Instability issues for the two batters would likely involve slumping and erosion. Larger scale movements of soil
are less likely but still possible, particularly if any erosion is left untreated or following heavy rainfall. The
consequences of this instability for the upslope batter is assessed as minor, however, instability of the
downslope batter may affect the foundation of the dwelling and is therefore more significant. On this basis, this
instability has been assessed as a ‘Moderate’ hazard.
Requirements to achieve and maintain a ‘Low’ hazard rating for the batters are given in the next section.
Requirements that must be carried out or implemented in order to maintain the ‘Low’ rating for the global
landslide hazard rating are given in the subsequent section.
Batter Treatment Requirements
To achieve a ‘Low’ instability hazard rating for the batters, the following is required:
• Trim the batters back to no steeper than 2:1 (horizontal to vertical);
• Mulch and vegetate the batters as soon as possible to reduce the potential for surface scouring and
erosion.
The dwelling should be located no closer than 1m from the crest of the downslope batter.
As an alternative to flattening the batters, engineer designed retaining walls can be considered.
Slope Maintenance Requirements
The following comments and recommendations are required for the proposed development works to ensure
long-term stability of any proposed infrastructure and batters within the BLE.
• Ensure all stormwater drains are free of blockage to allow surficial and subsurface water flow to freely
flow into piped road drainage and/or stormwater storage tanks;
• Any proposed earthworks should be undertaken in accordance with relevant Council guidelines and
Australian Standards;
• The Australian Geomechanics Society extract ‘Australian Geoguide LR8 (Hillside Construction)’
(attached) must be strictly followed for good hillside construction practices.
• Engineering design and global stability analysis should be undertaken on all proposed retaining walls
and batters within or adjacent the BLE.
Uncontrolled surface runoff and discharges can cause an ingress of surface water into the sloping terrain and
fill material if adequate drainage is not implemented and maintained. Providing adequately designed,
constructed and maintained surface and subsurface drainage is important to the long-term performance of the
Site in terms of slope stability and erosion. This includes the following:
• A suitably lined surface drain must be constructed upslope of the building area to intercept and divert
water runoff away from the building area.
• Drainage outlets and water discharge areas must be located downslope from the building area.
• All surface runoff and collected roof water should be piped into the road drainage system or into
storage tanks. Any tank water overflow must be piped downslope of the building and road areas.
• Uncontrolled water discharges onto the existing ground and hill slope in the building area or adjacent
area must be avoided.
• All stormwater and drainage systems must be approved by Council.
Gold Coast | Sunshine Coast | Melbourne | Emerald
PTP/12376 328 Upper Pinbarren Creek Road, Pinbarren 11 August 2023
Document Set ID: 22574699
Version: 1, Version Date: 07/09/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.