Appendix B - Geotechnical Investigation Report
fill but would most likely require moisture conditioning which could result in delays. Also there may be a shortfall in site won materials and imported fill would be required. We recommend that engineered fill comprising well graded imported granular materials such as demolition rubble would be suitable for treatment of poor subgrade areas and for backfilling retaining walls. The imported engineered fill must be free of contaminants or deleterious substances and has a maximum particle size not exceeding 40mm. Imported well graded granular fill should be compacted to at least 98% of SMDD and within 2% of their SOMC. The compaction requirement may be reduced to 95% of SMDD in landscaped areas, where settlement can be tolerated. Such fill should be compacted in horizontal layers as described above. Care will be required to ensure excessive compaction stresses are not transferred to the retaining walls. Density tests should be carried out at the frequencies outlined in AS3798 (Table 8.1) for the volume of fill involved. At least Level 2 testing of earthworks should be carried out in accordance with AS3798. Any areas of insufficient compaction will require reworking. As an alternative, single sized granular material (or ‘no fines’ gravel) may be used as backfill to the landscape retaining walls and this would also act as the drainage behind the wall and would only require nominal compaction (with no compaction testing). The drainage material should be wrapped in a non-woven geotextile fabric (e.g. Bidim A34) to act as a filter against subsoil erosion. Further, retaining wall backfill should be provided with a cap of at least 0.3m thickness of compacted crushed sandstone or clay at surface level to reduce the likelihood of surface water surcharging the retaining wall. 6.9 Wastewater Treatment and Disposal We note that the ASI “Site Soil Evaluation” report as recommended the following method of on-site effluent disposal comprise an Advanced Secondary Treatment with an Advanced Enviro Septic System (AES) Transpiration Bed. For further details refer to the ASI “Site and Soil Evaluation” report. 6.10 Overall Effect of Development on Stability We do not consider that the development will have any detrimental impact on the stability of the site. This is on condition that the design and construction of the proposed development is completed in accordance with the geotechnical advice presented in this report. 7 CONCLUSION We consider that the site is suitable for the proposed development. 35891URrpt Rev1 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.