Original source · versioned page text
2022-08-09 Services & Organisation Committee Agenda
The original of this document is very large (15.6 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 9 AUGUST 2022
Page 38 of 71
SERVICES & ORGANISATION COMMITTEE MEETING AGENDA 9 AUGUST 2022
Noosa Shire Council
Guiding Principles for Tree Management
2. Beaspecies that may cause significant infrastructure damage such as Fig species and Weeping
Paperbarks (Melaleuca leucadenadra).
3. Beaspecies that results in a disproportionate requirement for management resources such as
Coconut Palms at Main Beach, Noosa Heads and Cabbage Tree Palms in Noosa Waters estate.
If a species planted in the urban forest is considered to meet any one of these requirements, initial
consideration will be given to management strategies to reduce its adverse impacts, which may include
removal and replacement with a more suitable species or in a better location.
6.3 Annual Proactive Tree Works Program
Since 2019, Council has undertaken a proactive tree works program as guided by the Arboricultural
Management Strategy. The approach has been to select two suburbs each financial year for a
comprehensive tree works program including pruning, dead-wooding, removal of defective tree specimens
and removal and replacement of unsuitable tree species, and including relevant precincts as outlined in
Section 3.1. The areas are scoped by Council's Arborist and trees requiring works are quantified and the
operational budget is then prepared accordingly. Works packages are then procured via Invitation to Quote
to Council’s Tree Management and Maintenance Services panel of contractors and this competitive process
allows for cost-effective pricing. Comprehensive communications to affected residents and the general
community is then undertaken prior to works commencing.
The proactive program is based on a 5-year cyclical delivery schedule, with the intent being that after the
first 5-year rotation, the quantity of tree works and related customer requests will be significantly reduced,
as well as future operational budget amounts.
The current annual proactive tree works program is as follows:
2019/20 — Sunrise Beach, Castaways, Marcus Beach
2020/21 — Tewantin, Peregian Beach
2021/22 — Sunshine Beach, Noosa Heads Area 1
2022/23 — Noosa Heads Area 2, Noosaville Area 1
2023/24 — Noosaville Area 2, Hinterland
6.4 Roadside Height and Width Clearing Program
Height and width clearing is required as part of roadside management activities and to ensure road safety
and key infrastructure are maintained, especially on roads with higher speed limits. Roads in the Noosa
Shire are categorised into a hierarchy of Arterial, Distributor, Collector and Local Road types. Height and
width clearing specifications have been applied to each category, although mainly apply to Arterial and
Distributor roads which have speeds between 60kmph and 80kmph (roads with speed limits above
80kmph are managed by the Department of Transport & Main Roads), as Collector and Local roads tend
to have footpaths and managed private frontages within the road verge zones. Some examples of Arterial
and Distributor roads within Noosa Shire which are subject to periodic height and width clearing include:
e Eenie Creek Road
e Beckmans Road
e Reef Street
e Walter Hay Drive
e David Low Way
There are also a number of examples of rural roads within the Noosa Shire hinterland where height and
width clearing is periodically undertaken.
The height clearance specification and the width clearance (or setback) from edge of kerb vary according
to road type (see Appendix E) and also to situation within each road i.e. topography, significance of tree
specimens, road alignment and curvature. In these types of situations, guidance will be sought from
Council's Traffic Engineers as well as Civil Works staff.
Height and width clearing operations are scheduled on an annual program according to road hierarchy.
NoosaShireCouncih 000
Page 38 of 71See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.