            Current Capacity: Our calculations indicate that the current capacity of the bridge superstructure
            is suitable to carry 7.5 tonnes allowable GVM (single axle load must not exceed 3.75 tonnes). The
            nature of timber is such that it will continue to dilapidate and lose capacity as time passes.

            It is essential to impose a 10km/hr speed limit using signs, to reduce the “bounce” effect of the
            vehicle load on the bridge.

            Please note that the substructure of the bridge was not assessed during this Level 3 investigation,
            as the depth of these supports are not visible. An extensive investigation would be required to
            assess the substructure.

            Short-Term Recommendations: We strongly recommend the following:
               • Installing and maintaining in-ground termite baits near each abutment.
               • We consider it essential to install 10km/hr signs at both ends of the bridge.
               • We consider it essential to install 7.5-tonne load limit signs at both ends of the bridge.
               • We recommend that a Level 1 (visual inspection) be carried out every six months until the
                   next Level 3 inspection on/before 30 January 2022.

            The Level 1 inspection shall be carried out by an experienced bridge technician/builder.

            The Level 3 inspection shall be carried out by an experienced bridge engineer.

            We are happy to provide detailed designs of repair/replacement works to allow for the bridge to
            support a heavier vehicle load, under an extension to the original Agreement. At this preliminary
            stage, the repair works is likely to include the installation of larger diameter replacement
            girders/logs and load distribution boards under the decking.

            Please note that due to the sizes and severity of defects of the existing girders, we suspect that it
            would be more cost efficient to replace the existing superstructure rather than undertaking
            maintenance on the bridge.


            Yours faithfully,




            Chris Dowding – R.P.E.Q. 8339
            07 5449 9600 | [email protected]
            TOD consulting engineers




Document Set ID: 21271534
Version: 1, Version Date: 20/10/2020
Log in to download the original file

Compiled Reference Documents - MCU20_0084.01 (As Published).pdf · 19.9 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.