Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1

of 88

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
The affected community will include all those affected in any significant way whether they
are defined by geographical location or as a dispersed population.
Recovery services will be responsive, flexible and adaptable to meet the rapidly changing
environment, as well as being accountable.
As the community gradually recovers there will be a planned withdrawal of external services
to avoid gaps in service delivery and the perception of leaving before the task has been
completed.

6.3     Recovery components
In a disaster there are four key components which need to be considered and addressed in
developing a recovery plan. These are:
   social, psychological and human impacts
   physical infrastructure and essential services impacts
   economic and financial impacts
   natural environment impacts

Depending on the nature of the disaster one or other of these components may be the major
focus of recovery operations. However often a disaster will be of such a scale that one
cannot effectively remediate one area of impact without addressing all the other affected
areas.
Therefore during the response phase of an event, the Local Group will commence
developing a recovery plan that considers in detail the impact of that particular event and
addresses the issues identified. As part of developing the recovery plan, the Local Group
may decide to activate it’s Recovery committee with various sub committees as required.
Examples of issues which are likely to require addressing in the development of a recovery
plan include:

The psychosocial impacts on the community, families and individuals
(a) community characteristics
(b) the psychosocial impacts on the community, families and individuals
(c) number of people affected
(d) resources required to assist in recovery
(e) which government agencies and non-government organisations could assist in recovery
(f) what financial assistance is available to the community and how can people access it
(g) how we will communicate with the community

The impacts on infrastructure and essential services
(a) identification of the extent of the damage
(b) restoration of essential services as quickly as possible
(c) how best to facilitation the restoration of people’s living conditions and security
(d) prioritising the rebuilding of infrastructure
(e) how we will integrate arrangements with other agencies

The economic and financial impacts


                                                                                              77
Log in to download the original file

2015-06-23 I&S Agenda - Item 5 - Local Disaster Management Plan - Attachment 1(PDF, 2MB).pdf · 1.8 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.