Original source · versioned page text
2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnActivation level Threat/Trigger Actions
Stand Up Event is imminent or has occurred. Local Group and Local Plan activated in full or in part as per sub-plans
Cost capture commenced
Potential for significant community
impact. DDC advised of level of activation and situation
Situation reporting from LDCC underway
Regularly hold and minute LDMG core group or extraordinary meetings
Scale up LDCC as required when existing resources cannot cope with the
volume of work and further expansion of the AIIMS system is required
Damage / impact assessment process being planned or underway
Activate recovery plans
Stand Down Coordination of disaster response Status of all outstanding actions for disaster response operations confirmed
operations to the event has and handover of tasks to normal operational methods completed
concluded. Final SitRep for disaster response operations forwarded to DDC
All documentation /electronic files, including finance, finalised and stored
Transition to coordination of disaster
recovery operations underway / LDCC staff and Local Group members deactivated for disaster response
completed. operations
LDCC closed for disaster response operations
Community is in recovery phase or
Community informed of end or response operations
returning to pre-event status.
Recovery arrangements implemented
All council information updated
Transition to coordination of disaster recovery operations finalised
Handover to Local Disaster Recovery Coordinator for reporting purposes
completed
Hot debriefing/s held
Cold debrief scheduled
71
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.