Precinct 1
4.1 Chaplin Park
4.1.1 TODAY’S CHAPLIN PARK 4.1.2 KEY LAND USE OUTCOMES
Chaplin Park provides the largest area of NOOSA OUTRIGGER CLUB OFF-LEASH DOG PARK WEDDING CHAPEL PROPOSED DTMR BOAT RAMP
open green space within the foreshore and
incorporates the following land use activities: The Noosa Outrigger Club (Outrigger Club) is seeking There has been requests to Representatives within Chaplin Park has been identified
to establish a clubhouse facility and storage sheds to Council for the provision of an the wedding industry as a potential site for a new
Background
• Noosa River Slipway support its existing activities within Chaplin Park. off-leash dog area in Chaplin identified Chaplin Park as recreational boating facility by
• Noosa Outrigger Club Park. an appropriate venue for a the Department of Transport
wedding chapel. and Main Roads (DTMR) in the
• Group fitness training Recreational Boating Facility
• Weddings Demand Forecasting Study 2016.
• Events ̏̏ General acceptance for the club uses within the Divergent views were received Community feedback Minimal community support
Results of Consultation and
Stakeholder Engagement
foreshore. regarding the introduction of this indicated that while the was noted for a new recreational
• Active and passive recreation
̏̏ Mixed support for a club building and storage sheds use into the foreshore. A petition community was generally boating facility.
• Car Parking for the Outrigger Club within Chaplin Park. was tabled supporting this use. supportive of wedding
̏̏ Community was strongly in favour of maintaining celebrations, there was
existing open space in Chaplin Park. minimal support for a
Chaplin Park has less built infrastructure ̏̏ Consultation was subsequently undertaken with the purpose-built facility within
compared to other areas of the foreshore and Outrigger Club and the Noosa Yacht and Rowing Chaplin Park.
Club (NYRC) to explore precinct options, including
is fragmented from the rest of the foreshore
co-location with the NYRC in Precinct 2 - see
due to its physical separation by the canal, lack Section 4.2.2.
of visibility from Gympie Terrace and restricted
vehicular access (left in, left out) via the Consideration has been given Land use analysis identified land
Discussion
Gympie Terrace/Eumundi Road and Mill Street to this use and it has been and accessibility limitations and
determined that sufficient space conflict with the open space
roundabout. exists within Chaplin Park. It is character of Chaplin Park as key
Opportunities exist to better utilise Chaplin recommended an off-leash area issues in considering this activity.
is initially trialed for 12 months.
Park's large area for greater levels of low
impact activity to ease pressures on other 1. Given there is general acceptance of the outrigger 1. The Master Plan to include 1. That a public use roofed 1. A new recreational boating
areas of the foreshore. use, mixed support for construction of a new an off-leash dog area in the structure within the park facility is not supported in
Recommendations
clubhouse, and the community is strongly in western portion of Chaplin be considered which Chaplin Park.
Land use activities within the Chaplin Park favour of maintaining the existing open space, it is Park, delineated by the could be booked for 2. Council will discuss this
precinct will contribute to the establishment of proposed that co-locating both the Outrigger Club drainage line. wedding ceremonies. outcome with DTMR and
three distinct zones, clearly delineated by Mill and NYRC be investigated. It is recommended this 2. The area may initially be continue to review other
Street and the existing drainage line. option be considered in the Master Plan and is subject to a 12 month trial possibilities along the river
discussed further in Precinct 2. and then reviewed. outside the study area.
2. Further structure planning of the proposed co-
location area is recommended.
12
See the original
The page text is free to read. Viewing or downloading an original file needs an account.