Log in to see the plans as drawnAppendix B.8: “Public information and warnings sub-plan” provides the guidelines for the
public awareness and education programs undertaken by members of the Local Group and
also the procedure for issuing warnings or advice pre, during or post an event.
Appendix B.9: “ Public works and engineering sub-plan” provides the guidelines for
protection and restoration of infrastructure before, during and after an event is paramount
and this plan identifies key resources and assistance that can be deployed.
Appendix B.10: “Rescue sub-plan” details of circumstances which may require the rescue of
people and the support rescue agencies and their activation procedure is identified in this
plan.
Appendix B.11: “Transport sub-plan” – transport plays a key role in a disaster in not only
ensuring access to the area for response teams but also to evacuate people if required.
Appendix B.12: “Logistics sub-plan” - resource management, particularly of material
resources, is an area that can cause extreme problems in response to a major event. This
plan addresses the issues and provides process to be followed during a major event.
5.10 Threat specific planning and all hazards arrangements
This disaster management plan is based on the all hazards, all agencies approach which
recognises that although counter measures will often vary with specific hazards, it is
desirable to establish a single set of management arrangements capable of encompassing
all hazards.
However as each type of event will have its own special requirements, to aid response for
extreme or high risk hazards some additional threat specific plans have been included in this
disaster management plan as follows:
Appendix C.1: “Wildfire threat specific sub-plan”
Appendix C.2: “Cyclone, east coast low and severe storm threat specific sub-plan”
Appendix C.3: “Flood threat specific sub-plan”
Appendix C.4: “Hazardous material incident threat specific sub-plan”
75
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.