Original source · versioned page text
Delegated Report - Code - Planning OPW21 0021
Author Development Engineer, Diogo Carrico Development Assessment APPLICATION DETAILS Application No. OPW21/0021 Applicant The Property Clinic Proposal Operational Works – Vehicle Crossover Properly Made Date 19 January 2021 Information Request Date 2 February 2021 Information Response Date 18 March 2021 Decision Due Date 12 May 2021 Report Completed Date 19 April 2021 Report Reviewed By Mark Lewis PROPERTY DETAILS Property Address 17 Cloudsley St Noosaville Qld 4566 RP Description Lot 11 RP 64921 Land Area 569 m² Existing Use of Land Residential STATUTORY DETAILS SEQRP Designation Urban Footprint Zone Low Density Residential Precinct Not Applicable Local Plan Area Not Applicable Overlays Acid Sulphate Soils; Flood Hazard Assessment Type Code PROPOSAL The application seeks approval for Operational Works – Vehicle Crossover. The proposal plans are included below. site details Background The subject application follows on the requirements of development application DBW20/0014, which conditioned the retention of a Norfolk Island Pine on road reserve. The structural root zone of this tree partially conflicts with the location of the proposed driveway. An alternative construction method for the driveway and material has been investigated and endorsed by an applicant engaged arborist. Council’s arborist has also provided input into both applications (i.e. DBW20/0014 & OPW21/0021). The proposed alternative material (resin bound aggregate) and construction method (no box-out excavation) for the driveway have been reviewed and endorsed. The requirement for having an arborist supervising all the driveway construction works is included in the conditions below. Site Description Surrounding Land Uses assessment Instruments for Statutory Assessment Under the Planning Act 2016 the application must be assessed against each of the following statutory planning instruments to the extent they are relevant to the development: State Planning Policy; South East Queensland Regional Plan; Planning Regulation 2017; and Noosa Plan 2020. Noosa Plan 2020 The following codes from the Noosa Plan 2020 are applicable to this development: Driveways and Parking Code. cONSULTATION Referral Agencies Not Applicable Internal Council Referrals The application was forwarded to the following internal Council officers for review and/or comment: Council’s Arborist. conclusion & reasons for decision The proposed development generally complies with the requirements of the planning scheme and does not raise any significant issues that cannot be addressed by reasonable and relevant conditions. The application is therefore recommended for approval. The report is provided in accordance with Section 63(5) of the Planning Act 2016. RECOMMENDATION With regard to Application No OPW21/0021 for Operational Works – Vehicle Crossover situated at 17 Cloudsley St Noosaville Qld 4566 and described as Lot 11 RP 64921, it is recommended the application be approved in accordance with the following details for the Decision Notice: application details Application No: OPW21/0021 Street address: 17 Cloudsley St Noosaville Qld 4566 Real property description: Lot 11 RP 64921 Planning Scheme: Noosa Plan 2020 (25 September 2020) Decision details Council decided to issue the following type of approval: Development Permit for Operational Works – Vehicle Crossover CURRENCY PERIOD of approval The currency period for this development approval is stated in the conditions below. assessment manager conditions APPROVED PLANS Development undertaken in accordance with this approval must generally comply with the approved plans of development. The approved plans are listed in the following table unless otherwise amended by these conditions. Plan No. Rev. Plan/Document Name Date 04 of 07 B Driveway Layout Plan Prepared by 360 Civil Consulting 08/03/2021 05 of 07 B Driveway Longitudinal Sections Prepared by 360 Civil Consulting 08/03/2021 06 of 07 B Driveway Cross Sections Prepared by 360 Civil Consulting 08/03/2021 CURRENCY PERIOD The Currency Period for this development approval lapses if the development has not substantially started by 20 April 2023, unless an application to extend the currency period is approved by Council. PRIOR TO COMMENCEMENT OF THE WORKS Engineering The existing Norfolk Island pine tree located in the road reserve must be retained and any works within the tree protection zone (as defined AS 4970, Protection of trees on development sites) must be supervised by a qualified person with a minimum 5 years’ experience and a qualification of International Society of Arboriculture (ISA) certification; or a Diploma of Arboriculture, to ensure the tree’s retention. Tree protection fencing must be installed under the supervision of the Project Arborist. A condition report including photographs of the frontage of the site must be completed and submitted to Council at the prestart meeting. The principal contractor must have all the appropriate insurance and public liability documentation to carry out the works. The principal contractor is also responsible to ensure that any subcontractors also have the appropriate insurance and public liability documentation. Certificates demonstrating currency of public liability insurance and works insurance covering the works must be submitted to Council prior to the prestart meeting. Council must be contacted at least 5 working days prior to any works commencing to organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The pre-start meeting must include the relevant parties for the following aspects of the works: Civil engineering works; Tree protection supervision works. A Construction Management Plan must be submitted to Council prior to the pre-start meeting and must specifically address the following: traffic Management during the construction phase; appropriate traffic signage in accordance with the Manual of Uniform Traffic Control Devices (MUTCD); provision for safe pedestrian access across the frontage of the site both during and outside working hours. Any changes to the details associated with the supervising RPEQ or Principal Contractor during construction, must be notified to council in writing within five business days of the change occurring. Any conflict between the development and an existing or proposed service must be referred to the relevant service authority for determination prior to commencement of works. DURING CONSTRUCTION Engineering The integrity and condition of any existing public or Council infrastructure and services (above ground and/or underground) must not be adversely affected by the proposed works. Any damage caused to existing services and assets as a result of the development works must be repaired at no cost to the asset owner at the following times: where the damage would cause a hazard to pedestrian or vehicle safety, immediately; or where otherwise, upon completion of the works associated with the development. Any repair work which proposes to alter the alignment or level of existing services and assets must first be referred to the relevant service authority for approval. All works must be constructed and work procedure undertaken in accordance with: development approval DBW20/0014; the approved plans/documents and conditions detailed in this Decision Notice; all relevant Noosa Council Planning Scheme Policies, standard drawings, standard specifications and guidelines the latest version of the Healthy Waterways document “Water Sensitive Urban Design Technical Design Guidelines for South East Queensland” for all water quality devices to be constructed on site. Works within Road Reserves No removal of street trees is permitted without Council’s prior written approval. The works must be supervised by a Level 4 arborist Safe pedestrian access on all streets in the vicinity of the development must be maintained at all times. Should footpath/road closures be necessary to carry out construction works, Council’s Engineering Officer must be notified prior to the proposed closure and all requirements complied with. All works must match neatly with existing road and verge/footpath features. Additional works beyond the frontage may be required to provide an acceptable transition to existing road and verge/footpath profiles. Driveways Driveway crossovers must be constructed generally in accordance with Council’s Standard Drawings RS-049 and RS-050. Any existing unnecessary or redundant property accesses must be removed, and the kerb, footpath and verge area reinstated to match the existing footpath and/or verge treatments. Grassed verge areas to be reinstated must be provided with 100 mm topsoil and grass seed or turf, and must be maintained by the developer until established. The following must be complied with during the construction of the required crossover/driveway: the driveway surfacing must consist of a resin bound aggregate as detailed in the approved plans; the driveway must be in accordance with the requirements of AS2890.1 Off-Street Car Parking for longitudinal and crossfall gradients; the driveway must be constructed so as to not concentrate or direct stormwater runoff onto neighbouring properties; where there is an existing pedestrian path, a matching crossfall must be provided for the driveway on the alignment of the path, for the full width of the path; have a minimum clearance of 500mm from any Unitywater/Energex/Telstra asset, unless a written approval is obtained from Unitywater/Energex/Telstra and submitted to Council; any stormwater kerb outlet in close proximity to the edge of the new driveway must be provided with an approved kerb adaptor; any existing kerb sections requiring removal due to the works must be saw-cut and removed to allow for a smooth and neat finish with the new driveway. Pavement design for privately owned works must be undertaken in accordance with the relevant standards. Structural integrity of the driveway and car park areas will remain the responsibility of the property owner/developer. Stormwater Drainage The constructed driveway must not cause additional ponding on the road formation or the road reserve. Environment (Erosion and Sediment Control) Prescribed Water Contaminants (as defined in the Environmental Protection Act 1994) must not be released from the site or to waters within the site, or be likely to be released should rainfall occur, unless all reasonable and practicable measures are taken to prevent or minimise the release and concentration of contamination. The contractor must ensure non-essential exposure of soil is prevented by restricting the extent of works and minimising the duration of soil exposure to adverse weather conditions. Exposed areas must be suitably covered/stabilised/reinstated as soon as practicable and prior to any predicted rainfall occurring. Erosion and sediment control measures must be installed and maintained to minimise erosion on the site and to minimise the export of sediment and associated pollutants from the site. The erosion and sediment control measures must be designed, installed and maintained in accordance with current best practice standards (refer to advisory notes). FOLLOWING CONSTRUCTION A final inspection and approval of the new driveway and completed reinstatement works by Council’s Inspector is required. Please contact Council on 5329 6500 to arrange for the inspection. Upon completion of the work a certificate must be issued by an RPEQ certifying that the works have been constructed in accordance with the requirements of this Operational Works permit. Prior to requesting a final inspection of the works, certification of the works by a qualified person with a minimum 5 years’ experience and a qualification of International Society of Arboriculture (ISA) certification; or a Diploma of Arboriculture, must be provided to Council. The certification must state that works within the tree protection zone (as defined AS 4970, Protection of trees on development sites): were supervised by a qualified person with a minimum 5 years’ experience and a qualification of International Society of Arboriculture (ISA) certification; or a Diploma of Arboriculture; and were undertaken generally in accordance with the findings and recommendations of the report “Arborist Brief” for 17 Cloudsley St, dated July 2020 and prepared by Wayne Gooch of Tree Safe Australia Pty. referral agencies Not applicable. Advisory notes The following notes are included for guidance and information purposes only and do not form part of the assessment manager conditions: General Advisory Notes As this driveway is a private structure, the owner bears full responsibly for the standard of its construction, maintenance and any liabilities associated with its construction. It is recommended that professional advice be sought for the construction of the driveway to ensure that the driveway is constructed in accordance with standard drawings RS-049 and RS-050. Council has undertaken an audit check of the Operational Works drawings in relations to the proposed works. A detailed check of the calculations and drawings has not been undertaken, as they have been certified by a RPEQ. The RPEQ bears full responsibility for all aspects of the engineering design. Council reserves the right to require further amendments and/or additions at a later date should design errors become apparent. Council reserves the right to call up any performance bond held or levy charges against the property, should emergency works be required to be undertaken by Council to make the site safe due to inactivity on the development site for extended periods of time. Should any changes or modifications to the approved plans be required as a result of construction constraints, a “Request to change an existing approval” under the Planning Act 2016 must be made. Amended plans clearly indicating the changes must be lodged with this application along with the appropriate fees. Prestart Inspections Request Contact Council on 5329 6500 to arrange a prestart or an inspection giving a minimum of 5 business days’ notice of preferred inspection time. It should be noted prior to arranging a pre-start meeting the Appeal Period of 20 business days must have passed or the applicant must have provided Council with written confirmation that the applicant has accepted the conditions of Decision Notice and waived their appeal rights. If Council officers are required to undertake additional inspections of the same works, a reinspection fee will be applicable in accordance with Council’s Fees and Charges register applicable at the time. Environmental Advisory Notes The Environmental Protection Act 1994 states that a person must not carry out any activity that causes, or is likely to cause, environmental harm unless the person takes all reasonable and practicable measures to prevent or minimise the harm. Environmental harm includes environmental nuisance. In this regard persons and entities, involved in the civil, earthworks, construction and landscaping phases of this development are to adhere to their ‘general environmental duty’ to minimise the risk of causing environmental harm. Erosion and Sediment Control Accepted best practice standards include International Erosion Control Association Australasia Best Practice Erosion and Sediment Control property notes Not applicable. VARIATION approval details Not applicable. further development permits required Not applicable. submissions Not applicable. RIGHTS OF APPEAL You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the Planning Act 2016 is attached. During the appeal period, you as the applicant may suspend your appeal period and make written representations to Council about the conditions contained within the development approval. If Council agrees or agrees in part with the representations, a negotiated decision notice will be issued. Only one negotiated decision notice may be given. OTHER DETAILS If you wish to obtain more information about the decision, electronic copies are available on line at www.noosa.qld.gov.au or at Council Offices. [word/footer1.xml] Page 2 of 9 [word/header1.xml] 3 [word/header2.xml] DEVELOPMENT ASSESSMENT DELEGATED REPORT [Attachment: image1.png (image text)] LEGEND EES) | 5 i & i 8 apogee, 8 a ° i] gli NOTES i lI Sp+ ¢ - Shotts 1 ‘ 3 ; en 4 / . seperate s é reeves ire SIRES halogen carace oe Fram oii g Sf. {I 3 af —h— APR TY 7 T[rete fe rege penn AS4 | \ LSA UE iy Sl] Re ean ear sas [os [eae sete [aos [narsome 7 2425539] rm [Proposed Dwelling comer] Dveway Layout Plan - z civ, sos = SPD SSksuunne weeny || 17 coudley st, Noosaville = = one eters [ee mesidences wane |2020036]o[oa |-]o7 [fal [Attachment: image2.png (image text)] 5 ' 2 per kre - (counere cei [rueen sureace eve qq og dd = | ear ig fl a a coonttospzinssisten | ep sags ENE COINAGE eI 3 q 4 S |r orm TH: comracTeD RoAD BASE | [eae Js do 4 fg ‘ ; LONGITUDINAL SECTION LHS < RESIN BOND / PAVEMENT DETAIL BI \ z ? i ( | i sop beg Pete i pp en { 1 eegitigneme tetas == papa > seit sith sapere He ree Ssh in (connie tL tse | Ncodherel ee ie tt on SLRS re EL \ 5 TEN iperetal rei Sara 3 “a ( “ pimpeat smear mlcwsene, frseonmina| oa > seuaraegreap et net tones lz a yadda ¢ \ Cohttenent N__—_"* [primes ad i | Joora.necunnce a i jad LONGITUDINAL SECTION RAS = ‘5 13502553325| mon | Proposed Dwelling ‘ewers| Driveway Longitudinal Sections cw ‘Senta FREED Sieur weet a7 Caley noc = = mat ognberagsetevicsumngcomac| owe | PF Residences emer [2020036 [on]05 [a]o7 mul al [Attachment: image3.png (image text)] 4 LAND PARCELS LAND PARCELS Plan Lot Plan [Attachment: image4.png (image text)] SQ @ Zone Maps OAV Urban Area Boundary MV Local Plan Boundary 80 BF Preciness Zones Low Density Residential Medium Density Residential High Density Residential Tourist Accommodation I Mejor Centre Wm District Centre Local Centre Neighbourhood Centre Low Impact Industry Medium Impact Industry Recreation and Open Space Il Environmental Management and Conser.. Community Facilities I Innovation Rural Rural Residential og © D i Community Facilities Label Legend 802) G Overlay Maps 8D Bloaal 80) & Other Plan Maps 2) & Superseded 1985 Zone ernment Infrastructure Plat YS EEA POLE , pacensape 0 100.450 2001
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.