Original source · versioned page text
2019-03-12 P&E Agenda - Item 5 - Attachment 2 - Koala Infrastructure & Feasibility Report
Very large file: it may take a few minutes
The original of this document is very large (31.9 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Monks Bridge – Barriers on Road Monks Bridge – Good passageway Monks Bridge – pathway under
bridge
Monks Bridge – Roadway under Monks Bridge – Could climb tree Culvert – on Eenie Ck Rd
bridge onto overhanging branches
Girraween Bridge – Gap in Koala Girraween Bridge – Koala exclusion Koala Footbridge – Existing timber
fence gates bridge
Koala Footbridge – Existing Koala Footbridge – Track keeping Koala Footbridge – above Eenie Ck
exclusion fence joins footbridge vegetation maintained Rd
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.