealed can be incorporated
into the drainage design.



6.4   Temporary Excavation Support and Retention
Temporary batter slopes through the sandy soil profile no steeper than 1 Vertical (V) in 1.5 Horizontal (H) are
considered to be appropriate, steeper batters of 1V in 1H will be suitable for clay soils and any extremely
weathered bedrock (if encountered), though some surficial instability could still occur. These temporary
batters are expected to be achievable within the site geometry.

Some instability of temporary sand batters may occur at, or below, the level of any groundwater seepage
should it occur, especially after rain periods, and sand bagging may be required to stabilise the lower portion
of these batters.


35891URrpt Rev1                                    9

Page 14

Stockpiles of construction materials, excavated materials, existing footings, etc. should be kept well clear of
the batter crests to avoid surcharging the slopes.

We expect that retaining walls will be constructed within the temporary batters, temporarily propped,
backfilled and permanently supported by the structure.



6.5     Retention Design Parameters
The following characteristic earth pressure coefficients and subsoil parameters may be adopted for the
design of retaining walls that will be propped by the structure and any landscape retaining walls:
     For retaining walls that will be temporarily propped, backfilled and permanently restrained by the
      structure, we recommend the use of a triangular lateral earth pressure distribution with an ‘at rest’ earth
      pressure coefficient (ko) of 0.6 for the soil profile, assuming a horizontal backfill surface.
     For landscape retaining walls, where we assume minor movements will be able to be tolerated, we
      recommend the use of a triangular lateral earth pressure distribution with an ‘active’ earth pressure
      coefficient (ka) of 0.4 for the soil profile, assuming a horizontal backfill surface.
     A bulk unit weight of 20kN/m3 should be adopted for the retained profile.
     Any surcharge affecting the walls (e.g. nearby footings, compaction stresses, sloping retained surfaces,
      construction loads etc) should be allowed for in the design using the appropriate above earth pressure
      coefficient.
     Conventional retaining walls should be designed as drained and provision made for permanent and
      effective drainage of the ground behind the walls. Subsurface drains should incorporate a non-woven
      geotextile fabric, such as Bidim A34, to act as a filter against subsoil erosion. The subsoil drains should
      discharge into the stormwater system.
     Lateral restraint of retaining walls founded in the soil profile below bulk excavation level or adjacent
      surface levels may be provided by the passive pressure of the soil below these levels. A ‘passive’ earth
      pressure coefficient, Kp, of 3 may be adopted, provided a Factor of Safety of at least 2 is used in order to
      reduce the high deflections that are associated with achieving a full passive case. Localised excavations
      in front of the walls e.g. for buried services etc must also be taken into account when checking the
      embedment depth design. We note that where the ground surface on the low side of the wall slopes
      away from the wall, the lowest ground level within 5m of the wall should be adopted for assessing the
      level at which passive resistance will be effective.
     Friction between the base of a retaining walls and the underlying bedrock can be calculated using a
      friction angle of 35°, provided the base is clean, rough and dry when the retaining wall footing is poured.



6.6     Footing Design
The ASI report has assessed the residual clays to have a high potential for shrink/swell reactivity with changes
in moisture content. However, considering the limited thickness of reactive residual clays and clay fill,
characteristic surface movements in the range for a Class S to Class M site are expected and are likely to be
differential across the proposed house. However, we expect trees to be removed as part of the work and so

35891URrpt Rev1                                      10

Page 15

elevated characteristic surface shrink swell movements in the range of a Class M to H1 site could be expected
and would again be expected to be differential.

The upper residual sands are of variable relative density and very loose sands and soft to firm residual clays
are not considered to be suitable foundation materials due to the low allowable bearing capacity and
potential for high elastic settlements. The very loose sands are also not considered suitable for supporting
building loads as they are susceptible to additional settlements due to vibrations and infiltration of surface
water run-off.

For uniformity of support and for stability considerations, the footings supporting the proposed house should
be uniformly founded in bedrock which we expect to be encountered at depths between about 2.2m and
2.8m. Footings may be designed for an allowable bearing capacity of 600kPa, subject to inspection of a
representative number of footing excavations by a geotechnical engineer prior to placing the reinforcement
cages.

Locally over the deeper section of the excavation pad or strip footings will be suitable. However, over the
majority of the proposed building, we expect that bored piles will be suitable but will require rock sockets to
be formed and sacrificial liners will be required to support the upper sandy soils, where encountered. We
expect that powerful pile drilling plant with rock augers fitted with tungsten carbide teeth would be required
although the size of piling rig may be restricted by the limited site access and sloping nature of the site.
Further advice from the piling contractor should be sought in regard to the most suitable piling rig to form
the rock sockets particularly as medium (and possibly higher) strength bedrock may be encountered.

Due to the variability relative density and strength of the upper residual sand and clay profile, the potential
for differential movements and for uniformity of support, we recommend that the later southern extension
also be founded in bedrock. If it is preferred to found the southern extension in the residual sands or clays
then further geotechnical advice would need to be sought. However, we forewarn that the footings and floor
slabs would need to be designed with regard for the recommendations for a Class M or H1 site (due to the
removal of trees) provided in AS2870 and differential shrink swell movements would be expected across the
extension would be expected. A full height movement control joint would also need to be provided between
the extension and the proposed house, which will be founded in bedrock. An allowable bearing pressure of
100kPa may be adopted for design of footings founded in the residual clays of at least stiff strength or residual
sands of at least loose relative density but this would locally require piers to be founded in the order of 2.2m
depth (based on BH1). Differential reactive movements would also be expected and we reiterate that further
geotechnical advice must be sought if the later extension is to be founded in the residual soils.

The weathered bedrock will soften in the presence of water so the piles must be drilled, inspected and poured
without delay and preferably on the same day. All pile holes should be free from all loose or softened
materials prior to pouring. If water ponds in the base of the pile holes, the water should be removed and
then the footing excavation deepened to remove all loose and any water softened materials.




35891URrpt Rev1                                    11

Page 16

6.7   Floor Slabs
We understand that a timber frame floor slab is proposed and will be entirely suspended, including the
proposed later extension although the car port will comprise a concrete slab on ground.

Whilst slab-on-grade construction is theoretically feasible for the car port floor slab, it will be difficult to
complete high quality earthworks on a small site such as this, as it would require removing and re-compacting
any existing poorly compacted fill. Also, on-grade floor slabs in contact with varying thickness of foundation
soils would result in differential deflections, and potential cracking of the car port floor slab. We recommend
that the car port floor slab also be fully suspended over the soil profile between footings founded in bedrock.

For floor slabs suspended over soil subgrade areas, unless sacrificial formwork is used (such as ‘Bondek’) the
subgrade preparation would comprise the removal of any topsoil and/or any soil containing organics,
completion of and re-profiling of site surface levels and the nominal tracking of ‘formwork fill’ to the required
subgrade level. We forewarn that even this nominal subgrade preparation will be difficult on this sloping site
and the use of sacrificial formwork is strongly recommended. However, void formers will be required if the
slabs are in contact with the reactive soils. Design of the void formers should be to accommodate maximum
shrink swell movements of about 30mm to 40mm below the slab and beams between the piles so that the
swell pressures from the clays are not transferred to the slab.

The car port on-grade floor slab, if preferred, should be provided with joints capable of resisting shear forces
but not bending moments by providing dowels or keys. The on-grade car port floor slab should be designed
as ‘floating’ i.e. separated from all footings and walls in order to permit relative movement.

The future on grade car port slab will be supporting traffic loads and should be provided with at least a
100mm thick subbase layer of unbound or equivalent good quality crushed rock (e.g. ‘Type 2’ material in
accordance with the latest revision of TMR Technical Specification MRTS05, compacted in a single layer using
a large smooth drum roller to at least 98% of Standard Maximum Dry Density (SMDD). A bond breaker should
be provided between the concrete base and the sub-base. Moisture conditioning to within 2% of Standard
Optimum Moisture Content (SOMC) should be provided during placement so as to reduce the potential for
material breakdown. The subbase will provide more uniform slab support and protect areas of prepared clay
subgrade from deterioration. The subbase will also reduce the “pumping” of “fines” at joints.

Surface drains should be provided along the perimeter of the car port floor slab, with inverts not less than
0.2m below design subgrade level. The drains should be excavated with a longitudinal fall to appropriate
discharge points so as to reduce the risk of water ponding. The car port subgrade should be graded to
promote water flow to the drains.



6.8   Earthworks
For on-grade construction of the car port floor slab, we reiterate that it will be difficult to complete high
quality earthworks over such small site areas. Even if the earthworks are completed in accordance with the
following recommendations, it is likely there will be a significant variation in subgrade conditions, resulting

35891URrpt Rev1                                    12

Page 17

in some degree of differential deflection, and potential cracking of the floor slabs. If this cannot be accepted,
then the floor slabs should be suspended (and provided with void formers) as described in Section 6.7 above.

The following earthworks recommendations should be complemented by reference to AS3798-2007
“Guidelines on Earthworks for Commercial and Residential Developments”.



6.8.1 Subgrade Preparation
Prior to placement of engineered fill for treatment of poor subgrade areas and/or construction of on-grade
floor slabs, the soil subgrade should be prepared as follows:
   Following removal of any existing paved surfaces, and stripping of topsoil and/or any root affected soils,
    any remaining poorly compacted fill should be removed, as directed by the geotechnical engineer.
   Proof roll the soil subgrade with a minimum 2 tonne deadweight smooth drum roller, using the static
    (non-vibration) mode, following thorough moistening of the sand subgrade. Where access is restricted,
    proof rolling is expected to require the use of a hand-held plate/sled compactor.
   If soil softening occurs after rainfall, then the clay subgrade should be over-excavated to below the depth
    of moisture softening and replaced with engineered fill. Conversely, if a clayey subgrade exhibits
    shrinkage cracking, then the surface should be lightly watered and rolled until the shrinkage cracks are
    no longer evident.
   Proof rolling should be closely monitored by the geotechnical engineer to detect soft or unstable areas
    which should be removed and replaced with engineered fill (as outlined below). Care should be taken
    not to over-compact the clayey subgrade.
   Care should also be taken when using vibrating equipment not to cause damage to any adjacent
    structures. The vibrations should be qualitatively monitored by site personnel and if there is any cause
    for concern then proof rolling should cease and further advice sought.



6.8.2 Drainage During Construction
The subgrade will comprise clay soils which may be found to be unstable if proper site drainage is not
implemented during construction. It is therefore important to provide good drainage in order to promote
run-off and reduce ponding. Earthworks platforms should be graded to maintain cross-falls during
construction. If the clays are exposed to periods of rainfall, softening may result and site trafficability will be
poor. If softening occurs, the subgrade should be over-excavated to below the depth of moisture softening.
The material removed should be replaced with engineered fill. Trafficability may be improved by the use of
a sacrificial surface layer of crushed demolition rubble.



6.8.3 Engineered Fill
For treatment of any poor subgrade areas and backfill to retaining walls, engineered fill should be used.

Engineered fill should be free from organic materials, other contaminants and deleterious substances and
have a maximum particle size not exceeding 40mm. The locally excavated clays may be used as engineered

35891URrpt Rev1                                     13

Page 18

fill but would most likely require moisture conditioning which could result in delays. Also there may be a
shortfall in site won materials and imported fill would be required.

We recommend that engineered fill comprising well graded imported granular materials such as demolition
rubble would be suitable for treatment of poor subgrade areas and for backfilling retaining walls. The
imported engineered fill must be free of contaminants or deleterious substances and has a maximum particle
size not exceeding 40mm. Imported well graded granular fill should be compacted to at least 98% of SMDD
and within 2% of their SOMC. The compaction requirement may be reduced to 95% of SMDD in landscaped
areas, where settlement can be tolerated. Such fill should be compacted in horizontal layers as described
above. Care will be required to ensure excessive compaction stresses are not transferred to the retaining
walls.

Density tests should be carried out at the frequencies outlined in AS3798 (Table 8.1) for the volume of fill
involved. At least Level 2 testing of earthworks should be carried out in accordance with AS3798. Any areas
of insufficient compaction will require reworking.

As an alternative, single sized granular material (or ‘no fines’ gravel) may be used as backfill to the landscape
retaining walls and this would also act as the drainage behind the wall and would only require nominal
compaction (with no compaction testing). The drainage material should be wrapped in a non-woven
geotextile fabric (e.g. Bidim A34) to act as a filter against subsoil erosion. Further, retaining wall backfill
should be provided with a cap of at least 0.3m thickness of compacted crushed sandstone or clay at surface
level to reduce the likelihood of surface water surcharging the retaining wall.



6.9    Wastewater Treatment and Disposal
We note that the ASI “Site Soil Evaluation” report as recommended the following method of on-site effluent
disposal comprise an Advanced Secondary Treatment with an Advanced Enviro Septic System (AES)
Transpiration Bed.

For further details refer to the ASI “Site and Soil Evaluation” report.



6.10 Overall Effect of Development on Stability
We do not consider that the development will have any detrimental impact on the stability of the site. This
is on condition that the design and construction of the proposed development is completed in accordance
with the geotechnical advice presented in this report.



7     CONCLUSION
We consider that the site is suitable for the proposed development.




35891URrpt Rev1                                    14

Page 19

The geotechnical advice presented in the preceding sections of this report are intended to achieve
“Acceptable” levels of risk of instability of the site and to control future risks. The above recommendations
address geotechnical issues only and other conditions may be required to address other aspects.



8    GENERAL COMMENTS
The recommendations presented in this report include specific issues to be addressed during the
construction phase of the project. As an example, special treatment of soft spots may be required as a result
of their discovery during proof-rolling, etc. In the event that any of the construction phase recommendations
presented in this report are not implemented, the general recommendations may become inapplicable and
JK Geotechnics accept no responsibility whatsoever for the performance of the structure where
recommendations are not implemented in full and properly tested, inspected and documented.

Occasionally, the subsurface conditions between and below the boreholes and DCP tests completed by ASI
may be found to be different (or may be interpreted to be different) from those expected. Variation can also
occur with groundwater conditions, especially after climatic changes. If such differences appear to exist, we
recommend that you immediately contact this office.

This report provides advice on geotechnical aspects for the proposed civil and structural design. As part of
the documentation stage of this project, Contract Documents and Specifications may be prepared based on
our report. However, there may be design features we are not aware of or have not commented on for a
variety of reasons. The designers should satisfy themselves that all the necessary advice has been obtained.
If required, we could be commissioned to review the geotechnical aspects of contract documents to confirm
the intent of our recommendations has been correctly implemented.

A waste classification is required for any soil and/or bedrock excavated from the site prior to offsite disposal.
Subject to the appropriate testing, material can be classified as Virgin Excavated Natural Material (VENM),
Excavated Natural Material (ENM), General Solid, Restricted Solid or Hazardous Waste. Analysis can take up
to seven to ten working days to complete, therefore, an adequate allowance should be included in the
construction program unless testing is completed prior to construction. If contamination is encountered,
then substantial further testing (and associated delays) could be expected. We strongly recommend that this
requirement is addressed prior to the commencement of excavation on site.

This report has been prepared for the particular project described and no responsibility is accepted for the
use of any part of this report in any other context or for any other purpose. If there is any change in the
proposed development described in this report then all recommendations should be reviewed. Copyright in
this report is the property of JK Geotechnics. We have used a degree of care, skill and diligence normally
exercised by consulting engineers in similar circumstances and locality. No other warranty expressed or
implied is made or intended. Subject to payment of all fees due for the investigation, the client alone shall
have a licence to use this report. The report shall not be reproduced except in full.




35891URrpt Rev1                                    15

Page 20

Reference 1:   Australian Geomechanics Society (2007c) ‘Practice Note Guidelines for Landslide Risk Management’,
               Australian Geomechanics, Vol 42, No 1, March 2007, pp63-114.




35891URrpt Rev1                                    16

Page 21

                                                                                                              TABLE A
                                                                                              SUMMARY OF RISK ASSESSMENT TO PROPERTY


 POTENTIAL LANDSLIDE                              Existing Conditions                                             Following Construction and Implementation of Recommendations in Section 6 of the Report
 HAZARD
                                  1                        2                        3                         1                        2                        3                         4                        5
                            Deep seated           Near Surface Creep      Instability of existing       Deep seated           Near Surface Creep      Instability of existing       Instability of        Instability of new
                             instability            of the steeper           retaining walls             instability            of the steeper           retaining walls             temporary              retaining walls
                                                  section of the site                                                         section of the site                                excavation batters

 Assessed Likelihood            Rare                 Almost Certain              Unlikely                    Rare                Almost Certain              Unlikely                 Unlikely                 Unlikely

 Assessed Consequence           Minor                 Insignificant               Minor                   Medium                  Insignificant               Minor                    Minor                   Medium

 Risk                         Very Low                    Low                      Low                       Low                      Low                      Low                      Low                      Low

 Comments                Instability affecting      Slow moving only      Localised section of       Instability affecting      Slow moving only      Localised section of      Localised instability.   Localised instability.
                        the soil profile within   impacting a localised    retaining wall and       the soil profile within   impacting a localised    retaining wall and                                 Assumes walls are
                                                                                                                                                                                       Assumed
                               the site.           steeper portion of        small volume                  the site.           steeper portion of        small volume                                     engineer designed.
                                                                                                                                                                                recommended batter
                                                        the site.              instability.                                         the site.              instability.
                                                                                                                                                                                slopes are carried out
                                                                           Assumes walls are                                                            Assumes walls are         in accordance with
                                                                           engineer designed.                                                          removed as part of          the advice in our
                                                                                                                                                      the works and/or site             report.
                                                                                                                                                           maintenance
                                                                                                                                                            measures
                                                                                                                                                          implemented.




35891UR TABLE A

Page 22

                                                                                                                              SITE




                                                                      SOURCE: http://www.whereis.com/




                                                                                                                                                                          SITE

                                                                                                                             WOONG
                                                                                                                                             AR STR
                                                                                                                                                    E      ET
DWG FILE: J:\6F GEOTECHNICAL JOBS\35000'S\35891\CAD\35891UR.DWG




                                                                                                                                                                              ET
                                                                                                                                                                            R STRE
                                                                                                                                                                           HECTO




                                                                    AERIAL IMAGE SOURCE: MAPS.AU.NEARMAP.COM                                  Title:
                                                                                                                                                                   SITE LOCATION PLAN
PLOT DATE: 28/03/2023 10:08:32 AM




                                                                                                                                              Location:
                                                                                                                                                            20 WOONGAR STREET, BOREEN POINT, QLD
                                                                                                                                              Report No:                                Figure No:
                                                                                                                                                                35891UR                              1
                                                                   This plan should be read in conjunction with the JK Geotechnics report.

                                                                  © JK GEOTECHNICS

Page 23

                                                                                                                                 ROCK FACING
                                                                                                                                                                                                  BUSHLAND

                                                                                                                                                               ≈30°




                                                                                                                                                         MAX ≈30°




                                                                                                                                                         ≈5°-10°
                                                                                                                                                                                                          MAX ≈5°



                                                                                                                                                                                                                                                            ≈5°

                                                                                                                                                                           ≈25°




                                                                                                                                                                                                         ≈40°

                                                                                                                                                                              0.6m
                                                                                                                                                                                                                                                   OVERGROWN




                                                                                                                                APPROXIMATE OUTLINE OF
                                                                                                                          PROPOSED GROUND FLOOR LEVEL




                                                                                                                                                                       FLAT
                                                                                                                                                                      GRASS
                                                                                                                                               ≈2°                                                                                                          FLAT
DWG FILE: J:\6F GEOTECHNICAL JOBS\35000'S\35891\CAD\35891UR.DWG




                                                                                                                                                                                             WOONGAR STREET
PLOT DATE: 28/03/2023 10:10:04 AM




                                                                                                                                                                                                                                                   Title:
                                                                                                                                                                                                                                                                   GEOTECHNICAL SITE PLAN
                                                                                                                                                                                                                                                   Location:
                                                                        NOTE:                                                                                                 0         2         4          6          8         10                               20 WOONGAR STREET, BOREEN POINT, QLD
                                                                        REFER TO FIGURE 3 FOR GEOTECHNICAL MAPPING SYMBOLS.
                                                                                                                                                                              SCALE                   1:200 @A3              METRES                Report No:                                  Figure No:
                                                                                                                                                                                                                                                                   35891UR                                  2
                                                                                                                                                                         This plan should be read in conjunction with the JK Geotechnics report.

                                                                  © JK GEOTECHNICS

Page 24

DWG FILE: J:\6F GEOTECHNICAL JOBS\35000'S\35891\CAD\35891UR.DWG




                                                                                                                                             Title:
                                                                                                                                                      GEOTECHNICAL MAPPING SYMBOLS
PLOT DATE: 28/03/2023 10:08:47 AM




                                                                                                                                             Location:
                                                                                                                                                          20 WOONGAR STREET, BOREEN POINT, QLD
                                                                                                                                             Report No:                               Figure No:
                                                                                                                                                          35891UR                                  3
                                                                   This plan should be read in conjunction with the JK Geotechnics report.

                                                                  © JK GEOTECHNICS

Page 25

APPENDIX A


LANDSLIDE RISK
MANAGEMENT
TERMINOLOGY


[OCR of page images]
APPENDIX A

 

LANDSLIDE RISK
MANAGEMENT
TERMINOLOGY

Page 26

                                    LANDSLIDE RISK MANAGEMENT
                                  Definition of Terms and Landslide Risk

 Risk Terminology          Description
 Acceptable Risk           A risk for which, for the purposes of life or work, we are prepared to accept as it is with no regard to its
                           management. Society does not generally consider expenditure in further reducing such risks justifiable.
 Annual Exceedance         The estimated probability that an event of specified magnitude will be exceeded in any year.
 Probability (AEP)
 Consequence               The outcomes or potential outcomes arising from the occurrence of a landslide expressed qualitatively
                           or quantitatively, in terms of loss, disadvantage or gain, damage, injury or loss of life.
 Elements at Risk          The population, buildings and engineering works, economic activities, public services utilities,
                           infrastructure and environmental features in the area potentially affected by landslides.
 Frequency                 A measure of likelihood expressed as the number of occurrences of an event in a given time. See also
                           ‘Likelihood’ and ‘Probability’.
 Hazard                    A condition with the potential for causing an undesirable consequence (the landslide). The description
                           of landslide hazard should include the location, volume (or area), classification and velocity of the
                           potential landslides and any resultant detached material, and the likelihood of their occurrence within
                           a given period of time.
 Individual Risk to Life   The risk of fatality or injury to any identifiable (named) individual who lives within the zone impacted
                           by the landslide; or who follows a particular pattern of life that might subject him or her to the
                           consequences of the landslide.
 Landslide Activity        The stage of development of a landslide; pre failure when the slope is strained throughout but is
                           essentially intact; failure characterised by the formation of a continuous surface of rupture; post failure
                           which includes movement from just after failure to when it essentially stops; and reactivation when the
                           slope slides along one or several pre-existing surfaces of rupture. Reactivation may be occasional
                           (eg. seasonal) or continuous (in which case the slide is ‘active’).
 Landslide Intensity       A set of spatially distributed parameters related to the destructive power of a landslide. The parameters
                           may be described quantitatively or qualitatively and may include maximum movement velocity, total
                           displacement, differential displacement, depth of the moving mass, peak discharge per unit width, or
                           kinetic energy per unit area.
 Landslide Risk            The AGS Australian GeoGuide LR7 (AGS, 2007e) should be referred to for an explanation of Landslide
                           Risk.
 Landslide                 The classification, and volume (or area) of landslides which exist or potentially may occur in an area or
 Susceptibility            may travel or retrogress onto it. Susceptibility may also include a description of the velocity and
                           intensity of the existing or potential landsliding.
 Likelihood                Used as a qualitative description of probability or frequency.
 Probability               A measure of the degree of certainty. This measure has a value between zero (impossibility) and 1.0
                           (certainty). It is an estimate of the likelihood of the magnitude of the uncertain quantity, or the
                           likelihood of the occurrence of the uncertain future event.
                           These are two main interpretations:
                           (i) Statistical – frequency or fraction – The outcome of a repetitive experiment of some kind like
                               flipping coins. It includes also the idea of population variability. Such a number is called an
                               ‘objective’ or relative frequentist probability because it exists in the real world and is in principle
                               measurable by doing the experiment.




February 2019

Page 27

 Risk Terminology             Description
 Probability                  (ii) Subjective probability (degree of belief) – Quantified measure of belief, judgment, or confidence
 (continued)                       in the likelihood of an outcome, obtained by considering all available information honestly, fairly,
                                   and with a minimum of bias. Subjective probability is affected by the state of understanding of a
                                   process,                judgment               regarding               an              evaluation,
                                   or the quality and quantity of information. It may change over time as the state of knowledge
                                   changes.
 Qualitative Risk             An analysis which uses word form, descriptive or numeric rating scales to describe the magnitude of
 Analysis                     potential consequences and the likelihood that those consequences will occur.
 Quantitative Risk            An analysis based on numerical values of the probability, vulnerability and consequences and resulting
 Analysis                     in a numerical value of the risk.
 Risk                         A measure of the probability and severity of an adverse effect to health, property or the environment.
                              Risk is often estimated by the product of probability x consequences. However, a more general
                              interpretation of risk involves a comparison of the probability and consequences in a non-product form.
 Risk Analysis                The use of available information to estimate the risk to individual, population, property, or the
                              environment, from hazards. Risk analyses generally contain the following steps: scope definition,
                              hazard identification and risk estimation.
 Risk Assessment              The process of risk analysis and risk evaluation.
 Risk Control or Risk         The process of decision-making for managing risk and the implementation or enforcement of risk
 Treatment                    mitigation measures and the re-evaluation of its effectiveness from time to time, using the results of
                              risk assessment as one input.
 Risk Estimation              The process used to produce a measure of the level of health, property or environmental risks being
                              analysed. Risk estimation contains the following steps: frequency analysis, consequence analysis and
                              their integration.
 Risk Evaluation              The stage at which values and judgments enter the decision process, explicitly or implicitly, by including
                              consideration of the importance of the estimated risks and the associated social, environmental and
                              economic consequences, in order to identify a range of alternatives for managing the risks.
 Risk Management              The complete process of risk assessment and risk control (or risk treatment).
 Societal Risk                The risk of multiple fatalities or injuries in society as a whole: one where society would have to carry
                              the burden of a landslide causing a number of deaths, injuries, financial, environmental and other
                              losses.
 Susceptibility               See ‘Landslide Susceptibility’.
 Temporal Spatial             The probability that the element at risk is in the area affected by the landsliding, at the time of the
 Probability                  landslide.
 Tolerable Risk               A risk within a range that society can live with so as to secure certain net benefits. It is a range of risk
                              regarded as non-negligible and needing to be kept under review and reduced further if possible.
 Vulnerability                The degree of loss to a given element or set of elements within the area affected by the landslide
                              hazard. It is expressed on a scale of 0 (no loss) to 1 (total loss). For property, the loss will be the value
                              of the damage relative to the value of the property; for persons, it will be the probability that a
                              particular life (the element at risk) will be lost, given the person(s) is affected by the landslide.
NOTE:           Reference should be made to Figure A1 which shows the inter-relationship of many of these terms and the
                relevant portion of Landslide Risk Management.

                Reference should also be made to the paper referenced below for Landslide Terminology and more detailed
                discussion of the above terminology.

This appendix is an extract from PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT as presented in Australian
Geomechanics, Vol 42, No 1, March 2007, which discusses the matter more fully.



February 2019

Page 28

        FIGURE A1: Flowchart for Landslide Risk Management.

This figure is an extract from GUIDELINE FOR LANDSLIDE SUSCEPTIBILITY, HAZARD AND RISK ZONING FOR LAND USE
PLANNING, as presented in Australian Geomechanics Vol 42, No 1, March 2007, which discusses the matter more fully.


February 2019

Page 29

                                                   TABLE A1: LANDSLIDE RISK ASSESSMENT
                                      QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY
QUALITATIVE MEASURES OF LIKELIHOOD
   Approximate Annual Probability
   Indicative         Notional          Implied Indicative Landslide Recurrence Interval                                Description                                      Descriptor            Level
     Value            Boundary
      10-1                                     10 years                                   The event is expected to occur over the design life.                      ALMOST CERTAIN              A
                     510-2                                       20 years
                                                                                          The event will probably occur under adverse conditions over the
      10 -2                                   100 years                                                                                                             LIKELY                      B
                                                                                          design life.
                     510 -3                                      200 years
                                                                                          The event could occur under adverse conditions over the design
      10-3                                   1000 years                                                                                                             POSSIBLE                    C
                     510 -4                                                              life.
                                                                  2000 years
                                                                                          The event might occur under very adverse circumstances over the
      10-4                                  10,000 years                                                                                                            UNLIKELY                    D
                          -5                                                              design life.
                     510                                         20,000 years
         -5                                                                               The event is conceivable but only under exceptional circumstances
      10                                   100,000 years                                                                                                            RARE                        E
                          -2
                                                                                          over the design life.
                     510                                         200,000 years
      10-6                                1,000,000 years                                 The event is inconceivable or fanciful over the design life.              BARELY CREDIBLE              F
Note: (1)     The table should be used from left to right; use Approximate Annual Probability or Description to assign Descriptor, not vice versa.

QUALITATIVE MEASURES OF CONSEQUENCES TO PROPERTY
   Approximate cost of Damage
    Indicative       Notional                                                                Description                                                                 Descriptor            Level
      Value         Boundary
                                  Structure(s) completely destroyed and/or large scale damage requiring major engineering works for stabilisation. Could
       200%                                                                                                                                                       CATASTROPHIC                  1
                      100%        cause at least one adjacent property major consequence damage.
                                  Extensive damage to most of structure, and/or extending beyond site boundaries requiring significant stabilisation works.
       60%                                                                                                                                                        MAJOR                         2
                       40%        Could cause at least one adjacent property medium consequence damage.
                                  Moderate damage to some of structure, and/or significant part of site requiring large stabilisation works. Could cause at
       20%                                                                                                                                                        MEDIUM                        3
                       10%        least one adjacent property minor consequence damage.
        5%                        Limited damage to part of structure, and/or part of site requiring some reinstatement stabilisation works.                      MINOR                         4
                        1%        Little damage. (Note for high probability event (Almost Certain), this category may be subdivided at a notional boundary of
      0.5%                                                                                                                                                        INSIGNIFICANT                 5
                                  0.1%. See Risk Matrix.)
Notes: (2)      The Approximate Cost of Damage is expressed as a percentage of market value, being the cost of the improved value of the unaffected property which includes the land plus the
                unaffected structures.
          (3)   The Approximate Cost is to be an estimate of the direct cost of the damage, such as the cost of reinstatement of the damaged portion of the property (land plus structures), stabilisation
                works required to render the site to tolerable risk level for the landslide which has occurred and professional design fees, and consequential costs such as legal fees, temporary
                accommodation. It does not include additional stabilisation works to address other landslides which may affect the property.
          (4)   The table should be used from left to right; use Approximate Cost of Damage or Description to assign Descriptor, not vice versa.
Extract from PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT as presented in Australian Geomechanics, Vol 42, No 1, March 2007, which discusses the matter more fully.
February 2019

Page 30

                                                TABLE A1: LANDSLIDE RISK ASSESSMENT
                              QUALITATIVE TERMINOLOGY FOR USE IN ASSESSING RISK TO PROPERTY (continued)
QUALITATIVE RISK ANALYSIS MATRIX – LEVEL OF RISK TO PROPERTY
                               LIKELIHOOD                                                   CONSEQUENCES TO PROPERTY (With Indicative Approximate Cost of Damage)
                                         Indicative Value of            1: CATASTROPHIC                 2: MAJOR                  3: MEDIUM             4: MINOR           5: INSIGNIFICANT
                                        Approximate Annual                    200%                          60%                      20%                    5%                    0.5%
                                             Probability
 A – ALMOST CERTAIN                              10-1                          VH                            VH                       VH                     H                  M or L (5)
 B - LIKELY                                      10-2                          VH                            VH                        H                    M                       L
 C - POSSIBLE                                    10-3                          VH                            H                        M                     M                      VL
 D - UNLIKELY                                    10-4                           H                            M                         L                     L                     VL
 E - RARE                                        10-5                          M                              L                        L                    VL                     VL
 F - BARELY CREDIBLE                             10-6                           L                            VL                       VL                    VL                     VL
Notes: (5)  Cell A5 may be subdivided such that a consequence of less than 0.1% is Low Risk.
       (6)  When considering a risk assessment it must be clearly stated whether it is for existing conditions or with risk control measures which may not be implemented at the current time.

RISK LEVEL IMPLICATIONS
                              Risk Level                                                                                    Example Implications (7)
                                                                         Unacceptable without treatment. Extensive detailed investigation and research, planning and implementation of treatment
             VH                          VERY HIGH RISK                  options essential to reduce risk to Low; may be too expensive and not practical. Work likely to cost more than value of the
                                                                         property.
                                                                         Unacceptable without treatment. Detailed investigation, planning and implementation of treatment options required to reduce
             H                             HIGH RISK
                                                                         risk to Low. Work would cost a substantial sum in relation to the value of the property.
                                                                         May be tolerated in certain circumstances (subject to regulator’s approval) but requires investigation, planning and
             M                          MODERATE RISK                    implementation of treatment options to reduce the risk to Low. Treatment options to reduce to Low risk should be implemented
                                                                         as soon as practicable.
                                                                         Usually acceptable to regulators. Where treatment has been required to reduce the risk to this level, ongoing maintenance is
              L                             LOW RISK
                                                                         required.
             VL                          VERY LOW RISK                   Acceptable. Manage by normal slope maintenance procedures.
Note:      (7)     The implications for a particular situation are to be determined by all parties to the risk assessment and may depend on the nature of the property at risk; these are only given as a
           general guide.

Extract from PRACTICE NOTE GUIDELINES FOR LANDSLIDE RISK MANAGEMENT as presented in Australian Geomechanics, Vol 42, No 1, March 2007, which discusses the matter more fully.




February 2019

Page 31

                                   AUSTRALIAN GEOGUIDE LR2 (LANDSLIDES)
What is a Landslide?

Any movement of a mass of rock, debris, or earth, down a slope, constitutes a “landslide”. Landslides take many forms, some of
which are illustrated. More information can be obtained from Geoscience Australia, or by visiting its Australian landslide Database
at www.ga.gov.au/urban/factsheets/landslide.jsp. Aspects of the impact of landslides on buildings are dealt with in the book
“Guideline Document Landslide Hazards” published by the Australian Building Codes Board and referenced in the Building Code of
Australia. This document can be purchased over the internet at the Australian Building Codes Board’s website www.abcb.gov.au.

Landslides vary in size. They can be small and localised or very large, sometimes extending for kilometres and involving millions of
tonnes of soil or rock. It is important to realise that even a 1 cubic metre boulder of soil, or rock, weighs at least 2 tonnes. If it falls,
or slides, it is large enough to kill a person, crush a car, or cause serious structural damage to a house. The material in a landslide
may travel downhill well beyond the point where the failure first occurred, leaving destruction in its wake. It may also leave an
unstable slope in the ground behind it, which has the potential to fall again, causing the landslide to extend (regress) uphill, or expand
sideways. For all these reasons, both “potential” and “actual” landslides must be taken very seriously. The present a real threat to
life and property and require proper management.

Identification of landslide risk is a complex task and must be undertaken by a geotechnical practitioner (GeoGuide LR1) with specialist
experience in slope stability assessment and slope stabilisation.

What Causes a Landslide?

Landslides occur as a result of local geological and groundwater conditions, but can be exacerbated by inappropriate development
(GeoGuide LR8), exceptional weather, earthquakes and other factors. Some slopes and cliffs never seem to change, but are actually
on the verge of failing. Others, often moderate slopes (Table 1), move continuously, but so slowly that it is not apparent to a casual
observer. In both cases, small changes in conditions can trigger a landslide with series consequences. Wetting up of the ground (which
may involve a rise in groundwater table) is the single most important cause of landslides (GeoGuide LR5). This is why they often
occur during, or soon after, heavy rain. Inappropriate development often results in small scale landslides which are very expensive
in human terms because of the proximity of housing and people.

Does a Landslide Affect You?

Any slope, cliff, cutting, or fill embankment may be a hazard which has the potential to impact on people, property, roads and
services. Some tell-tale signs that might indicate that a landslide is occurring are listed below:

     Open cracks, or steps, along contours                          trees leaning down slope, or with exposed roots
     Groundwater seepage, or springs                                debris/fallen rocks at the foot of a cliff
     Bulging in the lower part of the slope                         tilted power poles, or fences
     Hummocky ground                                                cracked or distorted structures

These indications of instability may be seen on almost any slope and are not necessarily confined to the steeper ones (Table 1).
Advice should be sought from a geotechnical practitioner if any of them are observed. Landslides do not respect property boundaries.
As mentioned above they can “run-out” from above, “regress” from below, or expand sideways, so a landslide hazard affecting your
property may actually exist on someone else’s land.

Local councils are usually aware of slope instability problems within their jurisdiction and often have specific development and
maintenance requirements. Your local council is the first place to make enquiries if you are responsible for any sort of development
or own or occupy property on or near sloping land or a cliff.

TABLE 1 – Slope Descriptions
                                  Slope         Maximum
    Appearance                    Angle         Gradient        Slope Characteristics
    Gentle                       0 - 10        1 on 6         Easy walking.
    Moderate                     10 - 18       1 on 3         Walkable. Can drive and manoeuvre a car on driveway.
    Steep                        18 - 27       1 on 2         Walkable with effort. Possible to drive straight up or down roughened
                                                                concrete driveway, but cannot practically manoeuvre a car.
    Very Steep                   27 - 45         1 on 1       Can only climb slope by clutching at vegetation, rocks, etc.
    Extreme                      45 - 64        1 on 0.5      Need rope access to climb slope.
    Cliff                        64 - 84        1 on 0.1      Appears vertical. Can abseil down.
    Vertical or Overhang        84 - 90        Infinite      Appears to overhang. Abseiler likely to lose contact with the face.


February 2019

Page 32

Some typical landslides which could affect residential housing are illustrated below:

 Rotational or circular slip failures (Figure 1) - can occur on moderate
 to very steep soil and weathered rock slopes (Table 1). The sliding
 surface of the moving mass tends to be deep seated. Tension cracks
 may open at the top of the slope and bulging may occur at the toe.
 The ground may move in discrete "steps" separated by long periods
 without movement. More rapid movement may occur after heavy
 rain.                                                                                                     Figure 1

 Translational slip failures (Figure 2) - tend to occur on moderate to
 very steep slopes (Table 1) where soil, or weak rock, overlies stronger
 strata. The sliding mass is often relatively shallow. It can move, or
 deform slowly (creep) over long periods of time. Extensive linear
 cracks and hummocks sometimes form along the contours. The
 sliding mass may accelerate after heavy rain.


                                                                                                           Figure 2

 Wedge failures (Figure 3) - normally only occur on extreme slopes, or
 cliffs (Table 1), where discontinuities in the rock are inclined steeply
 downwards out of the face.

 Rock falls (Figure 3) - tend to occur from cliffs and overhangs (Table
 1).

 Cliffs may remain, apparently unchanged, for hundreds of years.
 Collections of boulders at the foot of a cliff may indicate that rock falls
 are ongoing. Wedge failures and rock falls do not "creep". Familiarity
 with a particular local situation can instil a false sense of security since
 failure, when it occurs, is usually sudden and catastrophic.
                                                                                                           Figure 3



 Debris flows and mud slides (Figure 4) - may occur in the foothills of
 ranges, where erosion has formed valleys which slope down to the
 plains below. The valley bottoms are often lined with loose eroded
 material (debris) which can "flow" if it becomes saturated during and
 after heavy rain. Debris flows are likely to occur with little warning;
 they travel a long way and often involve large volumes of soil. The
 consequences can be devastating.

                                                                                                           Figure 4

More information relevant to your particular situation may be found in other Australian GeoGuides:

          GeoGuide LR1     - Introduction                                         GeoGuide LR7 - Landslide Risk
          GeoGuide LR3     - Soil Slopes                                          GeoGuide LR8 - Hillside Construction
          GeoGuide LR4     - Rock Slopes                                          GeoGuide LR9 - Effluent & Surface Water Disposal
          GeoGuide LR5     - Water & Drainage                                     GeoGuide LR10 - Coastal Landslides
          GeoGuide LR6     - Retaining Walls                                      GeoGuide LR11 - Record Keeping


The Australian GeoGuides (LR series) are a set of publications intended for property owners; local councils; planning authorities; developers;
insurers; lawyers and, in fact, anyone who lives with, or has an interest in, a natural or engineered slope, a cutting, or an excavation. They
are intended to help you understand why slopes and retaining structures can be a hazard and what can be done with appropriate professional
advice and local council approval (if required) to remove, reduce, or minimise the risk they represent. The GeoGuides have been prepared
by the Australian Geomechanics Society, a specialist technical society within Engineers Australia, the national peak body for all engineering
disciplines in Australia, whose members are professional geotechnical engineers and engineering geologists with a particular interest in
ground engineering. The GeoGuides have been funded under the Australian governments’ National Disaster Mitigation Program.


February 2019

Page 33

                               AUSTRALIAN GEOGUIDE LR7 (LANDSLIDE RISK)

Concept of Risk                                                      for a particular site you should expect to receive a report
                                                                     prepared in accordance with current professional guidelines
Risk is a familiar term, but what does it really mean? It can be     and in a form that is acceptable to your local council, or
defined as "a measure of the probability and severity of an          planning authority.
adverse effect to health, property, or the environment." This
definition may seem a bit complicated. In relation to                Risk to Property
landslides, geotechnical practitioners (see GeoGuide LR1) are
required to assess risk in terms of the likelihood that a            Table 1 indicates the terms used to describe risk to property.
particular landslide will occur and the possible consequences.       Each risk level depends on an assessment of how likely a
This is called landslide risk assessment. The consequences of        landslide is to occur and its consequences in dollar terms.
a landslide are many and varied, but our concerns normally           “Likelihood” is the chance of it happening in any one year, as
focus on loss of, or damage to, property and loss of life.           indicated in Table 2. “Consequences” are related to the cost
                                                                     of the repairs and temporary loss of use if the landslide occurs.
Landslide Risk Assessment                                            These two factors are combined by the geotechnical
                                                                     practitioner to determine the Qualitative Risk.
Some local councils in Australia are aware of the potential for
landslides within their jurisdiction and have responded by           TABLE 2 – LIKELIHOOD
designating specific “landslide hazard zones". Development in         Likelihood                      Annual Probability
these areas is normally covered by special regulations. If you        Almost Certain                  1:10
are contemplating building, or buying an existing house,              Likely                          1:100
particularly in a hilly area, or near cliffs, then go first for       Possible                        1:1,000
information to your local council.                                    Unlikely                        1:10,000
                                                                      Rare                            1:100,000
Landslide risk assessment must be undertaken by a                     Barely credible                 1:1,000,000
geotechnical practitioner. It may involve visual inspection,
geological mapping, geotechnical investigation and                   The terms "unacceptable", "may be tolerable" etc. in Table 1
monitoring to identify:                                              indicate how most people react to an assessed risk level.
                                                                     However, some people will always be more prepared, or
     potential landslides (there may be more than one that          better able, to tolerate a higher risk level than others.
      could impact on your site);
     the likelihood that they will occur;                           Some local councils and planning authorities stipulate a
     the damage that could result;                                  maximum tolerable risk level of risk to property for
     the cost of disruption and repairs; and                        developments within their jurisdictions. In these situations
     the extent to which lives could be lost.                       the risk must be assessed by a geotechnical practitioner. If
                                                                     stabilisation works are needed to meet the stipulated
Risk assessment is a predictive exercise, but since the ground       requirements these will normally have to be carried out as
and the processes involved are complex, prediction tends to          part of the development, or consent will be withheld.
lack precision. If you commission a landslide risk assessment

TABLE 1 – RISK TO PROPERTY
 Qualitative Risk      Significance - Geotechnical engineering requirements
   Very high      VH   Unacceptable without treatment. Extensive detailed investigation and research, planning and
                       implementation of treatment options essential to reduce risk to Low. May be too expensive and not
                       practical. Work likely to cost more than the value of the property.
     High         H    Unacceptable without treatment. Detailed investigation, planning and implementation of treatment
                       options required to reduce risk to acceptable level. Work would cost a substantial sum in relation to the
                       value of the property.
  Moderate        M    May be tolerated in certain circumstances (subject to regulator's approval) but requires investigation,
                       planning and implementation of treatment options to reduce the risk to Low. Treatment options to
                       reduce to Low risk should be implemented as soon as possible.
     Low           L   Usually acceptable to regulators. Where treatment has been needed to reduce the risk to this level,
                       ongoing maintenance is required.
   Very Low       VL   Acceptable. Manage by normal slope maintenance procedures.




February 2019

Page 34

Risk to Life                                                                In NSW, the planning authorities consider that 1:1,000,000 is
                                                                            the maximum tolerable risk for domestic housing built near
Most of us have some difficulty grappling with the concept of               an obvious hazard, such as a chemical factory. Although not
risk and deciding whether, or not, we are prepared to accept                specifically considered in the NSW guidelines there is little
it. However, without doing any sort of analysis, or                         difference between the hazard presented by a neighbouring
commissioning a report from an "expert", we all take risks                  factory and a landslide: both have the capacity to destroy life
every day. One of them is the risk of being killed in an                    and property and both are always present.
accident. This is worth thinking about, because it tells us a lot
about ourselves and can help to put an assessed risk into a                 TABLE 3 – RISK TO LIFE
meaningful context. By identifying activities that we either                  Risk (deaths per     Activity/Event Leading to Death
are, or are not, prepared to engage in, we can get some                        participant per         (NSW data unless noted)
indication of the maximum level of risk that we are prepared                        year)
to take. This knowledge can help us to decide whether we
really are able to accept a particular risk, or to tolerate a
                                                                                1:1,000             Deep sea fishing (UK)
particular likelihood of loss, or damage, to our property
(Table 2).                                                                      1:1,000        to
                                                                                                    Motor cycling, horse riding, ultra-
                                                                                1:10,000
In Table 3, data from NSW for the years 1998 to 2002, and                                           light flying (Canada)
other sources, is presented. A risk of 1 in 100,000 means that,                                     Motor vehicle use
in any one year, 1 person is killed for every 100,000 people                    1:23,000
undertaking that particular activity. The NSW data assumes
that the whole population undertakes the activity. That is, we                  1:30,000            Fall
are all at risk of being killed in a fire, or of choking on our food,
but it is reasonable to assume that only people who go deep                     1:70,000            Drowning
sea fishing run a risk of being killed while doing it.
                                                                                1:180,000           Fire/burn
It can be seen that the risks of dying as a result of falling, using
a motor vehicle, or engaging in water-related activities                        1:660,000           Choking on food
(including bathing) are all greater than 1:100,000 and yet few
people actively avoid situations where these risks are present.                 1:1,000,000         Scheduled airlines (Canada)
Some people are averse to flying and yet it represents a lower
risk than choking to death on food. The data also indicate that,                1:2,300,000         Train travel
even when the risk of dying as a consequence of a particular
event is very small, it could still happen to any one of us today.              1:32,000,000        Lightning strike
If this were not so, there would be no risk at all and clearly
that is not the case.


More information relevant to your particular situation may be found in other Australian GeoGuides:

          GeoGuide LR1       - Introduction                                      GeoGuide LR7 - Landslide Risk
          GeoGuide LR3       - Soil Slopes                                       GeoGuide LR8 - Hillside Construction
          GeoGuide LR4       - Rock Slopes                                       GeoGuide LR9 - Effluent & Surface Water Disposal
          GeoGuide LR5       - Water & Drainage                                  GeoGuide LR10 - Coastal Landslides
          GeoGuide LR6       - Retaining Walls                                   GeoGuide LR11 - Record Keeping


The Australian GeoGuides (LR series) are a set of publications intended for property owners; local councils; planning authorities; developers;
insurers; lawyers and, in fact, anyone who lives with, or has an interest in, a natural or engineered slope, a cutting, or an excavation. They
are intended to help you understand why slopes and retaining structures can be a hazard and what can be done with appropriate professional
advice and local council approval (if required) to remove, reduce, or minimise the risk they represent. The GeoGuides have been prepared
by the Australian Geomechanics Society, a specialist technical society within Engineers Australia, the national peak body for all engineering
disciplines in Australia, whose members are professional geotechnical engineers and engineering geologists with a particular interest in
ground engineering. The GeoGuides have been funded under the Australian governments’ National Disaster Mitigation Program.




February 2019

Page 35

REPORT EXPLANATION NOTES
INTRODUCTION
These notes have been provided to amplify the geotechnical report          Cohesive soils are classified on the basis of strength (consistency)
in regard to classification methods, field procedures and certain          either by use of a hand penetrometer, vane shear, laboratory testing
matters relating to the Comments and Recommendations section.              and/or tactile engineering examination. The strength terms are
Not all notes are necessarily relevant to all reports.                     defined as follows.

The ground is a product of continuing natural and man-made                                       Unconfined               Indicative Undrained
processes and therefore exhibits a variety of characteristics and                                Compressive              Shear Strength (kPa)
properties which vary from place to place and can change with time.         Classification       Strength (kPa)
Geotechnical engineering involves gathering and assimilating limited
facts about these characteristics and properties in order to                Very Soft (VS)        25                      12
understand or predict the behaviour of the ground on a particular           Soft (S)             > 25 and  50            > 12 and  25
site under certain conditions. This report may contain such facts           Firm (F)             > 50 and  100           > 25 and  50
obtained by inspection, excavation, probing, sampling, testing or           Stiff (St)           > 100 and  200          > 50 and  100
other means of investigation. If so, they are directly relevant only to
the ground at the place where and time when the investigation was           Very Stiff (VSt)     > 200 and  400          > 100 and  200
carried out.                                                                Hard (Hd)            > 400                    > 200
                                                                            Friable (Fr)         Strength not attainable – soil crumbles

DESCRIPTION AND CLASSIFICATION METHODS                                     Rock types are classified by their geological names, together with
The methods of description and classification of soils and rocks used      descriptive terms regarding weathering, strength, defects, etc.
in this report are based on Australian Standard 1726:2017                  Where relevant, further information regarding rock classification is
‘Geotechnical Site Investigations’. In general, descriptions cover the     given in the text of the report. In the Sydney Basin, ‘shale’ is used to
following properties – soil or rock type, colour, structure, strength or   describe fissile mudstone, with a weakness parallel to bedding. Rocks
density, and inclusions. Identification and classification of soil and     with alternating inter-laminations of different grain size
rock involves judgement and the Company infers accuracy only to            (eg. siltstone/claystone and siltstone/fine grained sandstone) is
the extent that is common in current geotechnical practice.                referred to as ‘laminite’.
Soil types are described according to the predominating particle size
                                                                           SAMPLING
and behaviour as set out in the attached soil classification table
qualified by the grading of other particles present (eg. sandy clay) as    Sampling is carried out during drilling or from other excavations to
set out below:                                                             allow engineering examination (and laboratory testing where
                                                                           required) of the soil or rock.
 Soil Classification             Particle Size
                                                                           Disturbed samples taken during drilling provide information on
 Clay                            < 0.002mm                                 plasticity, grain size, colour, moisture content, minor constituents
 Silt                            0.002 to 0.075mm                          and, depending upon the degree of disturbance, some information
 Sand                            0.075 to 2.36mm                           on strength and structure. Bulk samples are similar but of greater
 Gravel                          2.36 to 63mm                              volume required for some test procedures.
 Cobbles                         63 to 200mm                               Undisturbed samples are taken by pushing a thin-walled sample tube,
 Boulders                        > 200mm                                   usually 50mm diameter (known as a U50), into the soil and
                                                                           withdrawing it with a sample of the soil contained in a relatively
Non-cohesive soils are classified on the basis of relative density,        undisturbed state. Such samples yield information on structure and
generally from the results of Standard Penetration Test (SPT) as           strength, and are necessary for laboratory determination of shrink-
below:                                                                     swell behaviour, strength and compressibility. Undisturbed sampling
                                                                           is generally effective only in cohesive soils.
                                 SPT ‘N’ Value                             Details of the type and method of sampling used are given on the
 Relative Density                (blows/300mm)                             attached logs.
 Very loose (VL)                 <4
 Loose (L)                       4 to 10
 Medium dense (MD)               10 to 30
 Dense (D)                       30 to 50
 Very Dense (VD)                 > 50




February 2019                                                        1

Page 36

INVESTIGATION METHODS                                                     Mud Stabilised Drilling: Either Wash Boring or Continuous Core
                                                                          Drilling can use drilling mud as a circulating fluid to stabilise the
The following is a brief summary of investigation methods currently
                                                                          borehole. The term ‘mud’ encompasses a range of products ranging
adopted by the Company and some comments on their use and
                                                                          from bentonite to polymers. The mud tends to mask the cuttings and
application. All methods except test pits, hand auger drilling and
                                                                          reliable identification is only possible from intermittent intact
portable Dynamic Cone Penetrometers require the use of a
                                                                          sampling (eg. from SPT and U50 samples) or from rock coring, etc.
mechanical rig which is commonly mounted on a truck chassis or
track base.
                                                                          Continuous Core Drilling: A continuous core sample is obtained
                                                                          using a diamond tipped core barrel. Provided full core recovery is
Test Pits: These are normally excavated with a backhoe or a tracked
                                                                          achieved (which is not always possible in very low strength rocks and
excavator, allowing close examination of the insitu soils and ‘weaker’
                                                                          granular soils), this technique provides a very reliable (but relatively
bedrock if it is safe to descend into the pit. The depth of penetration
                                                                          expensive) method of investigation. In rocks, NMLC or HQ triple tube
is limited to about 3m for a backhoe and up to 6m for a large
                                                                          core barrels, which give a core of about 50mm and 61mm diameter,
excavator. Limitations of test pits are the problems associated with
                                                                          respectively, is usually used with water flush. The length of core
disturbance and difficulty of reinstatement and the consequent
                                                                          recovered is compared to the length drilled and any length not
effects on close-by structures. Care must be taken if construction is
                                                                          recovered is shown as NO CORE. The location of NO CORE recovery
to be carried out near test pit locations to either properly recompact
                                                                          is determined on site by the supervising engineer; where the location
the backfill during construction or to design and construct the
                                                                          is uncertain, the loss is placed at the bottom of the drill run.
structure so as not to be adversely affected by poorly compacted
backfill at the test pit location.
                                                                          Standard Penetration Tests: Standard Penetration Tests (SPT) are
                                                                          used mainly in non-cohesive soils, but can also be used in cohesive
Hand Auger Drilling: A borehole of 50mm to 100mm diameter is
                                                                          soils, as a means of indicating density or strength and also of
advanced by manually operated equipment. Refusal of the hand
                                                                          obtaining a relatively undisturbed sample. The test procedure is
auger can occur on a variety of materials such as obstructions within
                                                                          described in Australian Standard 1289.6.3.1–2004 (R2016) ‘Methods
any fill, tree roots, hard clay, gravel or ironstone, cobbles and
                                                                          of Testing Soils for Engineering Purposes, Soil Strength and
boulders, and does not necessarily indicate rock level.
                                                                          Consolidation Tests – Determination of the Penetration Resistance of
                                                                          a Soil – Standard Penetration Test (SPT)’.
Continuous Spiral Flight Augers: The borehole is advanced using
75mm to 115mm diameter continuous spiral flight augers, which are         The test is carried out in a borehole by driving a 50mm diameter split
withdrawn at intervals to allow sampling and insitu testing. This is a    sample tube with a tapered shoe, under the impact of a 63.5kg
relatively economical means of drilling in clays and in sands above       hammer with a free fall of 760mm. It is normal for the tube to be
the water table. Samples are returned to the surface by the flights or    driven in three successive 150mm increments and the ‘N’ value is
may be collected after withdrawal of the auger flights, but they can      taken as the number of blows for the last 300mm. In dense sands,
be very disturbed and layers may become mixed. Information from           very hard clays or weak rock, the full 450mm penetration may not be
the auger sampling (as distinct from specific sampling by SPTs or         practicable and the test is discontinued.
undisturbed samples) is of limited reliability due to mixing or
                                                                          The test results are reported in the following form:
softening of samples by groundwater, or uncertainties as to the
original depth of the samples. Augering below the groundwater table          In the case where full penetration is obtained with successive
is of even lesser reliability than augering above the water table.            blow counts for each 150mm of, say, 4, 6 and 7 blows, as

Rock Augering: Use can be made of a Tungsten Carbide (TC) bit for                             N = 13
auger drilling into rock to indicate rock quality and continuity by                           4, 6, 7
variation in drilling resistance and from examination of recovered           In a case where the test is discontinued short of full penetration,
rock cuttings. This method of investigation is quick and relatively           say after 15 blows for the first 150mm and 30 blows for the next
inexpensive but provides only an indication of the likely rock strength       40mm, as
and predicted values may be in error by a strength order. Where rock                          N > 30
strengths may have a significant impact on construction feasibility or                        15, 30/40mm
costs, then further investigation by means of cored boreholes may
be warranted.                                                             The results of the test can be related empirically to the engineering
                                                                          properties of the soil.
Wash Boring: The borehole is usually advanced by a rotary bit, with       A modification to the SPT is where the same driving system is used
water being pumped down the drill rods and returned up the                with a solid 60 tipped steel cone of the same diameter as the SPT
annulus, carrying the drill cuttings. Only major changes in               hollow sampler. The solid cone can be continuously driven for some
stratification can be assessed from the cuttings, together with some      distance in soft clays or loose sands, or may be used where damage
information from “feel” and rate of penetration.                          would otherwise occur to the SPT. The results of this Solid Cone
                                                                          Penetration Test (SCPT) are shown as ‘Nc’ on the borehole logs,
                                                                          together with the number of blows per 150mm penetration.




February 2019                                                       2

Page 37

Cone Penetrometer Testing (CPT) and Interpretation:                       There are limitations when using the CPT in that it may not penetrate
The cone penetrometer is sometimes referred to as a Dutch Cone.           obstructions within any fill, thick layers of hard clay and very dense
The test is described in Australian Standard 1289.6.5.1–1999 (R2013)      sand, gravel and weathered bedrock. Normally a ‘dummy’ cone is
‘Methods of Testing Soils for Engineering Purposes, Soil Strength and     pushed through fill to protect the equipment. No information is
Consolidation Tests – Determination of the Static Cone Penetration        recorded by the ‘dummy’ probe.
Resistance of a Soil – Field Test using a Mechanical and Electrical
Cone or Friction-Cone Penetrometer’.                                      Flat Dilatometer Test: The flat dilatometer (DMT), also known as the
                                                                          Marchetti Dilometer comprises a stainless steel blade having a flat,
In the tests, a 35mm or 44mm diameter rod with a conical tip is
                                                                          circular steel membrane mounted flush on one side.
pushed continuously into the soil, the reaction being provided by a
specially designed truck or rig which is fitted with a hydraulic ram      The blade is connected to a control unit at ground surface by a
system. Measurements are made of the end bearing resistance on            pneumatic-electrical tube running through the insertion rods. A gas
the cone and the frictional resistance on a separate 134mm or             tank, connected to the control unit by a pneumatic cable, supplies
165mm long sleeve, immediately behind the cone. Transducers in            the gas pressure required to expand the membrane. The control unit
the tip of the assembly are electrically connected by wires passing       is equipped with a pressure regulator, pressure gauges, an audio-
through the centre of the push rods to an amplifier and recorder unit     visual signal and vent valves.
mounted on the control truck. The CPT does not provide soil sample
                                                                          The blade is advanced into the ground using our CPT rig or one of our
recovery.
                                                                          drilling rigs, and can be driven into the ground using an SPT hammer.
As penetration occurs (at a rate of approximately 20mm per second),       As soon as the blade is in place, the membrane is inflated, and the
the information is output as incremental digital records every 10mm.      pressure required to lift the membrane (approximately 0.1mm) is
The results given in this report have been plotted from the digital       recorded. The pressure then required to lift the centre of the
data.                                                                     membrane by an additional 1mm is recorded. The membrane is then
                                                                          deflated before pushing to the next depth increment, usually
The information provided on the charts comprise:
                                                                          200mm down. The pressure readings are corrected for membrane
 Cone resistance – the actual end bearing force divided by the           stiffness.
    cross sectional area of the cone – expressed in MPa. There are
    two scales presented for the cone resistance. The lower scale         The DMT is used to measure material index (ID), horizontal stress
    has a range of 0 to 5MPa and the main scale has a range of 0 to       index (KD), and dilatometer modulus (ED). Using established
    50MPa. For cone resistance values less than 5MPa, the plot will       correlations, the DMT results can also be used to assess the ‘at rest’
    appear on both scales.                                                earth pressure coefficient (Ko), over-consolidation ratio (OCR),
 Sleeve friction – the frictional force on the sleeve divided by the     undrained shear strength (Cu), friction angle (), coefficient of
    surface area – expressed in kPa.                                      consolidation (Ch), coefficient of permeability (Kh), unit weight (),
                                                                          and vertical drained constrained modulus (M).
 Friction ratio – the ratio of sleeve friction to cone resistance,
    expressed as a percentage.                                            The seismic dilatometer (SDMT) is the combination of the DMT with
                                                                          an add-on seismic module for the measurement of shear wave
    The ratios of the sleeve resistance to cone resistance will vary
                                                                          velocity (Vs). Using established correlations, the SDMT results can
    with the type of soil encountered, with higher relative friction in
                                                                          also be used to assess the small strain modulus (Go).
    clays than in sands. Friction ratios of 1% to 2% are commonly
    encountered in sands and occasionally very soft clays, rising to
                                                                          Portable Dynamic Cone Penetrometers: Portable Dynamic Cone
    4% to 10% in stiff clays and peats. Soil descriptions based on
                                                                          Penetrometer (DCP) tests are carried out by driving a 16mm
    cone resistance and friction ratios are only inferred and must not
                                                                          diameter rod with a 20mm diameter cone end with a 9kg hammer
    be considered as exact.
                                                                          dropping 510mm. The test is described in Australian Standard
Correlations between CPT and SPT values can be developed for both         1289.6.3.2–1997 (R2013) ‘Methods of Testing Soils for Engineering
sands and clays but may be site specific.                                 Purposes, Soil Strength and Consolidation Tests – Determination of
Interpretation of CPT values can be made to empirically derive            the Penetration Resistance of a Soil – 9kg Dynamic Cone
modulus or compressibility values to allow calculation of foundation      Penetrometer Test’.
settlements.                                                              The results are used to assess the relative compaction of fill, the
Stratification can be inferred from the cone and friction traces and      relative density of granular soils, and the strength of cohesive soils.
from experience and information from nearby boreholes etc. Where          Using established correlations, the DCP test results can also be used
shown, this information is presented for general guidance, but must       to assess California Bearing Ratio (CBR).
be regarded as interpretive. The test method provides a continuous        Refusal of the DCP can occur on a variety of materials such as
profile of engineering properties but, where precise information on       obstructions within any fill, tree roots, hard clay, gravel or ironstone,
soil classification is required, direct drilling and sampling may be      cobbles and boulders, and does not necessarily indicate rock level.
preferable.




February 2019                                                       3

Page 38

Vane Shear Test: The vane shear test is used to measure the                 GROUNDWATER
undrained shear strength (Cu) of typically very soft to firm fine
                                                                            Where groundwater levels are measured in boreholes, there are
grained cohesive soils. The vane shear is normally performed in the
                                                                            several potential problems:
bottom of a borehole, but can be completed from surface level, the
bottom and sides of test pits, and on recovered undisturbed tube                  Although groundwater may be present, in low permeability soils
samples (when using a hand vane).                                                  it may enter the hole slowly or perhaps not at all during the time
                                                                                   it is left open.
The vane comprises four rectangular blades arranged in the form of
                                                                                  A localised perched water table may lead to an erroneous
a cross on the end of a thin rod, which is coupled to the bottom of a
                                                                                   indication of the true water table.
drill rod string when used in a borehole. The size of the vane is
dependent on the strength of the fine grained cohesive soils; that is,            Water table levels will vary from time to time with seasons or
larger vanes are normally used for very low strength soils. For                    recent weather changes and may not be the same at the time of
borehole testing, the size of the vane can be limited by the size of the           construction.
casing that is used.                                                              The use of water or mud as a drilling fluid will mask any
For testing inside a borehole, a device is used at the top of the casing,          groundwater inflow. Water has to be blown out of the hole and
which suspends the vane and rods so that they do not sink under self-              drilling mud must be washed out of the hole or ‘reverted’
weight into the ‘soft’ soils beyond the depth at which the test is to              chemically if reliable water observations are to be made.
be carried out. A calibrated torque head is used to rotate the rods         More reliable measurements can be made by installing standpipes
and vane and to measure the resistance of the vane to rotation.             which are read after the groundwater level has stabilised at intervals
With the vane in position, torque is applied to cause rotation of           ranging from several days to perhaps weeks for low permeability
the vane at a constant rate. A rate of 6° per minute is the                 soils. Piezometers, sealed in a particular stratum, may be advisable
common rotation rate. Rotation is continued until the soil is               in low permeability soils or where there may be interference from
sheared and the maximum torque has been recorded. This value                perched water tables or surface water.
is then used to calculate the undrained shear strength. The vane
is then rotated rapidly a number of times and the operation                 FILL
repeated until a constant torque reading is obtained. This torque           The presence of fill materials can often be determined only by the
value is used to calculate the remoulded shear strength. Where              inclusion of foreign objects (eg. bricks, steel, etc) or by distinctly
appropriate, friction on the vane rods is measured and taken into           unusual colour, texture or fabric. Identification of the extent of fill
account in the shear strength calculation.                                  materials will also depend on investigation methods and frequency.
                                                                            Where natural soils similar to those at the site are used for fill, it may
LOGS                                                                        be difficult with limited testing and sampling to reliably assess the
The borehole or test pit logs presented herein are an engineering           extent of the fill.
and/or geological interpretation of the subsurface conditions, and          The presence of fill materials is usually regarded with caution as the
their reliability will depend to some extent on the frequency of            possible variation in density, strength and material type is much
sampling and the method of drilling or excavation. Ideally,                 greater than with natural soil deposits. Consequently, there is an
continuous undisturbed sampling or core drilling will enable the            increased risk of adverse engineering characteristics or behaviour. If
most reliable assessment, but is not always practicable or possible to      the volume and quality of fill is of importance to a project, then
justify on economic grounds. In any case, the boreholes or test pits        frequent test pit excavations are preferable to boreholes.
represent only a very small sample of the total subsurface conditions.
The terms and symbols used in preparation of the logs are defined in        LABORATORY TESTING
the following pages.                                                        Laboratory testing is normally carried out in accordance with
Interpretation of the information shown on the logs, and its                Australian Standard 1289 ‘Methods of Testing Soils for Engineering
application to design and construction, should therefore take into          Purposes’ or appropriate NSW Government Roads & Maritime
account the spacing of boreholes or test pits, the method of drilling       Services (RMS) test methods. Details of the test procedure used are
or excavation, the frequency of sampling and testing and the                given on the individual report forms.
possibility of other than ‘straight line’ variations between the
boreholes or test pits. Subsurface conditions between boreholes or          ENGINEERING REPORTS
test pits may vary significantly from conditions encountered at the         Engineering reports are prepared by qualified personnel and are
borehole or test pit locations.                                             based on the information obtained and on current engineering
                                                                            standards of interpretation and analysis. Where the report has been
                                                                            prepared for a specific design proposal (eg. a three storey building)
                                                                            the information and interpretation may not be relevant if the design
                                                                            proposal is changed (eg. to a twenty storey building). If this happens,
                                                                            the Company will be pleased to review the report and the sufficiency
                                                                            of the investigation work.




February 2019                                                         4

Page 39

Reasonable care is taken with the report as it relates to              be pleased to assist in this regard and/or to make additional report
interpretation of subsurface conditions, discussion of geotechnical    copies available for contract purposes at a nominal charge.
aspects and recommendations or suggestions for design and
                                                                       Copyright in all documents (such as drawings, borehole or test pit
construction. However, the Company cannot always anticipate or
                                                                       logs, reports and specifications) provided by the Company shall
assume responsibility for:
                                                                       remain the property of Jeffery and Katauskas Pty Ltd. Subject to the
   Unexpected variations in ground conditions – the potential for     payment of all fees due, the Client alone shall have a licence to use
    this will be partially dependent on borehole spacing and           the documents provided for the sole purpose of completing the
    sampling frequency as well as investigation technique.             project to which they relate. Licence to use the documents may be
   Changes in policy or interpretation of policy by statutory         revoked without notice if the Client is in breach of any obligation to
    authorities.                                                       make a payment to us.
   The actions of persons or contractors responding to commercial
    pressures.                                                         REVIEW OF DESIGN
   Details of the development that the Company could not              Where major civil or structural developments are proposed or where
    reasonably be expected to anticipate.                              only a limited investigation has been completed or where the
                                                                       geotechnical conditions/constraints are quite complex, it is prudent
If these occur, the Company will be pleased to assist with             to have a joint design review which involves an experienced
investigation or advice to resolve any problems occurring.             geotechnical engineer/engineering geologist.

SITE ANOMALIES                                                         SITE INSPECTION
In the event that conditions encountered on site during construction   The Company will always be pleased to provide engineering
appear to vary from those which were expected from the                 inspection services for geotechnical aspects of work to which this
information contained in the report, the Company requests that it      report is related.
immediately be notified. Most problems are much more readily
resolved when conditions are exposed rather than at some later         Requirements could range from:
stage, well after the event.                                           i)   a site visit to confirm that conditions exposed are no worse than
                                                                            those interpreted, to
REPRODUCTION OF INFORMATION FOR CONTRACTUAL                            ii) a visit to assist the contractor or other site personnel in
PURPOSES                                                                   identifying various soil/rock types and appropriate footing or
Where information obtained from this investigation is provided for         pile founding depths, or
tendering purposes, it is recommended that all information,            iii) full time engineering presence on site.
including the written report and discussion, be made available. In
circumstances where the discussion or comments section is not
relevant to the contractual situation, it may be appropriate to
prepare a specially edited document. The Company would




February 2019                                                    5

Page 40

                         SYMBOL LEGENDS

                SOIL                      ROCK




                       OTHER MATERIALS




February 2019               6


[OCR of page images]
 

SYMBOL LEGENDS

 

 

FILL

rvs

CLAY (CL, Cl, CH)

 

 

 

 

 

 

SILT (ML, MH)

 

 

 

 

 

SAND (SP, SW)

 

 

o>

N
g | GRAVEL (GP, GW)

 

 

SANDY CLAY (CL, Cl, CH)

 

 

SILTY CLAY (CL, Cl, CH)

 

 

CLAYEY SAND (SC)

 

 

SILTY SAND (SM)

 

 

 

GRAVELLY CLAY (CL, Cl, CH)

 

 

es CLAYEY GRAVEL (GC)

 

 

 

 

 

SANDY SILT (ML, MH)

 

 

 

 

 

PEAT AND HIGHLY ORGANIC SOILS (Pt)

 

OTHER MATERIALS

 

 

ae

*) CONCRETE

 

 

2

 

BRICKS OR PAVERS

ROCK

 

 

pO
°
be

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

| | ASPHALTIC CONCRETE

 

 

CONGLOMERATE

SANDSTONE

SHALE/MUDSTONE

SILTSTONE

CLAYSTONE

COAL

LAMINITE

LIMESTONE

PHYLLITE, SCHIST

TUFF

GRANITE, GABBRO

DOLERITE, DIORITE

BASALT, ANDESITE

QUARTZITE

 

 

 

February 2019

JKGeotechnics

Page 41

                                                                                                                                                                                                                       CLASSIFICATION OF COARSE AND FINE GRAINED SOILS
                                                                                                                                                                   Group
                                                                                      Major Divisions                                                             Symbol      Typical Names                            Field Classification of Sand and Gravel                                                         Laboratory Classification                              Laboratory Classification Criteria
                                                                                          GRAVEL (more                                                                                                                                                                                                                                                     A well graded coarse grained soil is one for which the coefficient of uniformity
                                                                                                                                                                   GW         Gravel and gravel-sand mixtures,         Wide range in grain size and substantial amounts of all intermediate sizes, not          ≤ 5% fines               Cu > 4
                                                                                                                                                                                                                                                                                                                                                           Cu > 4 and the coefficient of curvature 1 < Cc < 3. Otherwise, the soil is poorly
Coarse grainedsoil (more than 65%of soil excludingoversize fraction is




                                                                                          than half                                                                           little or no fines                       enough fines to bind coarse grains, no dry strength                                                               1 < Cc < 3
                                                                                          of coarse                                                                                                                                                                                                                                                        graded. These coefficients are given by:
                                                                                          fraction is larger                                                        GP        Gravel and gravel-sand mixtures,         Predominantly one size or range of sizes with some intermediate sizes missing,           ≤ 5% fines               Fails to comply
                                                                                                                                                                              little or no fines, uniform gravels      not enough fines to bind coarse grains, no dry strength                                                           with above                                                        (   )
                                                                                          than 2.36mm                                                                                                                                                                                                                                                                     =               and         =
                                                                                                                                                                   GM         Gravel-silt mixtures and gravel-         ‘Dirty’ materials with excess of non-plastic fines, zero to medium dry strength          ≥ 12% fines, fines       Fines behave as
                                                                                                                                                                              sand-silt mixtures                                                                                                                are silty                silt              Where D10, D30 and D60 are those grain sizes for which 10%, 30% and 60% of
                                                                                    greater than 0.075mm)




                                                                                                                                                                                                                                                                                                                                                           the soil grains, respectively, are smaller.
                                                                                                                                                                    GC        Gravel-clay mixtures and gravel-         ‘Dirty’ materials with excess of plastic fines, medium to high dry strength              ≥ 12% fines, fines       Fines behave as
                                                                                                                                                                              sand-clay mixtures                                                                                                                are clayey               clay
                                                                                                                                        SAND (more                  SW        Sand and gravel-sand mixtures,           Wide range in grain size and substantial amounts of all intermediate sizes, not          ≤ 5% fines               Cu > 6            NOTES:
                                                                                                                                        than half                             little or no fines                       enough fines to bind coarse grains, no dry strength                                                               1 < Cc < 3        1    For a coarse grained soil with a fines content between 5% and 12%,
                                                                                                                                        of coarse                                                                                                                                                                                                               the soil is given a dual classification comprising the two group symbols
                                                                                                                                        fraction                    SP        Sand and gravel-sand mixtures,           Predominantly one size or range of sizes with some intermediate sizes missing,           ≤ 5% fines               Fails to comply
                                                                                                                                                                                                                                                                                                                                                                separated by a dash; for example, for a poorly graded gravel with
                                                                                                                                        is smaller than                       little or no fines                       not enough fines to bind coarse grains, no dry strength                                                           with above             between 5% and 12% silt fines, the classification is GP-GM.
                                                                                                                                        2.36mm)                     SM        Sand-silt mixtures                       ‘Dirty’ materials with excess of non-plastic fines, zero to medium dry strength          ≥ 12% fines, fines                         2    Where the grading is determined from laboratory tests, it is defined by
                                                                                                                                                                                                                                                                                                                are silty                                       coefficients of curvature (Cc) and uniformity (Cu) derived from the
                                                                                                                                                                                                                                                                                                                                               N/A              particle size distribution curve.
                                                                                                                                                                    SC        Sand-clay mixtures                       ‘Dirty’ materials with excess of plastic fines, medium to high dry strength              ≥ 12% fines, fines                         3    Clay soils with liquid limits > 35% and ≤ 50% may be classified as being
                                                                                                                                                                                                                                                                                                                are clayey                                      of medium plasticity.
                                                                                                                                                                                                                                                                                                                                                           4    The U line on the Modified Casagrande Chart is an approximate upper
                                                                                                                                                                                                                                                                                                                                                                bound for most natural soils.
                                                                                                                                                                                                                                                                              Field Classification of                                Laboratory
                                                                                                                                                                                                                                                                                   Silt and Clay                                     Classification
                                                                                                                                                                            Group
                                                                                                                                       Major Divisions                     Symbol      Typical Names                                              Dry Strength                       Dilatancy                  Toughness            % < 0.075mm            Modified Casagrande Chart for Classifying Silts and Clays
                                                                                                                                                                                                                                                                                                                                                                         according to their Behaviour
                                                                                                                                              SILT and CLAY                 ML         Inorganic silt and very fine sand, rock flour, silty or    None to low                Slow to rapid               Low                         Below A line
                                ine grained soils (more than 35%of soil excluding




                                                                                                                                              (low to medium                           clayey fine sand or silt with low plasticity
                                                                                                                                              plasticity)
                                                                                             oversize fraction is less than 0.075mm)




                                                                                                                                                                           CL, CI      Inorganic clay of low to medium plasticity, gravelly       Medium to high             None to slow                Medium                      Above A line
                                                                                                                                                                                       clay, sandy clay

                                                                                                                                                                            OL         Organic silt                                               Low to medium              Slow                        Low                         Below A line

                                                                                                                                              SILT and CLAY                 MH         Inorganic silt                                             Low to medium              None to slow                Low to medium               Below A line
                                                                                                                                              (high plasticity)
                                                                                                                                                                            CH         Inorganic clay of high plasticity                          High to very high          None                        High                        Above A line

                                                                                                                                                                            OH         Organic clay of medium to high plasticity, organic         Medium to high             None to very slow           Low to medium               Below A line
                                                                                                                                                                                       silt

                                                                                                                                              Highly organic soil            Pt        Peat, highly organic soil                                  –                          –                           –                           –

                                                                                          February 2019                                                                                                                                                                          7

Page 42

                                                      LOG SYMBOLS
 Log Column                 Symbol          Definition

 Groundwater Record                         Standing water level. Time delay following completion of drilling/excavation may be shown.

                                            Extent of borehole/test pit collapse shortly after drilling/excavation.
                                 C
                                            Groundwater seepage into borehole or test pit noted during drilling or excavation.

 Samples                          ES        Sample taken over depth indicated, for environmental analysis.
                                 U50        Undisturbed 50mm diameter tube sample taken over depth indicated.
                                 DB         Bulk disturbed sample taken over depth indicated.
                                 DS         Small disturbed bag sample taken over depth indicated.
                                 ASB        Soil sample taken over depth indicated, for asbestos analysis.
                                 ASS        Soil sample taken over depth indicated, for acid sulfate soil analysis.
                                 SAL        Soil sample taken over depth indicated, for salinity analysis.
 Field Tests                 N = 17         Standard Penetration Test (SPT) performed between depths indicated by lines. Individual
                             4, 7, 10       figures show blows per 150mm penetration. ‘Refusal’ refers to apparent hammer refusal within
                                            the corresponding 150mm depth increment.
                          Nc =          5   Solid Cone Penetration Test (SCPT) performed between depths indicated by lines. Individual
                                        7   figures show blows per 150mm penetration for 60 solid cone driven by SPT hammer. ‘R’ refers
                                            to apparent hammer refusal within the corresponding 150mm depth increment.
                                       3R

                            VNS = 25        Vane shear reading in kPa of undrained shear strength.
                            PID = 100       Photoionisation detector reading in ppm (soil sample headspace test).

 Moisture Condition          w > PL         Moisture content estimated to be greater than plastic limit.
 (Fine Grained Soils)        w  PL         Moisture content estimated to be approximately equal to plastic limit.
                             w < PL         Moisture content estimated to be less than plastic limit.
                             w  LL         Moisture content estimated to be near liquid limit.
                             w > LL         Moisture content estimated to be wet of liquid limit.
 (Coarse Grained Soils)          D          DRY   – runs freely through fingers.
                                 M          MOIST – does not run freely but no free water visible on soil surface.
                                 W          WET   – free water visible on soil surface.

 Strength (Consistency)           VS        VERY SOFT         – unconfined compressive strength  25kPa.
 Cohesive Soils                    S        SOFT              – unconfined compressive strength > 25kPa and  50kPa.
                                   F        FIRM         – unconfined compressive strength > 50kPa and  100kPa.
                                  St        STIFF        – unconfined compressive strength > 100kPa and  200kPa.
                                 VSt        VERY STIFF   – unconfined compressive strength > 200kPa and  400kPa.
                                 Hd         HARD         – unconfined compressive strength > 400kPa.
                                  Fr        FRIABLE      – strength not attainable, soil crumbles.
                                 ( )        Bracketed symbol indicates estimated consistency based on tactile examination or other
                                            assessment.

 Density Index/                                                         Density Index (ID)           SPT ‘N’ Value Range
 Relative Density                                                       Range (%)                    (Blows/300mm)
 (Cohesionless Soils)             VL        VERY LOOSE                     15                               0–4
                                   L        LOOSE                       > 15 and  35                   4 – 10
                                 MD         MEDIUM DENSE                > 35 and  65                  10 – 30
                                  D         DENSE                       > 65 and  85                  30 – 50
                                 VD         VERY DENSE                  > 85                           > 50
                                 ( )        Bracketed symbol indicates estimated density based on ease of drilling or other assessment.

 Hand Penetrometer               300        Measures reading in kPa of unconfined compressive strength. Numbers indicate individual
 Readings                        250        test results on representative undisturbed material unless noted otherwise.

February 2019                                             8

Page 43

 Log Column      Symbol       Definition

 Remarks          ‘V’ bit     Hardened steel ‘V’ shaped bit.
                 ‘TC’ bit     Twin pronged tungsten carbide bit.
                              Penetration of auger string in mm under static load of rig applied by drill head hydraulics
                  T60         without rotation of augers.
                Soil Origin   The geological origin of the soil can generally be described as:
                              RESIDUAL            – soil formed directly from insitu weathering of the underlying rock.
                                                    No visible structure or fabric of the parent rock.
                              EXTREMELY           – soil formed directly from insitu weathering of the underlying rock.
                              WEATHERED             Material is of soil strength but retains the structure and/or fabric of the
                                                    parent rock.
                              ALLUVIAL            – soil deposited by creeks and rivers.
                              ESTUARINE           – soil deposited in coastal estuaries, including sediments caused by
                                                    inflowing creeks and rivers, and tidal currents.
                              MARINE              – soil deposited in a marine environment.
                              AEOLIAN             – soil carried and deposited by wind.
                              COLLUVIAL           – soil and rock debris transported downslope by gravity, with or without
                                                    the assistance of flowing water. Colluvium is usually a thick deposit
                                                    formed from a landslide. The description ‘slopewash’ is used for thinner
                                                    surficial deposits.
                              LITTORAL            – beach deposited soil.




February 2019                               9

Page 44

Classification of Material Weathering
 Term                                              Abbreviation           Definition

                                                                          Material is weathered to such an extent that it has soil properties. Mass
 Residual Soil                                             RS             structure and material texture and fabric of original rock are no longer visible,
                                                                          but the soil has not been significantly transported.

                                                                          Material is weathered to such an extent that it has soil properties. Mass
 Extremely Weathered                                       XW
                                                                          structure and material texture and fabric of original rock are still visible.
                                                                          The whole of the rock material is discoloured, usually by iron staining or
                                                                          bleaching to the extent that the colour of the original rock is not recognisable.
 Highly Weathered                                  HW                     Rock strength is significantly changed by weathering. Some primary minerals
                                  Distinctly                              have weathered to clay minerals. Porosity may be increased by leaching, or
                                 Weathered                      DW        may be decreased due to deposition of weathering products in pores.
                                  (Note 1)
                                                                          The whole of the rock material is discoloured, usually by iron staining or
 Moderately Weathered                             MW                      bleaching to the extent that the colour of the original rock is not recognisable,
                                                                          but shows little or no change of strength from fresh rock.
                                                                          Rock is partially discoloured with staining or bleaching along joints but shows
 Slightly Weathered                                        SW
                                                                          little or no change of strength from fresh rock.

 Fresh                                                     FR             Rock shows no sign of decomposition of individual minerals or colour changes.

NOTE 1: The term ‘Distinctly Weathered’ is used where it is not practicable to distinguish between ‘Highly Weathered’ and ‘Moderately Weathered’ rock.
‘Distinctly Weathered’ is defined as follows: ‘Rock strength usually changed by weathering. The rock may be highly discoloured, usually by iron staining.
Porosity may be increased by leaching, or may be decreased due to deposition of weathering products in pores’. There is some change in rock strength.




Rock Material Strength Classification
                                                                                                    Guide to Strength

                                              Uniaxial              Point Load
                                           Compressive            Strength Index
 Term                  Abbreviation       Strength (MPa)            Is(50) (MPa)        Field Assessment

 Very Low                   VL                 0.6 to 2              0.03 to 0.1        Material crumbles under firm blows with sharp end of pick;
 Strength                                                                               can be peeled with knife; too hard to cut a triaxial sample by
                                                                                        hand. Pieces up to 30mm thick can be broken by finger
                                                                                        pressure.

 Low Strength                L                  2 to 6               0.1 to 0.3         Easily scored with a knife; indentations 1mm to 3mm show
                                                                                        in the specimen with firm blows of the pick point; has dull
                                                                                        sound under hammer. A piece of core 150mm long by 50mm
                                                                                        diameter may be broken by hand. Sharp edges of core may
                                                                                        be friable and break during handling.
 Medium                     M                   6 to 20               0.3 to 1          Scored with a knife; a piece of core 150mm long by 50mm
 Strength                                                                               diameter can be broken by hand with difficulty.

 High Strength               H                 20 to 60                1 to 3           A piece of core 150mm long by 50mm diameter cannot be
                                                                                        broken by hand but can be broken by a pick with a single
                                                                                        firm blow; rock rings under hammer.

 Very High                  VH                 60 to 200              3 to 10           Hand specimen breaks with pick after more than one blow;
 Strength                                                                               rock rings under hammer.
 Extremely                  EH                  > 200                     > 10          Specimen requires many blows with geological pick to break
 High Strength                                                                          through intact material; rock rings under hammer.




February 2019                                                        10

Page 45

Abbreviations Used in Defect Description
                                           Symbol
 Cored Borehole Log Column               Abbreviation     Description

 Point Load Strength Index                   0.6         Axial point load strength index test result (MPa)

                                            x 0.6         Diametral point load strength index test result (MPa)

 Defect Details     – Type                   Be           Parting – bedding or cleavage
                                             CS           Clay seam
                                              Cr          Crushed/sheared seam or zone
                                              J           Joint
                                              Jh          Healed joint
                                              Ji          Incipient joint
                                            XWS           Extremely weathered seam

                     – Orientation         Degrees        Defect orientation is measured relative to normal to the core axis
                                                          (ie. relative to the horizontal for a vertical borehole)
                     – Shape                  P           Planar
                                              C           Curved
                                             Un           Undulating
                                              St          Stepped
                                              Ir          Irregular

                     – Roughness             Vr           Very rough
                                              R           Rough
                                              S           Smooth
                                             Po           Polished
                                              Sl          Slickensided

                     – Infill Material       Ca           Calcite
                                             Cb           Carbonaceous
                                             Clay         Clay
                                             Fe           Iron
                                             Qz           Quartz
                                             Py           Pyrite

                     – Coatings              Cn           Clean
                                             Sn           Stained – no visible coating, surface is discoloured
                                             Vn           Veneer – visible, too thin to measure, may be patchy
                                              Ct          Coating  1mm thick
                                            Filled        Coating > 1mm thick

                     – Thickness            mm.t          Defect thickness measured in millimetres




February 2019                                        11

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.