Appendix B - Stormwater Management Plan
Attached to the e-mail Response to Council's Request for Information (REC17 /0011) - Email 01 of 01.
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnOther adjacent properties at 21 and 23 Tait Street.
It is likely that 21 and 23 Tait Street have existing overland flow issues from upstream properties at 16 and
possibly 18 Eagle Drive. The improvements obtained by having a flow path through 14 Eagle Drive and raising
verge of Eagle drive to take road flows will also reduce overland flow at these properties.
In addition it is proposed to add a landscaped bund beside 21 Tait Street to ensure that overland flow through
park has 300mm freeboard to QUDM requirements. The property at 21 Tait Street has a floor level close to park
level and verbal advice indicates there is existing flooding from park flow path which heads in a north west
direction (refer to contours on plan 1702-02A and 1702-02A).
As previously noted there will be an increase of flow to 14 Eagle Drive due to subdivision road construction which
is un-avoidable and as per Council drainage catchments and natural extension of Eagle Drive. This also means
there will be increased flow through Park at 15 Tait Street, even though subdivisions upstream will limit flow to
pre-developed amounts by detention. To protect 21 Eagle drive from Park overland flow, a landscaped bund will
be added to protect the property and provide 300mm freeboard as per plan 1702-02A. Once flow enters Tait
Street the water continues to existing sag and west into Road reserve/channel, where adjacent houses are well
above road levels. The Tait Street stormwater system was designed to Council master stormwater plans so the
proposed flow to this location was previously planned for.
Point 5.1.4: Properties at 31, 29, 27 and 25 Tait Street.
29 Tait Street: Existing Catchment = 0.3Ha,
180m length of grass/treed area at 3.4%, tc = 18 minutes,
fi = 0, C10 = 0.70, C5 = 0.67, C100 = 0.84.
Q5 = FCIA = 1/360 x 0.67 x 121 x 0.3 = 0.068cumecs
Q100 = FCIA = 1/360 x 0.84 x 195 x 0.3 = 0.137cumecs
29 Tait Street: Developed Catchment = 0.06Ha,
Urban lot area at 3.4%, tc = 6 minutes,
fi = 0.4, C10 = 0.78, C5 = 0.74, C100 = 0.94.
Q5 = FCIA = 1/360 x 0.74 x 190 x 0.06
= 0.023cumecs - 0.010cumecs roofwater = 0.013cumecs
Q100 = FCIA = 1/360 x 0.94 x 303 x 0.06
= 0.047cumecs - 0.010cumecs roofwater = 0.037cumecs
House Pre-development Post-development flow Pre-development flow Post-development flow
number flow Q5 in cumecs Q5 in cumecs Q100 in cumecs Q100 in cumecs
29 0.068 0.013 0.137 0.037
So mostly due to new road catchment and roofwater drainage a significant reduction in flow occurs as a result of
development without any detention. Detention for overall flow increases from subdivision will be dealt with at 14
Eagle Drive basin.
A similar order of flow reduction will apply for lots 23, 25, 27, 29, 31, 33 Tait Street.
pg. 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.