Skip to the record
Mmm.. taste the original NoosaWatch™

Original source · versioned page text

2018-05-14 GC Agenda Attachment 2 to Item 11 Noosaville Foreshore Land Use Masterplan

of 26

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (34.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

2. The journey so far...

To inform plan preparation,    The first round of community consultation
                               was undertaken in April and May 2017, which
                                                                                 The Draft Master Plan was presented to
                                                                                 Council in December 2017. Council resolved
a month-long consultation      included an intensive four-day engagement         to adopt the Draft Master Plan in January
                               program, to gather the views and visions of the   2018 and proceeded with further community
and engagement program,        Noosa community.                                  consultation over a four-week period.
including four days of         The engagement program included two               This round of public consultation included an
                               community pop-up events, stakeholder and          in-person drop-in session with Place Design
workshops and pop-up           Councillor workshops, and an online survey        Group staff as well as online feedback via
events, was undertaken         which was available for a month on Council’s      written submissions lodged to Council’s online
                               website.                                          portal.
to gather feedback from a      A number of written submissions were also         Over forty members of the community
passionate and engaged         received including two petitions.                 attended to discuss the Draft Master Plan,
                                                                                 offering feedback on key issues of concern.
Noosa community.               The consultation was highly publicised and
                               well attended both in person and online.          A total of 247 written submissions were
                                                                                 received via Council’s ‘Your Say Noosa’
                               The outcomes of the consultation informed
The Draft Master Plan was      the land use vision, precinct vision statements
                                                                                 online portal, of these, four (4) petitions were
                                                                                 received.
then adopted by Councill       and identified the primary land use issues
                               affecting the foreshore.                          Full details of the submissions, consultation
and was open for public        Full details of the consultation outcomes and
                                                                                 outcomes and recommendations are provided
consultation for a four-week   analysis has been provided in the separate
                                                                                 in the Final Consultation Summary Report,
                                                                                 April 2018.
                               Initial Consultation Summary Report, July
period.                        2017.




8
Log in to download the original file

2018-05-14 GC Agenda Attachment 2 to Item 11 Noosaville Foreshore Land Use Masterplan(PDF, 33MB).pdf · 34.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.