Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnDescriptor People Environment Economy Governance Social/Community Infrastructure
Minor Minor injury/illness Limited and/or Financial loss Governing entities Isolated and Isolated cases of short-
managed within localised impact requiring activation manage the event temporary cases of to mid-term failure of
existing resources on the of reserves to cover under emergency reduced services infrastructure and
(first aid personnel environment that loss, disruptions at arrangements, within community, service delivery,
and readily can be readily business level public repairable damage to localised inconvenience
available rectified but effort leading to isolated administration objects of cultural to the community and
equipment). is still required to cases of loss of functions with significance, impacts business anticipated to
minimise. One off employment. minimal within emotional and extend up to 72 hours.
recovery effort is disturbances, psychological capacity No long term impact on
required. isolated of the community. integrity or operation of
expressions of the infrastructure.
public concern,
media coverage
within region.
Moderate Single fatality or Isolated but Direct moderate Governing entities Ongoing reduced Mid-term failure of
permanent significant cases financial loss in the manage the event services within (significant)
incapacity. of impairment or region requiring with considerable community, infrastructure and
Multiple serious loss of adjustments to diversion from permanent damage to service delivery
injury/illnesses ecosystem business strategy to policy, public objects of cultural affecting some parts of
requiring functions, cover loss, administration significance, impacts the community,
professional intensive efforts disruptions to functions limited beyond emotional and widespread
medical care for recovery selected industry by focus on critical psychological capacity inconveniences.
and/or required. Event sectors leading to services, in some parts of the Repair/replacement
hospitalisation. can be managed isolated cases of widespread public community. expected to take greater
Small number of under normal business failure and protests, media than 72 hours.
people displaced procedures. multiple loss of coverage within
for <24 hrs. employment. region.
42
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.