GENERAL NOTES TO BUILDER AND CONTRACTORS
IMPORTANT Do not scale from drawings due to TIE - DOWN information and NOTES:
MEASURE ON SITE TO CHECK variation in paper, depending on Details Refer to Structural 1 Design in accordance with BSA
ALL DIMENSIONS PRIOR TO weather and moisture content. Use Engineers 2 All construction to be in accordance with
SETTING OUT FOR NEW WORK written dimensions only. the following Australian standards and
RUBBISH & DEBRIS Codes as referenced in the Building Code
The builder shail verify location of all DISCREPANCIES All materials deemed to be of Australia
unusable shall be placed ina
Sermicas, al! dimensions and levels Any d rapancras in dimensions of rubbish compound or 2 industrial AS 1735-1975 code of prantice for
Ise
4h
peor ty commencement of any war's these drawings shoud be po. ated out to 69 ang re~svesd rer (he se at piadie saTking
Trls OLading snat be constructed the Cesgne. and ary celaiis rot snown the eatiest opportunity AS 1962.1929 CaS-Qn aad iisialiation of
m accorcance with tne Austrahan should be requested by > bulb-dar in mata! roofing
the
ace
rm
Ocmestic Construction Manual writing no responsibility ts imphed for Scaffolding AS 2050-19289 fing ot roofing tifgs
(ADCM). Building Act and Building any inaccuracles or omissions from these All scaffolding shall be in AS 2870-1988 residential slab and
Codes of Austraiia (BCA) relevant drawings accordance to the Queensiand footings
codes and regulations, and in Heath and Safety obligations and AS 2904-1988 masonry in buildings
accordance to the TRADAC Timber
Framing Manual., and in accordance WATERPROOFING: Waterproofing to the Workplace Health and Safety AS 1684.2-1999 code of practice for
to all Manufacturer's specifications wet areas are to be carried out in Act 1995 construction in timber framing
and installation details. accordance with Standard AS 3740 & NOTES: Written dimensions take preference over
Set-out dimensions shown on the relevant BCA codes and requirements. These drawings shall be read in scale
Site plan shail be confirmed by the conjunction with all other drawings, Garage slab to be as denoted on working
Builder before commencement of TERMITE PROTECTION: The Builder consultants’ drawings drawings
construction & ordering of materials. shall provide for Termite protection to specifications, schedule of finishes Roof water run off to street
Positions of Down Pipes (DP) & be carried out by an approved licensed and with such other written channel/stormwater sewer with pipes
storm water drains and levels are to Pest Contro! specialist in accordance instructions. All and any as shown on
be confirmed before final grading. with AS 2057-1986 or the latest AS discrepancies shail be referred to hydraulics plan @ 1 in 100 fall min U.N.D.)
The builder is to ensure that surface 3660-1 the designer for decision before Level of slab to residence (house) shail be
water (rain water) is to be diverted proceeding with any work. equal on cut and fill, taper batters to 1
from the envelope of the building on Construction shall be in accordance to
in 2 cut and 1 in 4 fill
all sides at all times. AS 1170.1, AS 1170.2 AS 1664, AS Any changes omissions or All wet areas are to comply with BCA
Sanitary drainage shail be in 2870, AS 3600, AS 1480, AS2870-1996 variations which the contractor clauses 3.8.1
accordance to the local authority and the standard Building Laws and may wish to make shail be Lighting & ventilation is to comply with BCA
requirements & with the prepared Building Code of Australia and relevant discussed with the designer before clauses part 3.8.4 & 3.8.5
hydraulics drawings. Check position Codes and the Australian Domestic any work commences Smoke alarms must comply with part 3.7.2
of overflow relief gully & top of slab Construction Manuat for the Terrain
of the BCA
level if required. Category W41N Artificial Ventilation or 10 Provide thresholds to external doors in
A final as build drawing shall be Mechanical Ventilation is to be in accordance wit clause 3.9.1 of BCA
provided to the owner on completion WATERPROOFING: Waterproofing to Accordance to AS i668 Part 2 - (where step down is more that 190 mm)
showing position of all services. wet areas is to be carried out in 1980 3.8.4 & 3.8.5
accordance with Standard AS 3740 &
NOTES: relevant BCA codes and requirements. RENDERING AND PAINTING
These drawings shall be read in Refer to Schedule of finished and
conjunction with all other drawings, consult with the Building
consultants’ drawings SITEWORKS Supervisor or Primary Builder for
specifications, schedule of finishes Refer to Engineer's drawings and details all information pertaining to
and with such other written for all reinforced concrete work, tevels, finishes and colours.
instructions. All and any Retaining Walls Details, Driveways,
discrepancies shall be referred to Ptanter Boxes and any other work
the designer for dacision before Involv.ng Hydrauics or Waterproofing
proceeding vath any work.
LINDSAY 9 Tip LTD
ee
Cov aT Led Fy PL a1 MAS Al =>
mi
At
OFF, 2C/62 PARKER A, HAXOOCHY DOR! PH S& 792 V8
St
8
Nova Design Group Pry Lid Proposed Renovations | GENERAL NOTES
P.O. Box 651 Noosa Heads Qld 4567 Carloyn Searle & Brian Ward
Tel: 07 54 472 996 25 Adam Street Sunshine Beach Project number 1007/4 : A18
Date February 2007,
email: [email protected] ' Drawn by mp ,
a —— —
Checked by mp - Scate
—— ee ee. Ae ee — + - «- se a Lk. - - Seen ad - ee
ee eeSee the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001593F0.001.pdfRelated documentPublic source context ↗
07/1086 Proposed additions & Renovations to residence - 25 Adam St -Att Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.