Skip to the record
The first. The best. The only NoosaWatch™.

Original source · versioned page text

Compiled Reference Documents - MCU20/0084.01 (As Published)

of 72

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (19.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

                                                                                                       Page 2 of 5




                                                     B
                                                     V




                                    A
                                    V

                                                                                                               B
   A

       Figure 2 - Elevation Profile through site (based on 1m LIDAR data). ‘A’ marks site access from Upper
       Pinbarren Road; ‘B’ marks proposed lodge; Star marks bridge over creek; Circle marks level crossing.

There are two creek crossings on the site, the primary crossing located at the site entrance is via a bridge and a
second level crossing north of the caretakers house where a spillway overtops from the pond.

(It should be noted that both bridge and level crossing works are proposed to improve the flood resilience and
better notify site users of the risks at these locations.)

SITE FLOOD RISK
The primary source of flood risk to the site and in particular site users relates to flash flooding within the site
and wider catchment from heavy rainfall events. Specifically, there are number of ponds on the site which pick
up runoff from rainfall within the site and overflow down the site and into the main creek that forms the south
western border of the site. Although these ponds and other features are significantly lower than any of the
existing or proposed buildings on the site and would not pose direct risk to those buildings, access routes to and
from the site could be subject to inundation and flooding in more severe events. The purpose of this Flood
Management Plan presented in Appendix 1 is to provide a quick reference guide for the site owners and users
of the site in an emergency situation.

We trust this information is satisfactory for your current needs. Should you have any questions, please feel free
to contact the undersigned

 Protest Engineering




 Ryan Hofman
 Senior Civil Engineer
 BEng (Hons) CPEng CWEM RPEQ 21643


PTP/03104 – Lot 195, 1164 Cooroy Belli Ck Road, Ridgewood                                            28 June 2019
Log in to download the original file

Compiled Reference Documents - MCU20_0084.01 (As Published).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.