Original source · versioned page text
Approved Plans MCU22-0133
Original PDF page 2, section 1. The text section number identifies this passage in the reader.
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawn DRAWING LIST GENERAL NOTES STORMWATER SITE GENERAL NOTES
PROPOSED RESIDENCES 001
002
SITE PLAN & GENERAL NOTES
FLOOR PLAN
1
1
DO NOT SCALE OFF DRAWINGS.USE FIGURED
DIMENSIONS.
DRAINAGE IN ACCORDANCE WITH A.S 3500. TO BE DISCHARGED
TO WATER TANK AS PER HYDRAULIC CONSULTANTS
DRAWINGS
ALL BOUNDARY CLEARANCES SHOWN ARE TO BE VERIFIED BY
BUILDER AT SETOUT & PRIOR TO ANY CONSTRUCTION
LOT 8 HINTERLAND CLOSE 003
004
005
ELEVATIONS
SECTIONS
SLAB & FLOOR PLANS
1
1
1
WE THE DRAFTSMEN & DESIGNERS HEREFORE TAKE NO
RESPONSABILITY FOR THE SITE DETAILS AS SHOWN IF
CHANGES OR ALTERATIONS ARE MADE TO THE PLAN
OTHER
ALL WORK TO BE IN ACCORDANCE WITH THE REQUIREMENTS
OF THE NATIONAL CONSTRUCTION CODES
COMMENCING.
STABILISED CUT & FILL BATTERS TO BE A MINIMUM OF 1000mm
AWAY FROM FOOTINGS
006 3D VIEWS
TINBEERWAH 007 SITE SURVEY
DURING OR PRIOR TO CONSTRUCTION WITHOUT
WRITTEN NOTICE AND APPROVAL. CONCRETE FOOTINGS AND SLAB TO BE CONSTRUCTED IN
ACCORDANCE WITH AS2870 & ENGINEERS DRAWINGS.
CUT/FILL INICATED ON PLAN MAY VARY AT CONSTRUCTION
STAGE, BUILDER TO VERIFY AND ADJUST AS REQUIRED.
BUILDER TO VERIFY ALL DIMENSIONS AND LEVELS ON
PLAN BEFORE COMMENCEMENT OF PROJECT AS NO PROVIDE BRACING AND TIEDOWN TO TIMBER FRAMING IN ANY VARIATION TO SITE WORKS AT CONSTRUCTION STAGE IS TO
RESPONSABILITY TAKEN AFTER STARTING ACCORDANCE WITH AS 1684.2/1684.3. REFER TO ENGINEERS COMPLY WITH THE COUnCILS POLICY ON EARTHWORKS AND
FLOOR AREAS DRAWINGS FOR DETAILS. DRAINAGE FOR RESIDENTIAL SITES
BUILDERS RESPONSIBILITY TO ENSURE COMPLIANCE
DECK 5.41 m² WITH RELEVANT CODES & REGULATIONS. EXTERNAL FITTINGS AND FIXTURES TO BE HOT DIP SITEWORKS INDICATED ON THIS PLAN AREA FOR CONSTRUCTION
FIRST FLOOR 235.77 m² GALVANISED OR CORROSION RESISTANT MATERIAL. PURPOSES ONLY. IT IS THE CLIENTS RESPONSABILITY TO CARRY
GARAGE 77.86 m² DRAWINGS TO BE READ IN CONJUNCTION WITH ALL OUT ALL LANDSCAPING DRAINAGE & RETAINING IF NECESSARY
CONSULTANTS DOCUMENTATION SMOKE ALARMS AFTER COMPLETION OF CONSTRUCTION.
POOL 36.61 m²
PROVIDE SMOKE ALARMS TO RESIDENCE IN ACCORDANCE WITH
VERANDAH 62.89 m² 2
FLOOR FINISHES AS SELECTED BY OWNER PART 3.7.2 OF THE N.C.C VOL 2 ALARMS SHALL BE ALL LANDSCAPING AND SCREENING TO LOCAL COUNCIL
WATER TANK 51.64 m² CONNECTED TO MAINS POWER. REFER TO ELECTRICAL REQUIREMENTS AS REQUIRED.
470.18 m² ELECTRICAL METRE BOX, EXTERNAL HOSE COCKS, DRAWINGS FOR DETAILS.
SITE AREA 5593.764 m CEILING, MAN HOLES & RC PAD FOR HOT WATER CONTOURS AND LEVELS SHOWN ON PLAN ARE TAKEN FROM
SITE COVER 345.13 sqm (6.17%) CYLINDER TO BE DETERMINED BY BUILDER ON SITE & WET AREAS LEVELS SUPPLIED BY SURVEYOR AND NO RESPONSABILITY IS
CO-ORDINATED WITH OWNER PROVIDE WATERPROOFING TO WET AREAS. PROVIDE F.C LINING TAKEN FOR ACCURACY OR SUBSEQUENT CUT / FILL LEVELS.
SUITABLE FOR WET AREA CONSTRUCTION TO WET AREA
CONSTRUCTION WALLS IN ACCORDANCE WITH N.C.C VOL. 2 PART 3.8.1. BUILDING PADS CUT TO ALLOW GROUND WATER TO DRAIN AWAY
ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH THE FROM DWELLING ALL ROUND MIN 1:20 FALL
BUILDING CODE OF AUSTRALIA AND LOCAL GOVERNMENT
TERMITE PROTECTION
REGULATIONS. WET AREA FLOORS TO FALL 10mm MIN. TO F.W. USE LOCATION OF EXISTING SERVICES TO BE VERIFIED BY BUILDER
PROVIDE BARRIER TERMITE PROTECTION AS PER A.S 3660.1
ONLY APPROVED FLOORING IN WET AREAS OVER TIMBER PRIOR TO CONSTRUCTION
AND N.C.C VOL. 2 FIGURE 3.1.3.2
STRUCTURE TO COMPLY WITH A.S 3740.
BUSH FIRE ATTACK SITEWORKS TO COMPLY WITH N.C.C VOL 2 PART 3.1.1
ENERGY EFFICENCY EARTHWORKS. DRAINAGE TO COMPLY WITH N.C.C VOL 2 PART 3.1.2
REFER TO BUSH FIRE RISK ASSESMENT & MANAGMENT PLANS.
TO COMPLY WITH N.C.C ENERGY EFFICENCY VOL. 2 PART 3.12. DRAINAGE. REFER TO ENGINEERS DRAWINGS FOR ANY ADDITIONAL
PLANS TO BE READ IN CONJUNCTION WITH ECOLOGICAL
REFER TO ENERGY EFFICENCY REPORT BY OTHERS FOR ENERGY DETAILS
NATURAL AREA MANAGMENT DOCUMENTATION. CONSTRUCTION
EFFCIENCY REQUIREMENTS
& MATERIAL SELECTIONS TO BE IN ACCORDANCE See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLarge file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.