Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn5.3.5 State disaster coordination centre (SDCC) ------------------------------------------------- 68
5.4 Activation of the local groups and the 2015 local disaster management plan------------- 68
5.4.1 Activation and authority to activate ----------------------------------------------------------- 68
5.4.2 Noosa Local Disaster Coordination Centre (LDCC) activation -------------------------- 68
5.5 Accessing support ---------------------------------------------------------------------------------- 72
5.5.1 Requests from the lead agency ICC to the LDCC ----------------------------------------- 72
5.5.2 Requests to DDC for assistance / support -------------------------------------------------- 72
5.5.3 Requests to the State Disaster Coordination Centre for assistance / support -------- 72
5.5.4 Support from external agencies (public and private) -------------------------------------- 72
5.6 Public information and warning notification and dissemination ------------------------------ 73
5.6.1 Public information during disaster response and recovery ------------------------------- 73
5.6.2 Public warning systems ------------------------------------------------------------------------ 73
5.7 Declaration of a disaster situation ---------------------------------------------------------------- 73
5.7.1 Relationship between activation, declarations and financial assistance --------------- 74
5.8 Activating the Local Group ------------------------------------------------------------------------ 74
5.9 Operational sub-plans ------------------------------------------------------------------------------ 74
5.10 Threat specific planning and all hazards arrangements ---------------------------------- 75
6. Recovery ------------------------------------------------------------------------------------------- 76
6.1 Definition --------------------------------------------------------------------------------------------- 76
6.2 Recovery principles and concepts --------------------------------------------------------------- 76
6.3 Recovery components ----------------------------------------------------------------------------- 77
6.4 Establishment of a local recovery committee --------------------------------------------------- 78
6.5 Local Recovery Coordinator----------------------------------------------------------------------- 78
6.6 Recovery plan --------------------------------------------------------------------------------------- 79
6.6.1 Recovery plan for a specific event ----------------------------------------------------------- 79
7. Appendicies (see attached) ------------------------------------------------------------------ 81
Appendix A: Activating the plan
Appendix B: Operational sub-plans
Appendix C: Threat specific sub-plans
Appendix D: Tropical cyclone storm tide warning response system
Appendix E: Local group contact listing
Appendix F: Community resilience strategy
Appendix G: Queensland resupply guidelines
Appendix H: Directory of maps
Appendix I: Council to Council Disaster Assistance MoU between Sunshine Coast
Council and Noosa Shire Council
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.