Council archive · source document
Attachment 1 - Code Assessment · MCU23/0030
Attachment 1 – Code Assessments
Performance outcomes Acceptable Outcomes Response
1. a level of infrastructure and services that is infrastructure networks (where available to the
appropriate to its setting and sufficient for lot).
the intended use;
2. an effluent treatment and disposal system AO5.2
that does not have an adverse effect Where there is no reticulated water supply, the Not applicable
on ecologically important areas or water premises is serviced with a rainwater tank with the
quality; and following minimum water supply capacity:
3. adequate onsite water storage to support
the efficient use of water and is adequate 1. for dwellings with no more than 3
for everyday use of the occupants. bedrooms – 45,000 litres; or
2. for dwellings of more than 3 bedrooms or
where including a secondary dwelling on
the same premises – 60,000 litres.
AO5.3 Not applicable
If located on a lot where reticulated sewerage is not
available to the lot, the dwelling is connected to an
on-site effluent treatment and disposal system.
Landscaping AO6 Complies
PO6 Soft landscaping is provided and retained to a A minimum of 20% of the site is retained for soft
Buildings and structures allow for sufficient space minimum of 20% of the site area. landscaping as shown on the architectural drawings.
for outdoor activities, garden areas and screening
to surrounding land uses.
Car parking AO7 Complies
PO7 Car parking is provided in accordance with Table The proposed dwelling incorporates a double
9.4.1.4 of the Driveways and parking code. garage within the basement level.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 1 - Code Assessment .pdfRelated documentApplication case desk ↗
About this file
- File size
- 434 KB (small file)
- File type
No other editions are linked here.