Original source · versioned page text
Attachment F - Geotechnical Report
PROPOSED COMMERCIAL & RESIDENTIAL DEVELOPMENT
30-32 DOONELLA ST, TEWANTIN
6.5 Drainage
Adequate site drainage must be installed to ensure that surface water runoff is directed away from
pavements and footings. All excess stormwater should be piped or channeled into the existing stormwater
infrastructure along Doonella Street.
6.6 Acid Sulfate Soils
As the proposed basement excavation will not extend below RL 5 m AHD, an acid sulfate soil investigation
is not warranted for this project.
7.0 LIMITATIONS
Your attention is drawn to the document “Limitations”, which is included in Appendix C of this report. The
statements presented in this document are intended to advise you of what your realistic expectations of this
report should be, and to present you with recommendations on how to minimise the risks associated with the
services provided by Tectonic for this project.
22 June 2018
Report No. 18151-001-Rev0 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Attachment F - Geotechnical Report.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.