CONSTRUCTION NOTES
1 All workmanship and materials shalt be in accordance with the requirements of the relevant current
Australian Standard Codes, Building By-Laws and the ordinances of the retevant Loca! Authority.
i) Concrete Class - Minimum 20 MPa at 28 days
Stab on ground - 20 nominal maximum aggregate size
FOUNDATION PLANS - 80 maximum slump +/-10mm
ii) Concrete Class - Mininum 32 MPa at 28 days for internat stabs
Suspended slab - Minimum 40 MPa at 26 days for externat slabs
- 20 nominal maximum aggregate size
- 80 maximum slump +/-10mm
Minimum Cover - 25 to upper face of internal slabs -0 +5mm
to Reinforcement - 45 for external exposure
- 30 to a membrane in contact with the ground
- 40 to unprotected ground
Minimum Laps and Splices for Reinforcement
(a) Slab Fabric - 225 minimum overlap of transverse bars at all edges
(b) Trench Mesh ~ 500 splices in all feoting beams
- Laps at intersections as per the Design Drawings
SITE CLASSIFICATION - S ( Reinforcing Bars - 500 splices in all footing beams
- Provide “L" bars at all beam intersections with 500 laps to each leg
ARTICULATED MASONRY VENEER 5. Fireplaces shall be supported on slab thickening extending 300 past the edges of the masonry, and
reinforced with F72 mesh top and bottom. Slab thickening shall be 150 thick for single storey construction
and 200 thick for two storey construction.
Shrinkage Control
6. Reinforcing mesh may be reduced to F72 for slabs under 18m in length on "S” sites
7. Where the floor stab is to be tiled, the following recommendations are made, in order to
minimise the effect of shrinkage:-
- F92 stab mesh (or equivalent) should be provided
- Placement of tiles should be delayed for as long as possible (preferably for at least 3 months)
EARTHWORKS NOTES:
Where any filling is carried out on the site after the completion of the site investigation, the
following recommendation shail be followed:-
SITE CLASS FOUNDATIONS 8. The site shall be stripped of all vegetation prior to the placement of any filling material.
9. Compaction Standards for filling Material
A. Controlled Filling
CLASS - A Most sand and rock sites with little or no ground movement (a) Sand filling up to 800 deep, placed in maximum 300 thick layers and compacted with a vibrating
from moisture changes. rolter to achieve a minimum Dynamic Cone Penetrometer reading of 7 blows per 300 penetration
(refer AS 1289.F3.3). Sand fill may be flooded if necessary to achieve this compaction standard, 4
Slightly reactive clay sites with only slight ground provided the water can subsequently be drained from the site. iY
CLASS - S movement from moisture changes. (b) Non-sand filling up to 400 deep, placed in maximum 150 thick layers and compacted with a < 7 |
mechanical roller. Clay fill shall be moist during compaction.
(c) Controtted filling shall continue for at least 1 metre past the edge of the footing beam and shall
CLASS - M Moderately reactive clay or silt sites which can experience be battered back to the original surface with a slope of no more than 4:2 (Vert : Hor). Z| | iw
moderate ground movement from moisture changes. (a) Where the depth of filling material exceeds that specified above, the filling material shall be
compacted as follows:-
Highly reactive clay sites, which can experience high Sand fill to 65% Density Index in accordance with AS1289.E6.1
CLASS ground movement from moisture changes. Non-sand fill to 95% Maximum Ory Density (Standard Compaction) in accordance with 5.4.1
Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
Extremely reactive sites, which can experience extreme specified is not achieved, then a "Pier and Slab” and “Pier and Beam” footing design shall be adopted with a
CLASS ground movement from moisture changes. all piers founded on the underlying natural material.
B. Rolled Filling
{a} Sand Filling up to 600 deep, placed in maximum 300 thick layers and compacted by repeated
CLASS A to P Filled sites. rolling with an excavator. iY]
{b) Non-sand filing up to 300 deep, placed in maximum 150 thick layers and compacted by repeated
Sites which include soft soils, such as soft clay or silt or rolling with an excavator,
CLASS loose sands; landslip; mine subsidence; coltapsing soils; (c) Where the depth of filling material exceeds that specified above, the filling material shall be < id
compacted as fotlows:-
soil subject to to erosion; reactive sites subject to abnormal Sand fill to 65% Density index in accordance with AS1289.E6.1 qi
moisture conditions or sites which cannot be classified
Non-sand fill to 95% Maximum Ory Density (Standard Compaction) in accordance with 5.4.1
otherwise. Compaction tests shall be carried out on each layer as the filling is placed. if the compaction standard
specified is not achieved, then a “Pier and Slab” and “Pier and Beam” footing design shall be adopted with \ |
all piers founded on the natural underlying material.See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
001593F0.001.pdfRelated documentPublic source context ↗
07/1086 Proposed additions & Renovations to residence - 25 Adam St -Att Plans [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.