4)
                                                                                                                                                                 CONSTRUCTION NOTES
                                                                                                                                                                 1   All workmanship and materials shalt be in accordance with the requirements of the relevant current
                                                                                                                                                                     Australian Standard Codes, Building By-Laws and the ordinances of the retevant Loca! Authority.
                                                                                                                                                                      i) Concrete Class              - Minimum 20 MPa at 28 days
                                                                                                                                                                        Stab on ground               - 20 nominal maximum aggregate size
                                     FOUNDATION                       PLANS                                                                                                                          - 80 maximum slump +/-10mm
                                                                                                                                                                      ii) Concrete Class             - Mininum 32 MPa at 28 days for internat stabs
                                                                                                                                                                         Suspended slab              - Minimum 40 MPa at 26 days for externat slabs
                                                                                                                                                                                                     - 20 nominal maximum aggregate size
                                                                                                                                                                                                     - 80 maximum slump +/-10mm
                                                                                                                                                                      Minimum Cover                  - 25 to upper face of internal slabs -0 +5mm
                                                                                                                                                                      to Reinforcement               - 45 for external exposure
                                                                                                                                                                                                     - 30 to a membrane in contact with the ground
                                                                                                                                                                                                     - 40 to unprotected ground
                                                                                                                                                                      Minimum Laps and Splices for Reinforcement
                                                                                                                                                                        (a)   Slab Fabric            - 225 minimum overlap of transverse bars at all edges
                                                                                                                                                                        (b)   Trench Mesh            ~ 500 splices in all feoting beams
                                                                                                                                                                                                     - Laps at intersections as per the Design Drawings
                          SITE         CLASSIFICATION                           -    S                                                                                  (     Reinforcing Bars       - 500 splices in all footing beams
                                                                                                                                                                                                     - Provide “L" bars at all beam intersections with 500 laps to each leg
                     ARTICULATED                         MASONRY                   VENEER                                                                       5.  Fireplaces shall be supported on slab thickening extending 300 past the edges of the masonry, and
                                                                                                                                                                     reinforced with F72 mesh top and bottom. Slab thickening shall be 150 thick for single storey construction
                                                                                                                                                                     and 200 thick for two storey construction.
                                                                                                                                                                 Shrinkage Control
                                                                                                                                                                 6. Reinforcing mesh may be reduced to F72 for slabs under 18m in length on "S” sites
                                                                                                                                                                 7. Where the floor stab is to be tiled, the following recommendations are made, in order to
                                                                                                                                                                     minimise the effect of shrinkage:-
                                                                                                                                                                         - F92 stab mesh (or equivalent) should be provided
                                                                                                                                                                         - Placement of tiles should be delayed for as long as possible (preferably for at least 3 months)
                                                                                                                                                                  EARTHWORKS NOTES:
                                                                                                                                                                  Where any filling is carried out on the site after the completion of the site investigation, the
                                                                                                                                                                  following recommendation shail be followed:-
              SITE CLASS           FOUNDATIONS                                                                                                                    8. The site shall be stripped of all vegetation prior to the placement of any filling material.
                                                                                                                                                                  9. Compaction Standards for filling Material
                                                                                                                                                                    A. Controlled Filling
              CLASS - A            Most sand and rock sites with little or no ground movement                                                                          (a)  Sand filling up to 800 deep, placed in maximum 300 thick layers and compacted with a vibrating
                                   from moisture changes.                                                                                                                   rolter to achieve a minimum Dynamic Cone Penetrometer reading of 7 blows per 300 penetration
                                                                                                                                                                            (refer AS 1289.F3.3). Sand fill may be flooded if necessary to achieve this compaction standard,                   4
                                   Slightly reactive clay sites with only slight ground                                                                                     provided the water can subsequently be drained from the site.                                                       iY
              CLASS - S            movement from moisture changes.                                                                                                     (b)  Non-sand filling up to 400 deep, placed in maximum 150 thick layers and compacted with a                     <     7 |
                                                                                                                                                                            mechanical roller. Clay fill shall be moist during compaction.
                                                                                                                                                                       (c)  Controtted filling shall continue for at least 1 metre past the edge of the footing beam and shall
              CLASS - M             Moderately reactive clay or silt sites which can experience                                                                             be battered back to the original surface with a slope of no more than 4:2 (Vert : Hor).                            Z|       | iw
                                    moderate ground movement from moisture changes.                                                                                    (a)  Where the depth of filling material exceeds that specified above, the filling material shall be
                                                                                                                                                                            compacted as follows:-
                                    Highly reactive clay sites, which can experience high                                                                                        Sand fill to 65% Density Index in accordance with AS1289.E6.1
              CLASS                 ground movement from moisture changes.                                                                                                       Non-sand fill to 95% Maximum Ory Density (Standard Compaction) in accordance with 5.4.1
                                                                                                                                                                  Compaction tests shall be carried out on each layer as the filling is placed. If the compaction standard
                                    Extremely reactive sites, which can experience extreme                                                                        specified is not achieved, then a "Pier and Slab” and “Pier and Beam” footing design shall be adopted with                   a
              CLASS                 ground movement from moisture changes.                                                                                        all piers founded on the underlying natural material.
                                                                                                                                                                    B.  Rolled Filling
                                                                                                                                                                         {a} Sand Filling up to 600 deep, placed in maximum 300 thick layers and compacted by repeated
              CLASS     A to P      Filled sites.                                                                                                                            rolling with an excavator.                                                                                         iY]
                                                                                                                                                                         {b) Non-sand filing up to 300 deep, placed in maximum 150 thick layers and compacted by repeated
                                    Sites which include soft soils, such as soft clay or silt or                                                                             rolling with an excavator,
              CLASS                 loose sands; landslip; mine subsidence; coltapsing       soils;                                                                      (c) Where the depth of filling material exceeds that specified above, the filling material shall be             <      id
                                                                                                                                                                             compacted as fotlows:-
                                    soil subject to to erosion; reactive sites subject to abnormal                                                                                Sand fill to 65% Density index in accordance with AS1289.E6.1                                                qi
                                    moisture conditions or sites which cannot be classified
                                                                                                                                                                                  Non-sand fill to 95% Maximum Ory Density (Standard Compaction) in accordance with 5.4.1
                                    otherwise.                                                                                                                    Compaction tests shall be carried out on each layer as the filling is placed. if the compaction standard
                                                                                                                                                                  specified is not achieved, then a “Pier and Slab” and “Pier and Beam” footing design shall be adopted with           \                |
                                                                                                                                                                  all piers founded on the natural underlying material.

Used in these records

About this file

File size
2.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001593F0.001.pdf · 2.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.