Decision Notice - 010.2008.00001584.001 [As Published] · 132008.1584
2008/1584
C4.0 Sections – Chris Clout Design 5 September 2008
and as may be amended by these conditions and annotations on the plans.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. A rainwater storage tank with a minimum capacity of 5000 litres shall be provided on site to
service the detached house. The tank is to be installed to ensure water from the tank can be
used both:
3.1 For external use such as watering gardens, irrigation, ornamental ponds or water
features, topping up swimming pools, outdoor cleaning; and
3.2 For use in flushing of toilets internal to the building.
4. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
5. The building height shall not exceed 8.0 metres above natural and finished ground level.
6. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
6.1 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
6.2 Disposal for firewood.
6.3 Disposal for landscaping purposes.
6.4 Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
6.5 The Applicant is advised that other methods may be considered provided full details of
the method are submitted.
6.6 The applicant is advised that burning off is an unacceptable method of disposal.
7. To ensure Council’s sewer main is accessible for maintenance purposes and is protected from
risk of damage no structures requiring a building permit (including buildings, swimming pools,
retaining walls, raised terraces, stairs) shall be constructed within the ‘Zone of Influence’. See
Attachment 1 for Planting and Landscaping Guidelines.
8. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) are
not constructed under overhead electricity transmission lines, or within any easements.
9. A minimum of 10 tube stock shrubs consisting of native, endemic species shall be planted to
the south western corner of the site to screen the building from the street.
10. Sediment and erosion control measures must be placed on site prior to the works
commencing and shall be maintained until all works are complete. The erosion and sediment
control measures shall be in accordance with the “Best practice guidelines for control of
stormwater on building sites” prepared by Healthy Waterways (available at
www.healthywaterways.org).
Currency
11. The Development Permit for a material change of use lapses if the use has not happened by
11 November 2012, unless an application to extend the currency is approved by Council.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - 010.2008.00001584.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.