Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnSerious disruption
Loss of human life, or injury or illness.
Widespread or severe property loss or damage.
Widespread or severe damage to the environment.
Vulnerability
Degree of loss which could result from a potentially damaging phenomenon, or the extent to
which a country, area, community, or structure risks being damaged by a disaster. This can
also mean the susceptibility and resilience of the community and environment to hazards.
1.9 Review and renewal of the plan
A review of the plans in accordance with s59 of The Act may be conducted by an LDC (or
delegate) following:
(a) Activation of the plan as a result of a disaster.
(b) Exercises designed to practise or test aspects of the plans.
(c) Alterations to the roles or responsibilities of any agency involved in the plan.
(d) Changes to operational procedures.
(e) External disasters or new technology which may suggest a review be carried out.
(f) Noosa Council organisational structural change.
(g) An Officer responsible for overseeing a Local Group task leaving that position.
(h) Following an assessment of the local plan by the Chief Executive Officer of the
Department (or delegate)
(i) Following an assessment by the DDMG or DDC (or delegate).
The plan will be reviewed annually if a review has not resulted from one of the items
mentioned above.
Minor changes such as typographical changes, changes to position titles and contact details
may be made to the plan from time to time by the LDC.
1.9.1 Arrangements for the review and assessment of Local Disaster Management
Plan
1.9.1.1 Review by Local Group (Internal Review)
The plan or its sub plans are to be reviewed annually by a working group from the Local
Group and submitted to that Local Group for acceptance and adoption. Where major
changes to the plan have occurred the plan will be submitted to the council by the LDC for
renewal.
1.9.1.2 Assessment of the Local Plan (External Assessment)
The Act requires a regular review and assessment of the local plan to be undertaken by the
Chief Executive of the Department of Community Safety (or delegate) and the DDMG.
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.